flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Brown University tops off first housing building in three decades

Coronavirus

Brown University tops off first housing building in three decades

The facility, scheduled for completion next April, will combine a residence hall with student health services.


By John Caulfield, Senior Editor | June 18, 2020

Among the infection-control protocols that Shawmut Design and Construction rolled out on the Brown University project is Shawmut Vitals, which allows workers to self-certify daily health screenings by scanning a job-specific QR code. Image: Shawmut 

Brown University in Providence, R.I., earlier this month celebrated the virtual topping off of a 96,000-sf wellness center and 162-bed residence hall that, when they open for the fall semester in 2021, will be inside the first new building in Brown’s housing portfolio in 30 years.

The facility is designed to meet LEED v4 Silver standards using Fitwel and WELL certification systems as guidelines. The building will bring together several services for student mental and physical wellbeing, including Health Services, Counseling and Psychological Services, Brown Emergency Medical Services, and BWell, the university’s health promotion program.  

The project is part of a strategic sourcing program between Brown University and the construction management firm Shawmut Design and Construction, which is completing this building in partnership with the architecture firm William Rawn Associates. Brown states on its website that the building is a prototype implementation of the vision and principles underlying the university’s Undergraduate Housing Master Plan update (2018).

STEEL-MASS TIMBER STRUCTURE

This photo shows the exterior construction progress that includes a cross-laminated timber deck. Image: Shawmut

 

The building features a hybrid system of steel framing and cross-laminated timber that will lower the structure’s carbon footprint. The building’s approach to sustainability make it “a one-of-a-kind residential and academic experience that will be a model for holistic student learning and engagement,” said Ron Simoneau, Shawmut’s executive vice president of Education, in a prepared statement.

This project’s Building Team includes LeMessurier Consultants (SE), Vanasse Hangen Brustline (CE), Stephen Stimon Associates (landscape), Accentech (acoustics), Jensen Hughes (code/fire alarm/fire protection), The Green Engineer (sustainability), Adelman and Lelek Engineering (energy modeling), GZA Environmental (Geotech), Environmental Systems (HVAC), Sterling Engineering (EE), and Harry Grodsky & Co. (PE).

The residence hall, on the upper floors of the building, will include a mix of single bedrooms and four-person suites. The health services will be co-located on the lower floors along with the student-led EMS department. (The building will have five floors on its south side, where the ambulance bay is located, and four floors on its north side. The site slopes 12.5 ft from south to north.)

COVID-19 RISK MITIGATION PROTOCOLS

A rendering of Brown University's new Wellness Center and residence hall, which will be ready for the 2021 fall semester. Image: William Rawn Associates

 

The building will have natural wood ceilings and a visible wood deck. All building systems are electric, and mechanical systems will have energy recovery technology, aligning with Brown’s pledge to reduce campus greenhouse gas emissions to net-zero by 2040.

On this project, Shawmut has rolled out new procedures to minimize the potential risk from the coronavirus. These include protocols such as Shawmut Vitals, a custom technology platform that allows team members to self-certify daily health screenings by scanning a job-specific QR code and completing a health survey. Workers have their temperatures before being allowed onsite and are issued personal protection equipment.

A spokesperson for Shawmut tells BD+C that the Building Team was still reviewing possible adjustments to the building’s design that would abet infection control. The building already incorporates a “ramped up” air ventilation and filtration system with the wellness center integration, this spokesperson says.

Neither Brown University nor Shawmut disclosed the cost of this building.

Related Stories

Office Buildings | Jun 28, 2023

When office-to-residential conversion works

The cost and design challenges involved with office-to-residential conversions can be daunting; designers need to devise creative uses to fully utilize the space.

Arenas | May 18, 2023

How can we reimagine live sports experiences?

A Gensler survey finds what sports fans' experiences have been like returning to arenas, and their expectations going forward.

Headquarters | May 15, 2023

The new definition of Class A property

Dan Cheetham, Managing Director and Founder of FYOOG, believes organizations returning to a "hub and spoke" model could have a profound effect on properties once considered Class B.

Office Buildings | May 5, 2023

9 workplace design trends for 2023

HOK Director of WorkPlace Kay Sargent and Director of Interiors Tom Polucci discuss the trends shaping office design in 2023.

Multifamily Housing | Apr 4, 2023

Acing your multifamily housing amenities for the modern renter

Eighty-seven percent of residents consider amenities when signing or renewing a lease. Here are three essential amenity areas to focus on, according to market research and trends.

Urban Planning | Mar 16, 2023

Three interconnected solutions for 'saving' urban centers

Gensler Co-CEO Andy Cohen explores how the global pandemic affected city life, and gives three solutions for revitalizing these urban centers.

Laboratories | Mar 9, 2023

5 laboratory design choices that accelerate scientific discovery

Stephen Blair, director of CannonDesign's Science & Technology Practice, identifies five important design strategies to make the most out of our research laboratories.

Augmented Reality | Jan 27, 2023

Enhancing our M.O.O.D. through augmented reality therapy rooms

Perkins Eastman’s M.O.O.D. Space aims to make mental healthcare more accessible—and mental health more achievable.

K-12 Schools | Nov 30, 2022

School districts are prioritizing federal funds for air filtration, HVAC upgrades

U.S. school districts are widely planning to use funds from last year’s American Rescue Plan (ARP) to upgrade or improve air filtration and heating/cooling systems, according to a report from the Center for Green Schools at the U.S. Green Building Council. The report, “School Facilities Funding in the Pandemic,” says air filtration and HVAC upgrades are the top facility improvement choice for the 5,004 school districts included in the analysis.

Giants 400 | Nov 14, 2022

4 emerging trends from BD+C's 2022 Giants 400 Report

Regenerative design, cognitive health, and jobsite robotics highlight the top trends from the 519 design and construction firms that participated in BD+C's 2022 Giants 400 Report.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021