flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Video Blog: How today’s construction firms are bridging the BIM gap

Video Blog: How today’s construction firms are bridging the BIM gap


Sasha Reed | May 28, 2014

I recently had the opportunity to travel to Manhattan to attend ENR’s Global Construction Summit. This is two day event that has both panel discussions as well as an award show honoring some of the best global construction projects. There was one panel discussion in particular that caught my attention, and so I thought I’d share it with you.  

It was with Turner Construction and Parsons Brinckerhoff. Each of these companies talked about the way BIM has truly revolutionized the way that they conduct projects—how technology has allowed them to leverage collaboration in such a way that they can work with decentralized teams. Parsons Brinckerhoff talked about the future and ways that they are leveraging gaming technology to visualize and share information with stakeholders, as well as owners. This allows them to visualize the project and implant 4D information so that they can virtually watch the project over time.  

Turner Construction talked about something a little closer to home and more aligned with what I’m used to talking to customers about, and that was the Wilshire Grand project. This is a record-breaking project of a 73-story high-rise here in downtown LA. When completed, it will be the tallest building west of the Mississippi.  

 

 

I don’t know if you heard about this, but they had something called “The Big Pour” back in February, where they took on the monumental task of a single, 24-hour pour of more than 21,000 cubic yards of concrete. Not an easy task. During the panel discussion, Turner talked about how they leveraged BIM for this particular part of the process. They modeled the entire pour, and the end result was they came within 1% of what they estimated their materials to be. They totally hit it out of the park.

I actually had a chance to go to downtown LA and watch the pour. I watched it with Shobhit Baadkar of TITAN AEC. He partnered with Turner Construction to help them with this BIM implementation. He worked with the concrete partner, who previously didn’t have a lot of BIM experience. He took the data the partner had, which at the time was Excel spreadsheets of concrete pour data and time data, and brought it into the model. He was able to model everything, from the trucks coming off of the freeway, to the pour time at the station, to leaving, to the next truck coming in. Obviously they did a phenomenal job because they were able to execute within such a close percentage.  

At the end of this panel discussion, there was a question that was asked from the audience: Are you finding qualified talent to work within your firms, who can blend technology and trade experience or construction experience? The answer was there truly is a gap that’s developed. There are those who are construction professionals who have been doing their job for years and know the industry inside and out, and there are those who are adept at understanding technology.  Being able to find that person who can blend together the technology along with their industry experience is a challenge. There is a gap.  

What Turner did to partner with a BIM consultant to bridge that gap, specifically for this one part and component of the project, I thought was brilliant. It truly allows you to mobilize your teams, reach out to the trade professions, and help bring them into the process without leaving them behind. It creates true value that not only the overall project team sees, but your trade partners see as well.  

So I wanted to pose this question to you: In your firms, are you seeing the same gap between the knowledge workers and those who understand technology? And if you are, what are you doing to bridge that gap?  

I hope that you can share the ways that you bridge that gap here, in the comment section below. I’d love for you to share your ideas with us. Or let us know if this isn’t something that you’re struggling with as a challenge or reality within your firm. Either way, I’d love to hear your thoughts on the idea.  Thank you so much for listening to the blog and I look forward to the discussion.

Editor's note: This is sponsored content. The text and video were provided by the sponsor company. 

More from Author

Sasha Reed | Dec 15, 2017

Future vs. current state of construction innovation: How will we make the leap?

Looking beyond today’s constraints to the possibility of what “could be” is a key characteristic of those defining and delivering innovation to design and building firms across the globe.

Sasha Reed | Sep 19, 2017

BIM vs VDC…how the US and the UK differ in approaching digital project delivery

In this four-part series, Bluebeam VP Sasha Reed sat down with industry experts to examine the need for defining and understanding digital workflows and data management throughout the design and construction project lifecycle.

Sasha Reed | Jul 19, 2017

Introducing StrXur by Bluebeam

Our goal is to present unique perspectives you may not be able to find anywhere else.  

Sasha Reed | Jul 13, 2017

Defining the future by mastering the art of change

From my perspective, what separates organizations thriving in the digital revolution from those who are not boils down to one thing: leadership.

Sasha Reed | Mar 15, 2017

Incentivizing change: Show me the money

Who is succeeding, and on what terms? And what will it take for everyone to experience the benefits of that success?

Sasha Reed | Oct 4, 2016

The talent shortage: Will the training the AEC industry desperately needs arrive in time?

As the construction industry bounces back from the Great Recession, an entirely new class of tech-savvy construction professionals has been created, and the supply of these highly skilled, tech-proficient pros has been quickly exhausted. 

Sasha Reed | Jul 11, 2016

Construction Disruption at AECX: Technology, hackathons and the promise of change in LA

The lead up to AECX featured a discussion providing insight into the current state of the AEC technological revolution by exploring opportunities, challenges and choices AEC pros face.  

Sasha Reed | Jun 23, 2016

Implementing Change: The Five Biggest Mistakes to Avoid

Two truths from the jobsite: 1) The best part about uncovering a problem is discovering its solution, and 2) The worst part about discovering the solution is implementing it. 

Sasha Reed | Jun 9, 2016

With all these sharks in the water… (No Predictions Here...Part 2)

Rather than fighting to control the proliferation of apps, perhaps we should be training our eyes to look for signs of long-term viability among all the fins in the water

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021