Arriscraft thin-clad stone solution provides ASHRAE 90.1 compliance

Sponsored Content Insulation

Arriscraft thin-clad stone solution provides ASHRAE 90.1 compliance

Naturally-made Arriscraft stone offers both the aesthetic and durability qualities needed for the Mountain Point Medical Centre in Lehi, Utah.


By Arriscraft | October 26, 2016

The Building Codes are changing and are now requiring higher performance requirements for the thermal envelope.  The way we once built will be just that, a thing of the past, as the cladding industry evolves.  For a long time the building science field has acknowledged the weaknesses of our current construction means and methods, such as conductive heat loss/gain through large amounts of thermal bridging and this is what has driven the most recent changes to the building codes in North America.  As such, most of these codes have now adopted ASHRAE 90.1 such as the International Building Code (IBC) in the United States or they adopted a set of standards of their own similar to ASHRAE 90.1 like the supplementary conditions contained in the Ontario Building Code (OBC) SB-10 requirements to achieve better thermal performance in the building envelope.  For veneer walls, these updated code requirements now make it mandatory for new construction to reduce thermal bridging and achieve higher effective R-Values (lower U-Values) for the wall assemblies.

 

 

For builders and designers seeking ASHRAE 90.1 compliant veneer wall systems, the Arriscraft ARRIS.clip Gridworx assembly is a great option.

In designing the leading-edge Mountain Point Medical Centre in Lehi, Utah, Earl Swensson Associates needed a modern, high-performance façade. Choosing naturally-made Arriscraft stone offered both the aesthetic and durability qualities needed for the project. The smooth ARRIS.clip selection integrated well into the overall modern design of the facility.

The ARRIS.clip thin stone was installed using the Gridworx aluminum stone hanging system and their Discrete Girt / Z-channel assembly, creating a back drained and ventilated open rainscreen façade and providing a system that provided the higher effective R-value they needed to achieve ASHRAE 90.1 compliance.

 

 

This Arriscraft ARRIS.clip and Gridworx ASHRAE 90.1 compliant assembly meets or exceeds the thermal requirements for climate zones 1 through 8 (which covers all of North America).

 

Project Details:
Project: Mountain Point Medical Centre
Location: Lehi, Utah
Architect: Earl Swensson Associates
Product: CSMU-clip (ARRIS-clip Renaissance®) Units, 12” Smooth – Standard (Sunset)

Tags

Related Stories

| Feb 11, 2011

Four Products That Stand Up to Hurricanes

What do a panelized wall system, a newly developed roof hatch, spray polyurethane foam, and a custom-made curtain wall have in common? They’ve been extensively researched and tested for their ability to take abuse from the likes of Hurricane Katrina.

| Feb 9, 2011

Kingspan Insulated Panels Announces Path to NetZero Mobile App

Kingspan Insulated Panels North America, a global manufacturer of insulated metal panels, announces the availability of its new Path to NetZero mobile app. Introduced at Greenbuild 2010, this unique tool for the building industry simulates the process of achieving high-performance and net-zero buildings.

| Dec 17, 2010

5 Tips on Building with SIPs

Structural insulated panels are gaining the attention of Building Teams interested in achieving high-performance building envelopes in commercial, industrial, and institutional projects.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Sep 13, 2010

Data Centers Keeping Energy, Security in Check

Power consumption for data centers doubled from 2000 and 2006, and it is anticipated to double again by 2011, making these mission-critical facilities the nation's largest commercial user of electric power. With major technology companies investing heavily in new data centers, it's no wonder Building Teams see these mission-critical facilities as a golden opportunity, and why they are working hard to keep energy costs at data centers in check.

| Aug 11, 2010

New data shows low construction prices may soon be coming to an end

New federal data released recently shows sharp increases in the prices of key construction materials like diesel, copper and brass mill shapes likely foreshadow future increases in construction costs, the Associated General Contractors of America said. The new November producer price index (PPI) report from the Bureau of Labor Statistics provide the strongest indication yet that construction prices are heading up, the association noted.

| Aug 11, 2010

Best AEC Firms of 2011/12

Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021