flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Arriscraft thin-clad stone solution provides ASHRAE 90.1 compliance

Sponsored Content Insulation

Arriscraft thin-clad stone solution provides ASHRAE 90.1 compliance

Naturally-made Arriscraft stone offers both the aesthetic and durability qualities needed for the Mountain Point Medical Centre in Lehi, Utah.


By Arriscraft | October 26, 2016

The Building Codes are changing and are now requiring higher performance requirements for the thermal envelope.  The way we once built will be just that, a thing of the past, as the cladding industry evolves.  For a long time the building science field has acknowledged the weaknesses of our current construction means and methods, such as conductive heat loss/gain through large amounts of thermal bridging and this is what has driven the most recent changes to the building codes in North America.  As such, most of these codes have now adopted ASHRAE 90.1 such as the International Building Code (IBC) in the United States or they adopted a set of standards of their own similar to ASHRAE 90.1 like the supplementary conditions contained in the Ontario Building Code (OBC) SB-10 requirements to achieve better thermal performance in the building envelope.  For veneer walls, these updated code requirements now make it mandatory for new construction to reduce thermal bridging and achieve higher effective R-Values (lower U-Values) for the wall assemblies.

 

 

For builders and designers seeking ASHRAE 90.1 compliant veneer wall systems, the Arriscraft ARRIS.clip Gridworx assembly is a great option.

In designing the leading-edge Mountain Point Medical Centre in Lehi, Utah, Earl Swensson Associates needed a modern, high-performance façade. Choosing naturally-made Arriscraft stone offered both the aesthetic and durability qualities needed for the project. The smooth ARRIS.clip selection integrated well into the overall modern design of the facility.

The ARRIS.clip thin stone was installed using the Gridworx aluminum stone hanging system and their Discrete Girt / Z-channel assembly, creating a back drained and ventilated open rainscreen façade and providing a system that provided the higher effective R-value they needed to achieve ASHRAE 90.1 compliance.

 

 

This Arriscraft ARRIS.clip and Gridworx ASHRAE 90.1 compliant assembly meets or exceeds the thermal requirements for climate zones 1 through 8 (which covers all of North America).

 

Project Details:
Project: Mountain Point Medical Centre
Location: Lehi, Utah
Architect: Earl Swensson Associates
Product: CSMU-clip (ARRIS-clip Renaissance®) Units, 12” Smooth – Standard (Sunset)

Tags

Related Stories

| Mar 20, 2014

Common EIFS failures, and how to prevent them

Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems. 

| Mar 4, 2014

How EIFS came to America

Design experts from Hoffmann Architects offer a brief history of exterior insulation and finish systems in the U.S.

| Dec 31, 2013

Top 10 blog posts from 2013

BD+C editors and our contributors posted hundreds of blogs in 2013. Here's a recap of the most popular topics. They include valuable lessons from one of the first BIM-related lawsuits and sage advice from AEC legend Arthur Gensler.  

| Sep 26, 2013

Sheep's wool insulation, bio-brick among Cradle to Cradle product innovation finalists

Ten finalists are competing for $250,000 in prizes from the Cradle to Cradle Products Innovation Institute and Make It Right.  

| Aug 23, 2013

Demand for commissioning services on the rise: PECI/BCA survey

Demand for the services of commissioning professionals is rising and will continue to rise into the near future, according to a survey by PECI and the Building Commissioning Association (BCA).

| Apr 16, 2013

5 projects that profited from insulated metal panels

From an orchid-shaped visitor center to California’s largest public works project, each of these projects benefited from IMP technology.

| Jul 13, 2012

July 2012: Product Solutions

Insulation, ceiling panels, sunshades.

| Jun 28, 2012

Federal applications of renewable energy

U.S. Army Fort Knox: Using the Earth for space heating and cooling. The U.S. Department of Energy’s (DOE) Federal Energy Management Program (FEMP) facilitates the Federal Government’s implementation of sound, cost-effective energy management and investment practices to enhance the nation’s energy security and environmental stewardship.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021