flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Arriscraft thin-clad stone solution provides ASHRAE 90.1 compliance

Sponsored Content Insulation

Arriscraft thin-clad stone solution provides ASHRAE 90.1 compliance

Naturally-made Arriscraft stone offers both the aesthetic and durability qualities needed for the Mountain Point Medical Centre in Lehi, Utah.


By Arriscraft | October 26, 2016

The Building Codes are changing and are now requiring higher performance requirements for the thermal envelope.  The way we once built will be just that, a thing of the past, as the cladding industry evolves.  For a long time the building science field has acknowledged the weaknesses of our current construction means and methods, such as conductive heat loss/gain through large amounts of thermal bridging and this is what has driven the most recent changes to the building codes in North America.  As such, most of these codes have now adopted ASHRAE 90.1 such as the International Building Code (IBC) in the United States or they adopted a set of standards of their own similar to ASHRAE 90.1 like the supplementary conditions contained in the Ontario Building Code (OBC) SB-10 requirements to achieve better thermal performance in the building envelope.  For veneer walls, these updated code requirements now make it mandatory for new construction to reduce thermal bridging and achieve higher effective R-Values (lower U-Values) for the wall assemblies.

 

 

For builders and designers seeking ASHRAE 90.1 compliant veneer wall systems, the Arriscraft ARRIS.clip Gridworx assembly is a great option.

In designing the leading-edge Mountain Point Medical Centre in Lehi, Utah, Earl Swensson Associates needed a modern, high-performance façade. Choosing naturally-made Arriscraft stone offered both the aesthetic and durability qualities needed for the project. The smooth ARRIS.clip selection integrated well into the overall modern design of the facility.

The ARRIS.clip thin stone was installed using the Gridworx aluminum stone hanging system and their Discrete Girt / Z-channel assembly, creating a back drained and ventilated open rainscreen façade and providing a system that provided the higher effective R-value they needed to achieve ASHRAE 90.1 compliance.

 

 

This Arriscraft ARRIS.clip and Gridworx ASHRAE 90.1 compliant assembly meets or exceeds the thermal requirements for climate zones 1 through 8 (which covers all of North America).

 

Project Details:
Project: Mountain Point Medical Centre
Location: Lehi, Utah
Architect: Earl Swensson Associates
Product: CSMU-clip (ARRIS-clip Renaissance®) Units, 12” Smooth – Standard (Sunset)

Tags

Related Stories

| Jun 13, 2017

Accelerate Live! talk: Next-gen materials for the built environment, Blaine Brownell, Transmaterial

Architect and materials guru Blaine Brownell reveals emerging trends and applications that are transforming the technological capacity, environmental performance, and design potential of architecture.

Sponsored | Insulation | Sep 30, 2016

Using spray foam in a continuous insulation application – Prescott High School, Wisconsin

A continuous insulation solution offers a cost-effective and high-performance option for exterior commercial wall construction.

Sponsored | Insulation | Jun 8, 2016

The ideal high-performance insulation for curved wall designs

InsulBloc frees architects, contractors and specifiers from restrictive concerns about innovation and form in their designs. It applied as a liquid, conforms to any design shape, and expands then cures in place.  

Insulation | Mar 1, 2016

Icynene ProSeal closed-cell spray foam insulation awarded UL Greenguard Gold certification

As more Americans are looking for greener, more environmentally conscious products, Icynene’s ProSeal insulation fits the bill

Insulation | Feb 24, 2016

Green Seal seeks stakeholders for new insulation standard

Green Seal seeks stakeholders for new insulation standard.

| Jan 14, 2016

How to succeed with EIFS: exterior insulation and finish systems

This AIA CES Discovery course discusses the six elements of an EIFS wall assembly; common EIFS failures and how to prevent them; and EIFS and sustainability.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021