flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Up, up and away: Dutch hospitality chain completes the world's tallest modular hotel

Building Team Awards

Up, up and away: Dutch hospitality chain completes the world's tallest modular hotel

Honorable mention: At 21 stories (15 of them modular), it is the world’s tallest modular hotel.


By Robert Cassidy, Executive Editor | June 21, 2019

A crew hoists an 8x48-foot module for the hotel, one of 150 such modules that were prefabbed in Poland and shipped to the U.S. Photo: Stephen B. Jacobs Group

DeSimone Consulting Engineers (SE) partnered with Concrete Architectural Associates (architect) and Stephen B. Jacobs Group (AOR) on the 100,000-sf, 300-key citizenM Bowery Hotel in New York’s Bowery neighborhood. This is the second New York hotel for boutique hotelier citizenM, based in Amsterdam, but its first U.S. inn using modular construction. At 21 stories (15 of them modular), it is the world’s tallest modular hotel.

The units were manufactured near Gdansk, Poland, and shipped via container vessel to the U.S. Each floor contains 20 hotel rooms constructed from 8x48-foot modules, with two 165-sf rooms and a central corridor per module. DeSimone’s design team had to fit the 246-foot-tall structure inside a building envelope originally developed for a cast-in-place concrete structure.+


Building Team — Submitting firm DeSimone Consulting Engineers (SE) Owner citizenM Architect Concrete Architectural Associates AOR Steven B. Jacobs Group MEP engineer Stantec General contractor The Rinaldi Group

General information — Cost Confidential Size 100,000 sf Construction time March 2015 to September 2018 Delivery methodDesign-bid-build

 

Return to the Building Team Awards landing page

Related Stories

Building Team Awards | Apr 9, 2015

IPD-driven fusion facility serves science and student life in Chicago

In dire need of modern science labs and a student union, North Park University built both—in the same building.

Building Team Awards | Apr 9, 2015

‘Prudent, not opulent’ sets the tone for this Catholic hospital

This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.

Building Team Awards | Apr 9, 2015

9/11 museum triumphs over controversy

The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.

Building Team Awards | Apr 7, 2015

Unique test facility will help make wind power more feasible

A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.

Building Team Awards | Apr 5, 2015

UK's leading foot and mouth disease lab turns containment design inside out

A daring Building Team breaks the bunker mentality common to research containment with this light-filled, open facility in the English countryside.

Building Team Awards | Apr 5, 2015

‘Project first’ philosophy shows team’s commitment to a true IPD on the San Carlos Center

Skanska and NBBJ join forces with Sutter Health on a medical center project where all three parties share the risk.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021