flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

3D-printed office: Office of the Future

Building Team Awards

3D-printed office: Office of the Future

Dubai kicks off 3D-printing tech initiative with a novel office project.


By David Barista, Editorial Director | June 14, 2017

Photo courtesy Dubai Media Office

Technology pundits have pushed the benefits of 3D printing and additive manufacturing for years, but outside of a few pilot projects, the technology has remained more concept than reality for the AEC industry.   

The Office of the Future in Dubai represents the most audacious project to date. Dedicated in May 2016, the 2,600-sf, fully functioning office building kicked off Dubai’s strategy to make the city a 3D printing hub by 2030.

The global Building Team (Dubai, China, Chicago, and New York) had to produce a code-compliant structure that accommodated key building systems: plumbing, electric, HVAC, and telecommunications. Among the team’s innovations: the design of MEP infrastructure cavities that doubled as reinforcement for the core structure.

The building took only 17 days to print and two days to assemble on the job site. The team says the 3D-printing process reduced labor costs by 80% and construction waste by 60%.

 

Building Team – Submitting firm, MEP engineer Syska Hennessy Group Owner Dubai Future Foundation Architects Gensler, Killa Design Structural engineer Thornton Tomasetti Contractor China State Construction Construction manager Projex

General Information – Size 2,600 sf Construction cost Withheld at owner’s request Construction time February 2016 to May 2016 Delivery method Design-build

 

Return to the 2017 Building Team Awards landing page

Related Stories

Building Team Awards | Nov 2, 2020

Fans come first at Allianz Field

The new home of the Minnesota United soccer club wins a Silver Award in BD+C’s 2020 Building Team Awards. 

Building Team Awards | Oct 24, 2020

Emory University Student Center wins the top award in 2020 Building Team Awards

Emory University Student Center wins the top award in 2020 Building Team Awards

Building Team Awards | Oct 22, 2020

Look up to the skies

The Mori Hosseini Student Union at Embry-Riddle Aeronautical University takes home a Silver Award in the 2020 Building Team Awards.

Building Team Awards | Oct 22, 2020

Judging a book by its cover

The New York Presbyterian David H. Koch Center wins a Silver Award in BD+C’s 2020 Building Team Awards.

Building Team Awards | Oct 21, 2020

Big Room equals big results

Tucson’s Banner University Medical Center is honored with a Gold Award in the 2020 Building Team Awards. 

Building Team Awards | Oct 21, 2020

New York’s STEM epicenter and career gateway

The CUNY New York City College of Technology Academic Building wins a Gold Award in BD+C’s 2020 Building Team Awards. 

Building Team Awards | Oct 20, 2020

Seamless speed to market drives Texas hospital’s growth

Learn why the Methodist Richardson Medical Center Vertical Expansion, in Richardson, Texas, was honored with a Gold Award in the 2020 Building Team Awards.

Building Team Awards | Oct 20, 2020

Winning with teamwork

The new home of the NBA’s Golden State Warriors, Chase Center, is honored with a Gold Award in the 2020 Building Team Awards.

Coronavirus | Oct 8, 2020

The Weekly show: Statue of Liberty Museum, emotional learning in K-12, LA's climate change vulnerability

The October 8 episode of BD+C's "The Weekly" is available for viewing on demand.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021