flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

11 hot BIM/VDC topics for 2013

11 hot BIM/VDC topics for 2013

A roundup of the hottest building information modeling themes on BDCnetwork.com.


By BD+C Staff | October 30, 2013
building exterior
building exterior

If you like to geek out on building information modeling and virtual design and construction, you should enjoy this overview of the top BIM/VDC topics. The following collection of feature stories and case studies is based on the number of BDCnetwork.com readers who clicked on the article in the past 10 months. The topics range from BIM for facilities management applications to modular data centers to augmented reality.  

 

 

1. “BIM Becomes VDC”

By John Tobin, LEED AP, Director of Architecture, EYP Architecture & Engineering

The disruptive growth of BIM has been largely due to the unanticipated interest contractors have taken in the technology. Contractors have grasped the power of BIM with far more vigor than designers. Contractors look at BIM models and immediately understand how they could be used for VDC tasks. www.BDCnetwork.com/vdc

 

 

2. “Augmented reality goes mainstream: 12 applications for design and construction firms”

By David Barista, Editor-in-Chief, BD+C

Thanks to inexpensive mobile devices and increasingly advanced software apps, Building Teams are finally able to bring their BIM models to life on the job site. This article offers a dozen distinct applications for augmented reality and profiles one of the nation’s largest AR implementations: the Oakland Medical Center Replacement. www.BDCnetwork.com/ar

 

 

3. “’My BIM Journey’ – 6 Lessons from a BIM/VDC Expert”

By Jared Krieger, AIA, LEED AP, Project Manager, Gensler

From applying the two-inch rule to simplifying the BIM execution plan, Gensler’s Jared Krieger offers valuable advice for taming BIM/VDC workflows based on his five-year journey with the technology. Krieger discusses how to prepare for virtual coordination meetings, work more effectively with subs on BIM-driven projects, and apply clash detection tools more effectively. www.BDCnetwork.com/mybim

 

 

4. “World’s tallest children’s hospital pushes BIM to the extreme”

By David Barista, BD+C

Learn how the Building Team for the 23-story Lurie Children’s Hospital in Chicago implemented an integrated BIM/VDC/IPD workflow. This report includes an in-depth look at the coordination of the tower’s 10th-floor mechanical space, which, according to the Building Team, could not have been built within the time frame and budget without the use of BIM and VDC. www.BDCnetwork.com/bimhospital

 

 

5. “Level of Development: Will a new standard bring clarity to BIM model detail?”

By Jeffrey Yoders, Contributing Editor, BD+C

This article breaks down the Levels of Development Specification developed by BIMForum. The document will allow Building Teams to specify and articulate with a high level of clarity the content and reliability of BIM models at various stages of development. www.BDCnetwork.com/levels

 

 

6. “BIM 2.0: AEC firms share their vision for the great leap forward in BIM/VDC implementation”

By David Barista, BD+C

For our 2013 Giants 300 Report, BD+C reached out to dozens of AEC firms that made our annual BIM Giants lists and asked one simple question: What does BIM 2.0 look like to you? What they had to offer ranged from augmented reality applications to “smart” job sites to BIM for O&M tasks. www.BDCnetwork.com/bim2.0

 

 

7. “5 tips for running a successful BIM coordination meeting”

By Jared Krieger, AIA, LEED AP, Project Manager, Gensler

BIM tools are great, but if you can’t run efficient, productive coordination meetings, the Building Team will never realize the benefits of true BIM coordination. The author offers helpful tips for making the most of BIM coordination meetings based on his experience working on BIM/VDC-driven projects. www.BDCnetwork.com/5tips

 

 

8. “Hospital project pioneers BIM/VDC-based integrated project delivery”

By Jeffrey Yoders, Contributing Editor, BD+C

Everyone talks about the need to bring together BIM/VDC and integrated project delivery in the design and construction of complex projects, but so far there have been few cases of true integration. Jeffrey Yoders profiles one of these rare projects: the Marlborough Hospital Cancer Pavilion. www.BDCnetwork.com/ipdhospital

 

 

9. “Electronic surveying improves accuracy on BIM-driven hospital project”

By Robert Cassidy, Editorial Director, BD+C

In the rapidly changing world of virtual design and construction, the MEP component of building information modeling has earned a reputation as something of a technology laggard. That negative perception is changing, as MEP engineers find new ways to put BIM to use. www.BDCnetwork.com/surveying

 

 

10. “BIM-driven prototype turns data centers into a kit of parts”

By Ryan Schultz and Timothy Connor, Architects, Sheehan Partners

Considering their predominantly functional and technical nature, data centers are becoming as much a product as they are a building. This article explores a BIM-designed data center prototype that takes advantage of mass customization of assemblies to achieve higher levels of efficiencies. www.BDCnetwork.com/bimdatacenters

 

 

11. “7 ways it pays to use BIM for data centers”

By David Barista, BD+C

Perhaps no other project type stands to benefit more from coordination using BIM and VDC than data centers. This article explores how AEC firms and owners are getting the most bang for the buck when using BIM/VDC on data centers. www.BDCnetwork.com/7ways

 

For more BIM articles, visit: www.BDCnetwork.com/bimit

Related Stories

| Sep 12, 2014

Total immersion: Has virtual reality's time finally come?

The emergence of low-cost VR technology means that anyone with a few hundred bucks and a decent workstation can get in the game. But, as our experts reveal, pulling off VR is not so simple.

| Sep 10, 2014

Must See: Shape-shifting architecture that responds to heat

Students in Barcelona have created a composite material using shape memory polymers that can deform and return to their original state when activated by cues like heat, humidity, and light.

| Sep 9, 2014

Take a look at the hardhat of the future

A Los Angeles-based startup added augmented reality technology to a hardhat, creating a smart helmet.

| Sep 8, 2014

Trimble acquires Gehry Technologies, aims to create tools for linking office and job site

Trimble and Frank Gehry announced that they have entered into a strategic alliance to collaborate to transform the construction industry by further connecting the office to on-site construction technologies. As part of the alliance, Trimble has acquired Gehry Technologies.

Sponsored | | Sep 2, 2014

A smarter way to manage projects

Understanding effective project management helps many big and small organizations to carry out large-scale projects on time, on budget and with lesser commotion.

| Aug 22, 2014

Spireworks app lets users control a piece of the New York skyline

Mark Domino, the son-in-law of developer Douglas Durst, has developed an app, called Spireworks, that allows anyone with a smartphone to change the color of a building's lights.

Sponsored | | Aug 21, 2014

Defining the measure of success when implementing new technologies

Sasha Reed and Chad Dorgan, McCarthy Building Cos.’s Vice President of Quality and Sustainability, discuss the keys to managing innovation within a large construction firm. SPONSORED CONTENT

| Aug 14, 2014

8 do's and don'ts for completing an HVAC life cycle cost assessment

There are many hurdles to overcome when completing a life cycle cost assessment. RMF Engineering’s Seth Spangler offers some words of advice regarding LCCAs.

| Aug 14, 2014

Life cycle cost analysis using energy modeling

A life cycle cost analysis helps a school district decide which HVAC system to use in $198 million worth of future building projects.

Sponsored | | Aug 8, 2014

Setting guidelines for construction PDF documents across the AEC industry

Sasha Reed interviews two members of the coalition responsible for creating new Guidelines for Construction PDF Documents. SPONSORED CONTENT  

boombox1 - default
boombox2 -
native1 -

More In Category

AEC Tech

Lack of organizational readiness is biggest hurdle to artificial intelligence adoption

Managers of companies in the industrial sector, including construction, have bought the hype of artificial intelligence (AI) as a transformative technology, but their organizations are not ready to realize its promise, according to research from IFS, a global cloud enterprise software company. An IFS survey of 1,700 senior decision-makers found that 84% of executives anticipate massive organizational benefits from AI. 




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021