flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Ware Malcomb finds itself in the mix for multiple diverse projects

Architects

Ware Malcomb finds itself in the mix for multiple diverse projects

Its latest completion is an office/factory/warehouse combo for one of Marvin Window’s brands.


By John Caulfield, Senior Editor | January 5, 2021
Lobby of TruStile's new headquarters in Denver

The door manufacturer TruStile is moving into a new headquarters in Denver designed by Ware Malcomb, one of several projects the firm has completed over the past six or seven months. Image: Inside Out Studios

Despite a coronavirus pandemic that has delayed or postponed projects across typologies and markets, the design firm Ware Malcomb has managed to buck that trend with design work for new buildings and spaces that serve some of the country’s hardest-hit sectors, like retail and offices, as well as some, like industrial, that have prospered during the health crisis.

Since last spring, Ware Malcomb’s completed projects have included:

•In December, the relocation of Key Food Stores Co-op’s corporate offices from Staten Island, N.Y., to 38,000 sf of Class A office space in Old Bridge, N.J. The new digs, on two floors, includes a reception area, conference rooms, a fitness center, and wellness room. The space also features an executive suite, and a test kitchen. Aside from providing interior architecture and design services, Ware Malcomb’s in-house branding studio designed environmental graphics into the workspace and amenity areas.  Unity Construction Services was the project’s GC; CBRE was its broker and project manager.

•New office space for Airspace Technologies, the air transport shipping firm, located within the two-building, 235,000-sf Atlas at Carlsbad (Calif.) campus that Ware Malcomb helped to transform in 2017. Airspace Technologies is leasing 23,000 sf that are divided into three department “neighborhoods”: Design, Engineering, and Administrative. A centrally located reception, boardroom, and break area serves as a hub for employees. Ware Malcomb provided interior architecture and design services for this project, which was completed in October. The GC was Good & Roberts; the CM Hughes Marino; and the furniture supplier Cultura.

•Last summer, the 7,500-sf Vallejo First 5 Center opened as a learning and play space for children five years old or younger from low-income families. The space, inside the Vallejo (Calif.) Shopping Mall, has as its focal point a large indoor playground featuring a fantasy theme of bugs and the outdoors. Ware Malcomb provided the interior design architecture and design services, and Underwood Construction was the GC.

Entrance of Pulp Riot's office space

L'Oreal's Pulp Riot brand is now working out of new office space in Encino, Calif. Image: Haley Hill Photography

Workspace in Pulp Riot's new office

•New offices in Encino, Calif., that Ware Malcomb designed for L’Oreal’s Pulp Riot hair coloring product line. The 6,600-sf space encompasses a hair demo salon, conference rooms, open and flex offices, and a photo studio. It also serves as a training facility for stylists who come from around the country. The GC on this project, completed in July, was Pinnacle.

•Loloi Rugs’ newest facility, which opened in Atlanta last May, is a build-to-suit 646,380-sf building that incorporates a distribution center, warehouse, office space, and product showroom. Ware Malcomb designed 10,000 sf of interior office space and the 5,000-sf showroom. The offices, located on the periphery of the floorplate, have large windows and glass walls to maximize natural light exposure for the space. Ware Malcomb’s GC partner was Alston Construction.

Ware Malcomb designed the interior space and showroom for Loloi Rugs' new warehouse in Atlanta. Image: Johnny McLendon Photography

 

BIO-MASS BOILER A FIRST FOR ITS MARKET

Yesterday, Ware Malcomb announced the completion of the new Denver headquarters for TruStile, an industry leader in interior doors whose parent company is Marvin Windows & Doors. The headquarters includes 50,000 sf of office space and 260,000 sf of manufacturing/production space with a large outdoor amenity deck.

Bringing natural light into the building was an important design feature for TruStile's new headquarters. Image: Inside Out Studios

 

Ware Malcomb provided architecture, interior design, and engineering services for this project, which was built by Ryan Companies. The design team, at TruStile’s behest, ensured the layout of the open office and amenity areas were located near windows as much as possible. The production area is also visible from the building’s training room and various points in the office.

TruStile—which had been operating out of four buildings in Denver—has combined its operations into a single structure whose environmental features include a two-story mechanical building at its northern flank housing a bio-mass boiler that converts sawdust produced by the factory into energy for heating and cooling.

This site was constrained by its proximity to a 100-year floodplain. It required a development permit and a letter of map amendment and letter of map revision based on fill, known as a LOMR-F, whose issuance eliminates the federal flood insurance purchase requirement as a condition of federal or federally backed financing. This project also required a large underground detention system that was the first of its kind in Colorado.

ECOMMERCE IS DRIVING NEW PROJECTS

640 Columbia, a new distribution center in Brooklyn, N.Y.

640 Columbia in Brooklyn, N.Y., will provide “last mile”  distribution logistics for ecommerce. Image credit: Neoscape

 

Among the projects that Ware Malcomb currently has under construction is a multistory distribution center, known as 640 Columbia, which the firm developed in collaboration with DH Property Holdings and the GC firm Suffolk Construction.

Located on 4.5 acres in Brooklyn, N.Y., the 370,000-sf facility—which follows an industrial design prototype that Ware Malcomb came up with in 2017 for land-constrained sites—will provide so-called “last mile” logistics for the delivery of online purchases. The facility will include a warehouse, office space, two levels of truck docks, a mezzanine with parking, and dedicated elevator service on the third floor. An attached 77,853-sf parking structure will accommodate up to 184 vehicles for employees.

Since 2017, Ware Malcomb has designed approximately 20 million sf of industrial distribution projects in North America. The Brooklyn facility is scheduled for completion in the fourth quarter of 2021. Its building team includes SMBH Structural Engineering (SE), WB Engineers and Consultants (MEP/FP), and Bohler Engineering (CE).

Related Stories

Giants 400 | Jan 23, 2024

Top 110 Medical Office Building Architecture Firms for 2023

SmithGroup, CannonDesign, E4H Environments for Health Architecture, and Perkins Eastman top BD+C's ranking of the nation's largest medical office building architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report.

Giants 400 | Jan 22, 2024

Top 100 Outpatient Facility Architecture Firms for 2023

HDR, CannonDesign, Stantec, Perkins&Will, and ZGF top BD+C's ranking of the nation's largest outpatient facility architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes design revenue for work related to outpatient medical buildings, including cancer centers, heart centers, urgent care facilities, and other medical centers.

Construction Costs | Jan 22, 2024

Construction material prices continue to normalize despite ongoing challenges

Gordian’s most recent Quarterly Construction Cost Insights Report for Q4 2023 describes an industry still attempting to recover from the impact of COVID. This was complicated by inflation, weather, and geopolitical factors that resulted in widespread pricing adjustments throughout the construction materials industries.

Transit Facilities | Jan 22, 2024

Top 40 Transit Facility Architecture Firms for 2023

Perkins&Will, HDR, Gensler, Skidmore, Owings & Merrill, and HNTB top BD+C's ranking of the nation's largest transit facility architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes design revenue for work related to bus terminals, rail terminals, and transit stations.

Hotel Facilities | Jan 22, 2024

U.S. hotel construction is booming, with a record-high 5,964 projects in the pipeline

The hotel construction pipeline hit record project counts at Q4, with the addition of 260 projects and 21,287 rooms over last quarter, according to Lodging Econometrics.

Modular Building | Jan 19, 2024

Virginia is first state to adopt ICC/MBI offsite construction standards

Virginia recently became the first state to adopt International Code Council/Modular Building Institute off-site construction standards.

Office Buildings | Jan 19, 2024

How to strengthen office design as employees return to work

Adam James, AIA, Senior Architect, Design Collaborative, shares office design tips for the increasingly dynamic workplace.

Modular Building | Jan 19, 2024

Building with shipping containers not as eco-friendly as it seems

With millions of shipping containers lying empty at ports around the world, it may seem like repurposing them to construct buildings would be a clear environmental winner. The reality of building with shipping containers is complicated, though, and in many cases isn’t a net-positive for the environment, critics charge, according to a report by NPR's Chloe Veltman.

Adaptive Reuse | Jan 18, 2024

Coca-Cola packaging warehouse transformed into mixed-use complex

The 250,000-sf structure is located along a now defunct railroad line that forms the footprint for the city’s multi-phase Beltline pedestrian/bike path that will eventually loop around the city.

Sponsored | BD+C University Course | Jan 17, 2024

Waterproofing deep foundations for new construction

This continuing education course, by Walter P Moore's Amos Chan, P.E., BECxP, CxA+BE, covers design considerations for below-grade waterproofing for new construction, the types of below-grade systems available, and specific concerns associated with waterproofing deep foundations.

boombox1 - default
boombox2 -
native1 -

More In Category

Mass Timber

Mass timber a big part of Western Washington University’s net-zero ambitions

Western Washington University, in Bellingham, Wash., 90 miles from Seattle, is in the process of expanding its ABET-accredited programs for electrical engineering, computer engineering and science, and energy science. As part of that process, the university is building Kaiser Borsari Hall, the 54,000-sf new home for those academic disciplines that will include teaching labs, research labs, classrooms, collaborative spaces, and administrative offices.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021