For a job with a maximum guaranteed price, crews working on a large expansion at Aims Community College in Greeley, Colorado, were looking for the best ways to cut costs when things went over budget. Putting additional Viega products to use was an easy way to trim costs.
Golden Triangle Construction, along with contractor Braconier Mechanical and Plumbing, remodeled the existing 15,000-square-foot welding building at the college, plus added on another three-story building, 60,000 feet in size. Original specs called for threading the pipe, and Project Manager Todd Self saw that as an opening for Viega MegaPress.
“When it was over budget, I looked at what we could substitute. Originally the only [Viega product] called for was for potable water, but we got other Viega items in. It was value engineering with the budget,” Self said.
Ricky Maynard, the plumbing foreman on the job, echoed that Viega was the best way to go for both ProPress and MegaPress.
“It’s faster because no hot work permits are needed. And running the water pipe in a three-story building, we would have needed two or three times as long to do it,” he said. “I’ve been pressing since I came to Braconier six years ago, and if the specs allow it, [Viega] is what we do.”
Braconier used additional Viega products to cut costs.
Time saved adds up, and it was crucial to the budget. Maynard also added that original plans in the building called for threading oxygen pipe, which wouldn’t have worked. Lines can’t be used for oxygen if they've had threading oil on them - yet another reason to call on Viega.
“Viega evens the playing field for us,” Self said. “We can drop our labor costs and be more competitive. Labor savings are huge, so we do what we can to decrease them. When I started four and a half years ago, I always pushed for ProPress and the labor savings it brings. The prep time to press versus weld a joint is so much less.”
There was not a single failure on any Viega fitting, a testament to the strength of the system. ProPress lines run throughout the newly revamped building for hot and cold domestic water. In the remodeled welding lab, MegaPress and MegaPressG lines run a variety of things, including natural gas, compressed air and welding gases, such as argon and acetylene.
The original welding lab, built in 1983, was gutted to a shell with just the welding booths remaining. All the piping – nearly 5,000 feet of it – was newly run, and Joe Turecek, Superintendent with Golden Triangle Construction, said he believes pressing with Viega cut at least a week off the install time in the lab alone.
The addition to the building is a huge boost for the Aims campus and, with all the offerings available, will bring in lots of new students.
Read more here.
Related Stories
Sponsored | | Oct 13, 2014
Liberty Utilities protects installers with Viega MegaPress
Liberty Utilities of New Hampshire wanted a way to keep its installers safe without compromising the quality of their installations, which is why the utility provider decided to start installing Viega MegaPress. SPONSORED CONTENT
Sponsored | | Sep 13, 2014
Right Way Plumbing finishes first at Max Planck Florida Institute
The Max Planck Florida Institute consists of a three-story, 100,000-sf scientific research facility with 30,000 feet of copper joined with Viega ProPress fittings.
Sponsored | | Jun 22, 2014
JW Marriott Indianapolis redefines city’s skyline
The 34-story JW Marriott is both the largest and tallest hotel in Indianapolis. One of the most prestigious hotels in the city, the JW Marriott has hosted celebrities and NFL teams alike.
| May 1, 2014
Tight on space for multifamily? Check out this modular kitchen tower
The Clei Ecooking kitchen, recently rolled out at Milan's Salone de Mobile furniture fair, squeezes multiple appliances into a tiny footprint.
| Feb 27, 2014
Transition Fittings from Viega Make Press Connections Between Copper and PEX Systems
Viega offers the only press fitting to transition from copper to PEX tubing, eliminating the need for solder or threaded adapters.
| Jan 8, 2014
United Association, NRDC seek major plumbing code changes
Proposed changes include mandating the insulation of hot water piping in new buildings.
| Nov 25, 2013
Building Teams need to help owners avoid 'operational stray'
"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.
| Oct 27, 2013
Uponorpro.com now features LiveChat online technical support for professionals
Free service provides professionals in the PEX plumbing, fire sprinkler, and radiant heating and cooling industries access to Uponor Technical and Design Services online for support.
| Sep 27, 2013
ASHRAE/IES publish first standard focused on commissioning process
ANSI/ASHRAE/IES Standard 202, Commissioning Process for Buildings and Systems, identifies the minimum acceptable commissioning process for buildings and systems as described in ASHRAE’s Guideline 0-2005, The Commissioning Process. Standard 202 is ASHRAE’s first standard focused on the commissioning process.
| May 9, 2013
10 high-efficiency plumbing fixtures
From a "no sweat" toilet to a deep-well lavatory, here's a round up of the latest high-efficiency plumbing fixtures.