For a job with a maximum guaranteed price, crews working on a large expansion at Aims Community College in Greeley, Colorado, were looking for the best ways to cut costs when things went over budget. Putting additional Viega products to use was an easy way to trim costs.
Golden Triangle Construction, along with contractor Braconier Mechanical and Plumbing, remodeled the existing 15,000-square-foot welding building at the college, plus added on another three-story building, 60,000 feet in size. Original specs called for threading the pipe, and Project Manager Todd Self saw that as an opening for Viega MegaPress.
“When it was over budget, I looked at what we could substitute. Originally the only [Viega product] called for was for potable water, but we got other Viega items in. It was value engineering with the budget,” Self said.
Ricky Maynard, the plumbing foreman on the job, echoed that Viega was the best way to go for both ProPress and MegaPress.
“It’s faster because no hot work permits are needed. And running the water pipe in a three-story building, we would have needed two or three times as long to do it,” he said. “I’ve been pressing since I came to Braconier six years ago, and if the specs allow it, [Viega] is what we do.”
Braconier used additional Viega products to cut costs.
Time saved adds up, and it was crucial to the budget. Maynard also added that original plans in the building called for threading oxygen pipe, which wouldn’t have worked. Lines can’t be used for oxygen if they've had threading oil on them - yet another reason to call on Viega.
“Viega evens the playing field for us,” Self said. “We can drop our labor costs and be more competitive. Labor savings are huge, so we do what we can to decrease them. When I started four and a half years ago, I always pushed for ProPress and the labor savings it brings. The prep time to press versus weld a joint is so much less.”
There was not a single failure on any Viega fitting, a testament to the strength of the system. ProPress lines run throughout the newly revamped building for hot and cold domestic water. In the remodeled welding lab, MegaPress and MegaPressG lines run a variety of things, including natural gas, compressed air and welding gases, such as argon and acetylene.
The original welding lab, built in 1983, was gutted to a shell with just the welding booths remaining. All the piping – nearly 5,000 feet of it – was newly run, and Joe Turecek, Superintendent with Golden Triangle Construction, said he believes pressing with Viega cut at least a week off the install time in the lab alone.
The addition to the building is a huge boost for the Aims campus and, with all the offerings available, will bring in lots of new students.
Read more here.
Related Stories
Sponsored | Plumbing | Nov 13, 2015
Getting the Most Value When You Value Engineer DWV Systems
There are lots of places in a DWV system where value can be captured, but there are applications where what looks like value can mask risks that you might not want to take.
Sponsored | Plumbing | Oct 9, 2015
Porsche luxury meets Viega innovations
Occupants of the Porsche Design Tower on the shoreline of Florida’s Sunny Isles Beach will experience the best view in the city
Sponsored | Plumbing | Aug 18, 2015
Make sure the money you save in VE isn't destroyed in a lawsuit
Getting the PVC vs. Cast Iron choice right
Sponsored | Plumbing | Mar 13, 2015
Viega ProPress for stainless looks good at UNH
One of the oldest buildings on the University of New Hampshire (UNH) campus, Huddleston Hall is a multipurpose facility, which includes dormitories, classrooms and an event center.
Building Materials | Feb 19, 2015
Prices for construction materials fall in January, following plummet of oil prices
The decline in oil and petroleum prices finally showed up in the produce price index data, according to ABC Chief Economist Anirban Basu.
| Dec 8, 2014
The global sanitation crisis leads to 2.5 million deaths every year
When we see the incredible technology being produced by global plumbing manufacturers, it’s hard to conceive why no viable technical solution to the global sanitation issue has come forth, writes BD+C's Robert Cassidy.