flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

USGBC updates LEED v4 to better address greenhouse gas emissions and climate change

Green

USGBC updates LEED v4 to better address greenhouse gas emissions and climate change

The new version elevates requirements for energy performance closer to those of LEED v4.1.


By Peter Fabris, Contributing Editor | November 13, 2022
USGBC updates LEED v4 to better address greenhouse gas emissions and climate change
Photo courtesy USGBC

The U.S. Green Building Council (USGBC) will update the LEED v4 green building certification program to “more directly address greenhouse gas emissions and climate change” according to the USGBC.

The update raises thresholds in LEED v4 to encourage greater energy performance and emissions reductions. It will be more closely aligned with the rigor of LEED v4.1, which increased energy performance requirements when it was released in 2018, USGBC says.

“The new updates to LEED v4 reaffirm that reducing climate change-related emissions is core to LEED,” said Peter Templeton, president and CEO, USGBC. “These updates ensure LEED continues to drive market leadership in addressing energy use and climate change across the built environment.”

LEED v4 initially focused on reducing energy demand through usage and efficiency. Meanwhile, LEED v4.1 introduced energy metrics on cost and greenhouse gas emissions—a first for LEED.

USGBC will post the updated LEED v4 requirements for public comment this month. Final updates would be presented to the USGBC membership for ballot approval and would go into effect for projects registered after the published effective date of the changes.

The next version of the LEED rating system will enter the development phase in January 2023.

Related Stories

| Jun 7, 2012

Stantec publishes 2011 corporate Sustainability Report

Stantec's fifth annual Sustainability Report was prepared in accordance with the internationally recognized G3.1 Sustainability Reporting Guidelines, developed by the Global Reporting Initiative.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 31, 2012

2011 Reconstruction Award Profile: Seegers Student Union at Muhlenberg College

Seegers Student Union at Muhlenberg College has been reconstructed to serve as the core of social life on campus.

| May 30, 2012

Boral Bricks announces winners of “Live.Work.Learn” student architecture contest

Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 29, 2012

Legrand achieves over 20% energy-intensity reduction in Presidential Challenge

West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 23, 2012

Arizona Army National Guard Readiness Center awarded LEED Silver

LEED certification of the AZ ARNG Readiness Center was based on a number of green design and construction features SAIC implemented that positively impacted the project and the broader community.

| May 23, 2012

Summit Design+Build selected as GC for Chicago restaurant

Little Goat will truly be a multifunctional space.  Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.

| May 21, 2012

Wayne, Pa.'s Radnor Middle School wins national green award

Radnor Middle School among the most sustainable schools in the U.S.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021