flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

U.S. Holocaust Memorial Museum breaks ground on Collections and Conservation Center

Museums

U.S. Holocaust Memorial Museum breaks ground on Collections and Conservation Center

Designed by SmithGroupJJR, the David and Fela Shapell Family Collections and Conservation Center will provide long-term, secure preservation for evidence of the Holocaust.


By SmithGroupJJR | November 10, 2015
U.S. Holocaust Memorial Museum breaks ground on Collections and Conservation Center

The David and Fela Shapell Family Collections and Conservation Center will open in early 2017. Rendering courtesy SmithGroupJJR

The United States Holocaust Memorial Museum’s new David and Fela Shapell Family Collections and Conservation Center has broken ground at an undisclosed location. The 100,000-sf building is designed by SmithGroupJJR.

The new Shapell Center will provide the archival-quality environments to support the preservation of artifacts documenting the Holocaust, ensuring that the evidence of the genocide will not be lost to future generations. With planned expansion space, the Shapell Center will provide a home for the growing collection.

The facility is designed to balance collections and non-collections. The building is organized in two halves: a “clean” side accommodates collections-related activities that includes a reading room; artifact storage; conservations labs for the treatment objects, textiles, paper and photographs; and a collections processing suite with a photo studio for digitizing the collection. A “dirty” side provides standard conditioning for non-collections storage; isolated wood, metal and paint shops for exhibit design and production; and staff office space.

Construction of the Shapell Center is expected to be completed in early 2017. SmithGroupJJR’s design services include architecture, MEP engineering, lighting design, landscape architecture and interior design. SmithGroupJJR leads the broader design team which includes Weidlinger Associates, Inc., The Sextant Group, Inc. and Rummel Klepper & Kahl. DPR Construction is serving as the construction manager.

Tags

Related Stories

Museums | Jul 20, 2021

ANOHA — The Children’s World of the Jewish Museum Berlin opens

Olson Kundig designed the project.

Museums | Jul 12, 2021

The world’s largest astronomy museum completes in Shanghai

Ennead Architects designed the project.

Museums | Jul 1, 2021

New-York Historical Society Museum & Library expands Central Park West location

Robert A.M. Stern Architects designed the project.

Resiliency | Jun 24, 2021

Oceanographer John Englander talks resiliency and buildings [new on HorizonTV]

New on HorizonTV, oceanographer John Englander discusses his latest book, which warns that, regardless of resilience efforts, sea levels will rise by meters in the coming decades. Adaptation, he says, is the key to future building design and construction.

Museums | Jun 22, 2021

Cleveland’s Natural History museum to break ground on new Exhibit Hall

The added space will organize its artifacts and specimens to show humanity’s connection to science, the planet, and the universe.

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

Wood | May 14, 2021

What's next for mass timber design?

An architect who has worked on some of the nation's largest and most significant mass timber construction projects shares his thoughts on the latest design trends and innovations in mass timber.

Museums | Apr 27, 2021

GWWO Architects unveils design of the new Niagara Falls Visitor Center

The project will replace the current outdated and cramped facility.

boombox1 - default
boombox2 -
native1 -

More In Category

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.




Museums

Nebraska’s Joslyn Art Museum to reopen this summer with new Snøhetta-designed pavilion

In Omaha, Neb., the Joslyn Art Museum, which displays art from ancient times to the present, has announced it will reopen on September 10, following the completion of its new 42,000-sf Rhonda & Howard Hawks Pavilion. Designed in collaboration with Snøhetta and Alley Poyner Macchietto Architecture, the Hawks Pavilion is part of a museum overhaul that will expand the gallery space by more than 40%.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021