flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

U.S. Holocaust Memorial Museum breaks ground on Collections and Conservation Center

Museums

U.S. Holocaust Memorial Museum breaks ground on Collections and Conservation Center

Designed by SmithGroupJJR, the David and Fela Shapell Family Collections and Conservation Center will provide long-term, secure preservation for evidence of the Holocaust.


By SmithGroupJJR | November 10, 2015
U.S. Holocaust Memorial Museum breaks ground on Collections and Conservation Center

The David and Fela Shapell Family Collections and Conservation Center will open in early 2017. Rendering courtesy SmithGroupJJR

The United States Holocaust Memorial Museum’s new David and Fela Shapell Family Collections and Conservation Center has broken ground at an undisclosed location. The 100,000-sf building is designed by SmithGroupJJR.

The new Shapell Center will provide the archival-quality environments to support the preservation of artifacts documenting the Holocaust, ensuring that the evidence of the genocide will not be lost to future generations. With planned expansion space, the Shapell Center will provide a home for the growing collection.

The facility is designed to balance collections and non-collections. The building is organized in two halves: a “clean” side accommodates collections-related activities that includes a reading room; artifact storage; conservations labs for the treatment objects, textiles, paper and photographs; and a collections processing suite with a photo studio for digitizing the collection. A “dirty” side provides standard conditioning for non-collections storage; isolated wood, metal and paint shops for exhibit design and production; and staff office space.

Construction of the Shapell Center is expected to be completed in early 2017. SmithGroupJJR’s design services include architecture, MEP engineering, lighting design, landscape architecture and interior design. SmithGroupJJR leads the broader design team which includes Weidlinger Associates, Inc., The Sextant Group, Inc. and Rummel Klepper & Kahl. DPR Construction is serving as the construction manager.

Tags

Related Stories

Projects | Mar 2, 2022

Construction nears completion on $1B Grand Egyptian Museum in Cairo

At an estimated budget of $1 billion, the Grand Egyptian Museum (GEM) is considered the largest museum in the world dedicated to one civilization. The superlatives don’t end there: It’s also the largest museum in Egypt, the largest Pharaonic museum in the world, and one of the world’s leading scientific, historical, and archeological study centers. 

Museums | Feb 25, 2022

Virginia Museum of History and Culture set to reopen after 18-month renovation

Expanded exhibits present new learning approaches.

University Buildings | Feb 18, 2022

On-campus performing arts centers and museums can be talent magnets for universities

Cultural facilities are changing the way prospective students and parents view higher education campuses.

Museums | Jan 25, 2022

Cooper Robertson selected to design master plan for Munson-Williams-Proctor Arts Institute

The project will seek public input regarding the campus master plan.

Museums | Jan 14, 2022

The Shedd Aquarium unveils its $500 million vision for the future

The project will prepare the aquarium for the next 100 years.

Museums | Dec 20, 2021

Marvel selected for $21 million renovation of the Bronx Museum of Arts’ Grand Concourse Entrance

The museum is one of NYC’s only major museums with free admission.

Museums | Dec 7, 2021

The Palo Alto Junior Museum and Zoo completes

CAW Architects designed the project.

Giants 400 | Nov 19, 2021

2021 Cultural Facilities Giants: Top architecture, engineering, and construction firms in the U.S. cultural facilities sector

Gensler, AECOM, Buro Happold, and Arup top BD+C's rankings of the nation's largest cultural facilities sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.

Museums | Nov 10, 2021

Tampa Museum of Art announces $65 million expansion

Weiss/Manfredi is designing the expansion and the renovation of the existing museum building.

Museums | Oct 29, 2021

Rowan University’s new fossil museum sits within an active dinosaur fossil dig

   Ennead Architects (Design Architect) together with KSS Architects (Architect of Record) are designing the project.

boombox1 - default
boombox2 -
native1 -

More In Category

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.




Museums

Nebraska’s Joslyn Art Museum to reopen this summer with new Snøhetta-designed pavilion

In Omaha, Neb., the Joslyn Art Museum, which displays art from ancient times to the present, has announced it will reopen on September 10, following the completion of its new 42,000-sf Rhonda & Howard Hawks Pavilion. Designed in collaboration with Snøhetta and Alley Poyner Macchietto Architecture, the Hawks Pavilion is part of a museum overhaul that will expand the gallery space by more than 40%.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021