Thornton Tomasetti recently announces that the Level 2 Renovation at Tufts University's School of Dental Medicine has received LEED Gold Certification. Fore Solutions, the green building consulting company acquired by Thornton Tomasetti in 2012, provided LEED consulting services for the project at the university’s Boston, Mass., campus.
Fore Solutions was hired by the project architect, ARC/Architectural Resources Cambridge, to provide LEED consulting. In this role, Fore Solutions reviewed the energy model; tracked compliance with LEED throughout design and construction; and reviewed and submitted LEED documentation to the Green Building Certification Institute.
The Tufts School of Dental Medicine developed a multi-year, multi-phase master plan to promote sustainability and positive environmental initiatives. Phase 1 of the project included a five-story, 95,000-sf vertical expansion to the existing building. This allowed for the expansion of patient clinics, classrooms and offices, as well as continuing education and research facilities.
The second installment in the master project was the Level 2 Renovation, initiated to house part of the pre-doctoral teaching program along with an emergency clinic. The second floor has been redesigned within the existing building to accommodate clinic and patient functions in the east wing, and academic offices in the west. The Level 2 Renovation was designed to meet sustainability goals in several categories. +
Related Stories
| Mar 16, 2012
Work on Oxnard, Calif. shopping center resumes after a three-year hiatus
Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall.
| Mar 16, 2012
Stego embarks on HPD Pilot Program
Vapor barrier manufacturer strives to provide better green choices to designers and builders.
| Mar 16, 2012
Marvin Windows and Doors accepting entries for fourth-annual myMarvin Architect’s Challenge
Architects in U.S. and abroad offered the chance to showcase their very best work.
| Mar 14, 2012
Hearing to decide fate of unfinished Harmon in Las Vegas under way
The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.
| Mar 14, 2012
Firestone names 2012 Master Contractor Award Winners
Annual award acknowledges industry’s top roofing professionals.
| Mar 14, 2012
Plans for San Francisco's tallest building revamped
The glassy white high-rise would be 60 stories and 1,070 feet tall with an entrance at First and Mission streets.
| Mar 14, 2012
Hyatt joins Thornton Tomasetti as VP in Chicago
A forensic specialist, Hyatt has more than 10 years of experience performing investigations of structural failures throughout the U.S.
| Mar 14, 2012
Tsoi/Kobus and Centerbrook to design Jackson Laboratory facility in Farmington, Conn.
Building will house research into personalized, gene-based cancer screening and treatment.
| Mar 13, 2012
China's high-speed building boom
A 30-story hotel in Changsha went up in two weeks. Some question the safety in that, but the builder defends its methods.
| Mar 13, 2012
Commercial glazer Harmon expanding into Texas
Company expanding into the Texas market with a new office in Dallas and a satellite facility in Austin.