flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Stantec agrees to acquire VOA Associates

Architects

Stantec agrees to acquire VOA Associates

This deal reflects an industry where consolidation is a strategic necessity for more firms.


By John Caulfield, Senior Editor | February 11, 2016

One of VOA Associates' strengths is the cultural and entertainment sector, and its recent work includes the renovation and expansion of the Museum of Arts and Sciences in Daytona, Fla., pictured above. Merging its operations with Stantec brings together companies with “a commitment to design,” says VOA's Chairman Mike Toolis. Image: VOA Associates

Stantec, one of the industry’s largest architecture/engineering firms, has signed a letter of intent to acquire Chicago-based VOA Associates, a top-10 architectural firm with eight offices and 280 employees in the U.S., Brazil, and China.

Based in Edmonton, Alberta, Stantec operates from over 250 offices worldwide. Its 15,000 employees include 3,800 who work in its building design practice, which the acquisition of VOA is expected to bolster.

“VOA strengthens our collective ability to grow our building practice in U.S. markets,” said Bob Gomes, PE, Stantec’s President and CEO. “Their talented staff has produced an impressive portfolio of workplace, healing, leisure, learning, civic, and entertainment venues.”

Stantec is acquiring VOA’s stock, but it did not disclose the terms of the agreement. If the parties complete this deal in late March, as planned, it would be Stantec’s 13th acquisition since January 2014. Recent transactions include its July 2015 purchase of certain assets and liabilities of VI Engineering, a 30-person firm, and the August 2015 acquisition of Irvine, Calif.-based, 60-person VA Consulting, a community development, transportation, and water-engineering firm.

In its financial report for the quarter ended September 30, 2015, Stantec reiterated its goal to be a top-10 global design firm, and to grow its business at a compound average rate of 15% per year. Through the first nine months of 2015, Stantec’s gross revenue increased by 15.1% to 2.167 billion Canadian dollars (US$1.55 billion), and its net income rose by 3.7% to C$131.1 million.

“Joining Stantec expands horizons and opportunities for our staff and clients,” says Michael Toolis, AIA, LEED AP, VOA’s Chairman and CEO. “Both firms share a commitment to design, a global growth strategy, and market diversity.”

Stanis Smith, SVP with Stantec, tells BD+C that VOA’s leadership “will absolutely” stay on post merger. Stantec’s operations are divided into four groups, and VOA will be folded into its Buildings Group, whose management structure will be altered to accommodate this integration.  

Smith says the two firms had been discussing this merger for several months. “What we saw is a complimentary fit, with no redundancies. It’s a marriage that make sense in both directions.” Smith adds that during those talks, Stantec and VOA officials identified a number of project opportunities that they could pursue jointly.

Smith says Stantec looks at acquisitions “as a way of getting better, not just bigger. Growth is not the design, but the outcome. You wouldn’t believe the number of inquiries we get, but we’re very selective in our acquisitions, where we’re looking for complimentary skills, geographies, or both.”

Toolis tells BD+C that VOA had considered private equity and international AEC firms as possible suitors. By choosing to join forces with Stantec, VOA “is ready to take another step” by “gaining access to [Stantec’s] size, portfolio, and talent.”

Toolis notes, too, that by acquiring VOA, Stantec will be doubling the size of its New York office, and significantly increasing its presence in Chicago, where VOA employs 140 people and Stantec 50. VOA is active in Orlando, where Stantec didn’t have an office, and is big in the entertainment and defense sectors, which hadn’t been as prominent for Stantec.

“We filled some gaps, and they strengthened our bench,” says Toolis.

The Stantec-VOA agreement comes at a time when consolidation (or rumblings about potential deals) within the AEC industry appears to be gaining momentum. Earlier this month, for example, London-based GB Fitzsimon, a cost and project consultant, announced it would merge with Cumming, a Los Angeles-based international project management and construction services firm.

A survey conducted last year by Zweig Group found that 42% of the architecture and planning firms polled were considering acquisitions, compared to 30% in 2012; and that 68% of the firms polled include a merger or acquisition in their strategic plans for the next five years.

VOA has been in business 46 years and is currently a decent-sized company—it generated more than $70 million in architecture revenue in 2014. But Toolis says his firm acknowledged that size matters at this moment in its history.

“Before the Internet, we depended primarily on our relationships," says Toolis. "But now that we’re at a certain level, we’re spending more on our website and social media, which gets expensive. And gets harder and harder to compete.”

Toolis says that on practically every job it bids, VOA goes against the largest firms in the world. Becoming part of Stantec “gives us a lot more firepower.” And while the VOA brand will disappear, Toolis says his company’s relationships with clients “don’t necessarily depend on our name.”

Related Stories

| Aug 11, 2010

GBCI launches credentialing maintenance program for current LEED APs

The Green Building Certification Institute (GBCI) launched a credentialing maintenance program (CMP) for LEED APs and Green Associates, ensuring that LEED professional credentials will remain relevant and meaningful in a rapidly evolving marketplace.

| Aug 11, 2010

Construction employment shrinks in 319 of the nation's 336 largest metro areas in July, continuing months-long slide

Construction workers in communities across the country continued to suffer extreme job losses this July according to a new analysis of metropolitan area employment data from the Bureau of Labor Statistics released today by the Associated General Contractors of America. That analysis found construction employment declined in 319 of the nation’s largest communities while only 11 areas saw increases and six saw no change in construction employment between July 2008 and July 2009.

| Aug 11, 2010

Green consultant guarantees LEED certification or your money back

With cities mandating LEED (Leadership in Energy and Environmental Design) certification for public, and even private, buildings in growing numbers, an Atlanta-based sustainability consulting firm is hoping to ease anxieties over meeting those goals with the industry’s first Green Guaranteed.

| Aug 11, 2010

Architecture Billings Index bounces back after substantial dip

Exhibiting a welcome rebound following a 5-point dip the month prior, the Architecture Billings Index (ABI) was up almost 6 points in July. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. The American Institute of Architects (AIA) reported the July ABI rating was 43.1, up noticeably from 37.7 the previous month.

| Aug 11, 2010

Rafael Vinoly-designed East Wing opens at Cleveland Museum of Art

Rafael Vinoly Architects has designed the new East Wing at the Cleveland Museum of Art (CMA), Ohio, which opened to the public on June 27, 2009. Its completion marks the opening of the first of three planned wings.

| Aug 11, 2010

National Association of Governors adopts AIA policy of reaching carbon neutrality in buildings by 2030

As part of their comprehensive national Energy Conservation and Improved Energy Efficiency policy, the National Association of Governors (NGA) has adopted the promotion of carbon neutral new and renovated buildings by 2030 as outlined by the American Institute of Architects (AIA).

| Aug 11, 2010

Installation work begins on Minnesota's largest green roof

Installation of the 2.5 acre green roof vegetation on the City-owned Target Center begins today. Over the course of two days a 165 ton crane will hoist five truckloads of plant material, which includes 900 rolls of pre-grown vegetated mats of sedum and native plants for installation on top of the arena's main roof.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021