flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Shenzhen projects halted as Chinese officials find substandard concrete

Shenzhen projects halted as Chinese officials find substandard concrete

Projects affected by the shutdown include Ping'an Finance Center, set to become China's tallest building.


By BD+C Staff | March 29, 2013

State inspectors in Shenzhen, China, have found at least 15 local plants producing concrete with unprocessed sea sand. Thirty-one companies have been cited for violations, and eight were ordered to suspend business for a year. Construction on multiple projects in Guangdong Province—including the 660-m Ping'an Finance Center—has been halted during the inspection. (Only 80 meters of the Ping'an building has been erected so far; China Construction First Building Group Corp. Ltd. is the primary contractor.)

Unprocessed sea sand is illegal to use as an aggregate in concrete because its chlorine and salt content are corrosive to steel, causing buildings to degrade and potentially collapse within a few decades. River sand, the preferred material, costs twice as much and is in short supply.

The scandal is currently confined to Shenzhen but could spread to other cities given the obvious financial incentives for using sea sand. Inspectors also found that two large sand pits were using seawater instead of fresh water to rinse sand, also a problematic practice. 

Industry experts express particular concern because China currently has nine of the putative 20 tallest buildings in the world currently under construction, as well as many other skyscrapers. 

(http://www.scmp.com/news/china/article/1191896/shenzhen-construction-hold-after-alert-over-cheap-sand-concrete)

Related Stories

| May 10, 2012

Chapter 5 LEED-EB and Green Globes CIEB: Rating Sustainable Reconstruction

Certification for existing buildings under these two rating programs has overtaken that for new construction.

| May 10, 2012

Chapter 4 Business Case for High-Performance Reconstructed Buildings

Five reconstruction projects in one city make a bottom-line case for reconstruction across the country.

| May 10, 2012

Chapter 3 How Building Technologies Contribute to Reconstruction Advances

Building Teams are employing a wide variety of components and systems in their reconstruction projects.

| May 10, 2012

Chapter 2 Exemplary High-Performance Reconstruction Projects

Several case studies show how to successfully renovate existing structures into high-performance buildings.

| May 9, 2012

Chapter 1 Reconstruction: ‘The 99% Solution’ for Energy Savings in Buildings

As a share of total construction activity reconstruction has been on the rise in the U.S. and Canada in the last few years, which creates a golden opportunity for extensive energy savings.

| May 9, 2012

International green building speaker to keynote Australia’s largest building systems trade show

Green building, sustainability consultant, green building book author Jerry Yudelson will be the keynote speaker at the Air-Conditioning, Refrigeration and Building Systems (ARBS) conference in Melbourne, Australia.

| May 9, 2012

Tishman delivers Revel six weeks early

Revel stands more than 730 feet tall, consists of over 6.3 milliont--sf of space, and is enclosed by 836,762-sf of glass.

| May 9, 2012

Stoddert Elementary School in DC wins first US DOE Green Ribbon School Award

Sustainable materials, operational efficiency, and student engagement create high-performance, healthy environment for life-long learning.

| May 9, 2012

Shepley Bulfinch given IIDA Design award for Woodruff Library?

The design challenges included creating an entry sequence to orient patrons and highlight services; establishing a sense of identity visible from the exterior; and providing a flexible extended-hours access for part of the learning commons.

| May 9, 2012

Construction Defect Symposium will examine strategies for reducing litigation costs

July event in Key West will target decision makers in the insurance and construction industries.

boombox1
boombox2
native1

More In Category

Mass Timber

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.




Multifamily Housing

AEC inspections are the key to financially viable office to residential adaptive reuse projects

About a year ago our industry was abuzz with an idea that seemed like a one-shot miracle cure for both the shockingly high rate of office vacancies and the worsening housing shortage. The seemingly simple idea of converting empty office buildings to multifamily residential seemed like an easy and elegant solution. However, in the intervening months we’ve seen only a handful of these conversions, despite near universal enthusiasm for the concept. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021