State inspectors in Shenzhen, China, have found at least 15 local plants producing concrete with unprocessed sea sand. Thirty-one companies have been cited for violations, and eight were ordered to suspend business for a year. Construction on multiple projects in Guangdong Province—including the 660-m Ping'an Finance Center—has been halted during the inspection. (Only 80 meters of the Ping'an building has been erected so far; China Construction First Building Group Corp. Ltd. is the primary contractor.)
Unprocessed sea sand is illegal to use as an aggregate in concrete because its chlorine and salt content are corrosive to steel, causing buildings to degrade and potentially collapse within a few decades. River sand, the preferred material, costs twice as much and is in short supply.
The scandal is currently confined to Shenzhen but could spread to other cities given the obvious financial incentives for using sea sand. Inspectors also found that two large sand pits were using seawater instead of fresh water to rinse sand, also a problematic practice.
Industry experts express particular concern because China currently has nine of the putative 20 tallest buildings in the world currently under construction, as well as many other skyscrapers.
(http://www.scmp.com/news/china/article/1191896/shenzhen-construction-hold-after-alert-over-cheap-sand-concrete)
Related Stories
| May 10, 2012
Chapter 5 LEED-EB and Green Globes CIEB: Rating Sustainable Reconstruction
Certification for existing buildings under these two rating programs has overtaken that for new construction.
| May 10, 2012
Chapter 4 Business Case for High-Performance Reconstructed Buildings
Five reconstruction projects in one city make a bottom-line case for reconstruction across the country.
| May 10, 2012
Chapter 3 How Building Technologies Contribute to Reconstruction Advances
Building Teams are employing a wide variety of components and systems in their reconstruction projects.
| May 10, 2012
Chapter 2 Exemplary High-Performance Reconstruction Projects
Several case studies show how to successfully renovate existing structures into high-performance buildings.
| May 9, 2012
Chapter 1 Reconstruction: ‘The 99% Solution’ for Energy Savings in Buildings
As a share of total construction activity reconstruction has been on the rise in the U.S. and Canada in the last few years, which creates a golden opportunity for extensive energy savings.
| May 9, 2012
International green building speaker to keynote Australia’s largest building systems trade show
Green building, sustainability consultant, green building book author Jerry Yudelson will be the keynote speaker at the Air-Conditioning, Refrigeration and Building Systems (ARBS) conference in Melbourne, Australia.
| May 9, 2012
Tishman delivers Revel six weeks early
Revel stands more than 730 feet tall, consists of over 6.3 milliont--sf of space, and is enclosed by 836,762-sf of glass.
| May 9, 2012
Stoddert Elementary School in DC wins first US DOE Green Ribbon School Award
Sustainable materials, operational efficiency, and student engagement create high-performance, healthy environment for life-long learning.
| May 9, 2012
Shepley Bulfinch given IIDA Design award for Woodruff Library?
The design challenges included creating an entry sequence to orient patrons and highlight services; establishing a sense of identity visible from the exterior; and providing a flexible extended-hours access for part of the learning commons.
| May 9, 2012
Construction Defect Symposium will examine strategies for reducing litigation costs
July event in Key West will target decision makers in the insurance and construction industries.