Located along the Lake Washington Ship Canal in Seattle, Fremont Crossing provides the city with a new home for creative tech businesses, retail, and dining options. The new mixed-use complex merges new construction inspired by the maritime heritage of the ship canal, with the renovated and repurposed 1921 Bleitz Funeral Home.
A new four-story, 41,000-sf mixed-use office building will partially wrap around the back of the 7,800-sf redeveloped funeral home and create a courtyard space between the two buildings. The new building will feature floor-to-ceiling windows and a glazed prow, nicknamed “the treehouse,” that will be enclosed in floor-to-ceiling glass and reach from the new building to the old building on the north side of the properties.
Courtesy SkB Architects.
“It’s important that the historic Bleitz Funeral Home maintain its identity,” says Shannon Gaffney, Co-Founder of SkB Architects and Co-Designer for the project, in a release. “We want to showcase the simple elegance of the design, so we’ll be stripping away post-1921 additions that have eroded the building’s historic integrity. When complete, it will look very similar to how it looked originally.”
See Also: Welcome to the Jungle: Amazon’s Spheres have opened to employees and the public
Retail and dining options will occupy the ground level spaces with creative and technology companies occupying the rest of the space. No specific tenants have been determined yet. The complex is expected to break ground at the end of 2018 with a completion date in early 2020.
Courtesy SkB Architects.
Related Stories
| Mar 3, 2013
Hines acquires Archstone's interest in $700 million CityCenterDC project
The Washington D.C. office of Hines, the international real estate firm, announced the acquisition of the ownership interest of their partner, Archstone, in the mixed-use CityCenterDC project that is currently under construction in downtown Washington, D.C.
| Feb 17, 2013
Pakistan to get world's tallest tower in $45 billion deal
Newly signed mega deal will fund construction of several massive developments in Karachi, including a mixed-use tower that will dwarf the Burj Khalifa.
| Jul 12, 2012
EE&K and Knutson Construction selected for the Interchange in Minneapolis
Design-build contract for $79.3 million transportation hub will connect transit with culture.
| Jul 2, 2012
Bernards building mixed-use project in Beverly Hills
The project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 23, 2012
Summit Design+Build selected as GC for Chicago restaurant
Little Goat will truly be a multifunctional space. Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.
| Apr 30, 2012
HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project
HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.