flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Santiago Calatrava’s first major UK project will be the heart of the Greenwich Peninsula transformation

Mixed-Use

Santiago Calatrava’s first major UK project will be the heart of the Greenwich Peninsula transformation

Peninsula Place will cost £1 billion and act as a gateway to the new, master-planned district.


By David Malone, Associate Editor | February 8, 2017

Rendering courtesy of Knight Dragon

A new £1 billion landmark meant to be the centerpiece of London’s Greenwich Peninsula transformation will provide 1.4 million sf of space spread across a podium and three connected towers. The striking, crown-shaped building will provide a multitude of amenities and services for the area such as a new tube and bus station, a theater, a cinema and performance venue, bars, shops, a well-being hub, workspaces, apartments, and hotels.

The Santiago Calatrava-designed building consists of a podium, which contains the two stations an the retail and entertainment aspects of the project, that gives rise to three separate towers that will house the offices, apartments, and hotels. These towers will be connected to the Thames via a new, latticed land bridge very reminiscent of other Calatrava-designed bridges.

Visitors and residents arriving in the new tube station will be greeted with an 80-ft-high winter garden and glass galleria.

Of the project, Calatrava says on the firm’s website, “It is an honor to be designing such a piece of the fabric of London, a city I love. In designing this scheme, I have been inspired by London’s rich architectural heritage and the very special geography of the Peninsula. “

Peninsula Place will become part of the Peninsula Central neighborhood, which will also contain two residential buildings designed by Allies & Morrison, the Greenwich Peninsula master planners. These three buildings will provide 800 homes, 200 of which will be affordable.

In total, the £8.4 billion transformation project will provide 15,720 new homes in seven new neighborhoods, become home to central London’s first major film studio, and add a new design district, as well as new schools, offices, health services, and public spaces.

SOM, Marks Barfield, and DSDHA will also be designing buildings for the Knight Dragon development.

 

The land bridge. Rendering courtesy of Knight Dragon.

 

The winter garden. Rendering courtesy of Knight Dragon.

 

The winter garden. Rendering courtesy of Knight Dragon.

 

View of the land brige with Peninsula Place's three towers in the background. Rendering courtesy of Knight Dragon.

 

Rendering courtesy of Knight Dragon.

 

Tags

Related Stories

Mixed-Use | Oct 11, 2021

Manhattan West opens the heart of New York City’s Far West Side

The project links several New York neighborhoods.

Mixed-Use | Oct 5, 2021

Ground-up mixed-use building completes near Wrigley Field

Hirsch/MPG Architecture + Planning designed the project.

Mixed-Use | Sep 28, 2021

BIG designs new Farfetch HQ on the slopes of Leça River in Porto

The project is situated within the larger Fuse Valley site.

Mixed-Use | Aug 19, 2021

COVID-conscious, pandemic-ready skyscraper breaks ground in Miami

The project will be part of Miami Worldcenter.

Mixed-Use | Aug 4, 2021

Diamond Schmitt to lead design for Therme Canada | Ontario Place redevelopment

The project will be a year-round waterfront destination.

Mixed-Use | Jul 16, 2021

SOM to lead the design of the 2026 Milan-Cortina Olympic Village

The project is part of the updated Porta Romana railway yard master plan.

boombox1
boombox2
native1

More In Category




MFPRO+ Special Reports

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021