flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Santa Monica Professional Building restored into a modern hotel

Hotel Facilities

Santa Monica Professional Building restored into a modern hotel

Howard Laks Architects designed the project.


By David Malone, Associate Editor | February 16, 2021
Santa Monica Proper Hotel exterior during the day

All photos: Tim Street-Porter

The former Santa Monica Professional Building, originally built in 1928, has been converted into the Santa Monica Proper Hotel by Howard Lake Architects (HLA).

The city landmark was converted into 55 rooms for the hotel complex. A newly designed seven-story addition, which includes 216 rooms, is linked to the landmark building with a bridge. The ground floor is activated with retail, restaurants, and landscaped paseo, all open to the public.

 

Santa Monica Proper Hotel connection bridge at dusk

 

HLA’s design approach was to contrast the original building’s elegant Spanish Colonial Revival architecture with a free-form new building designed that avoids direct visual competition between the structures. The addition’s curving plan and walls drape around the historic building. The curved wings of the new building angle to harmonize with the 1928 building’s Y-shaped plan, while also contrasting to the faceted, angular shape of the historic building.

Additional team members include Chattel, Inc. (preservation architect), Elysian Landscapes (landscape designer), Kelly Wearstler (interiors), HLB Lighting Design (lighting consultant), Morley Builders (general contractor), Saiful Bouquet Structural Engineers (new building structural engineer), Structural Focus (landmark building structural engineer), KPFF Consulting Engineers (civil engineers), Donald F. Dickerson Associates (MEP engineer), and GAIA (LEED consultant).

 

Santa Monica Proper Hotel exterior at dusk

Related Stories

Hotel Facilities | Jan 24, 2018

U.S. hotel markets with the largest construction pipelines

Dallas, Houston, and New York lead the way, with more than 460 hotel projects in the works.

Hotel Facilities | Nov 10, 2017

The hotel of the future has just the right amount of tech

CallisonRTKL’s recent survey helps shed some light on how the hotel of the future might strike a balance between tech and the human touch.

Hotel Facilities | Oct 6, 2017

This year’s Radical Innovation Award winners showcase portable and flexible hotel designs

The grand prize hotel concept gives new meaning to “back to nature.” 

Adaptive Reuse | Oct 5, 2017

Wexford’s latest innovation center breaks ground in Providence

The campus is expected to include an Aloft hotel. 

Giants 400 | Sep 22, 2017

Welcome home: Hotels want guests to feel more like residents than visitors

Because hotels can take as long as six years to complete, spotting trends—and differentiating them from fads—is tough when tastes and systems change so rapidly.

Giants 400 | Sep 22, 2017

Top 80 hotel construction firms

Turner Construction Co., Swinerton, and The Whiting-Turner Contracting Co. top BD+C’s ranking of the nation’s largest hotel sector contractor and construction management firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Sep 22, 2017

Top 30 hotel engineering firms

NV5 Global, WSP, and DeSimone Consulting Engineers top BD+C’s ranking of the nation’s largest hotel sector engineering and EA firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Sep 22, 2017

Top 60 hotel architecture firms

Gensler, WATG and Wimberly Interiors, and HKS top BD+C’s ranking of the nation’s largest hotel sector architecture and AE firms, as reported in the 2017 Giants 300 Report.

Architects | Sep 13, 2017

Leo A Daly hires hospitality-design veteran to lead its Dallas office

Ken Martin views this sector as an incubator of innovation.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021