flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Reconstruction Awards: Massachusetts Maritime Academy

Reconstruction Awards

Reconstruction Awards: Massachusetts Maritime Academy

The two-story “overbuild” employed block and plank construction with drag strut detailing to connect it to the existing building.


By BD+C Staff | November 16, 2016

The Massachusetts Maritime Academy, on Cape Cod. The residential addition is behind the Mess Deck in the foreground. Ben Johnson / Shawmut Design and Construction 

Massachusetts Maritime Academy is located in a flood zone on Cape Cod, which restricts its potential building area. To provide MMA more dormitory rooms and cadet amenities, the Building Team, led by Prellwitz Chilinski Associates and Shawmut Design and Construction, reorganized five interconnected buildings, bolted a six-story wing onto an existing building, and added 300 beds to the campus. The two-story “overbuild” employed block and plank construction with drag strut detailing to connect it to the existing building.

Construction took three years—and 11 permits—to complete. Work could only be done in the summer or during the 10 weeks of winter when cadets were training at sea.

A new glass entrance and connector space consolidates student services into one location. A skylit boardwalk leads to 12 social spaces, a fitness center, offices, a mess deck with 200 seats, and a 100-seat dining lounge.

 

PROJECT SUMMARY 

 

Bronze Award Winner | Buzzards Bay, Mass.

Building Team: Shawmut Design and Construction (submitting firm, GC); Prellwitz Chilinski Associates (submitting firm, architect); Massachusetts Maritime Academy (owner); ODEH Engineers (SE); AFK Group (MEP); WaypointKLA (CM).

Details: 324,000 sf. Construction cost: $51.6 million. Construction time: December 2012 to August 2015. Delivery Method: CM at risk.

Related Stories

Reconstruction Awards | Nov 11, 2016

Exclusive Chicago club re-emerges as a boutique hotel

Built in 1893 for the World’s Columbian Exposition, the CAA was an exclusive social club founded by leading figures in American sports and commerce.

Reconstruction Awards | Dec 1, 2015

Massive Chicago parking garage gets overdue waterproofing

Millennium Lakeside Garage, the largest underground parking facility in the U.S., hadn’t been waterproofed since the 1970s. The massive project took nearly 2½ years and 33,554 man-hours.

Reconstruction Awards | Nov 30, 2015

Washington Monument restored after 2011 East Coast earthquake

This restoration and repair project, which was completed under budget and eight days early (despite several setbacks), involved re-pointing 2.5 miles of mortar joints, repairing 1,200 linear feet of cracks, and installing 150 sf of Dutchman repairs. Construction took place from November 2011 to May 2014.

Reconstruction Awards | Nov 30, 2015

Denver's 107-year-old seminary campus modernized

The scope of the project included the seminary dorms, library, and chapel, all of which posed their own set of obstacles.

Reconstruction Awards | Nov 24, 2015

Center of I.M. Pei-designed plaza part of Washington redevelopment

The L’Enfant Plaza, a three-story below-grade mall, was renovated to include a new glass atrium pavilion and a 40-foot-long, interactive LED.

Reconstruction Awards | Nov 24, 2015

Manhattan's first freestanding emergency department a result of adaptive reuse

The Lenox Hill Healthplex, a restoration of the Curran O’Toole Building, has glass-block walls and a carefully preserved exterior.

Reconstruction Awards | Nov 19, 2015

Nave restored at Yale’s Sterling Memorial Library

Turner Construction and Helpern Architects revived the 150-foot-long nave, which was embellished with stained glass windows by G. Owen Bonawit, stone carvings by René P. Chambellan, and decorative ironwork by Samuel Yellin.

Reconstruction Awards | Nov 19, 2015

Infinite Chicago redevelopment bridges past to present

The renovation of three historic downtown buildings—the Gibbons and Steger Buildings and Pickwick Stables—includes a multi-level concrete walkway connection.

Reconstruction Awards | Nov 18, 2015

Sun Theater serves the youth of St. Louis

Lawrence Group and property owner TLG Beaux Arts raised $11 million to restore the 26,000-sf theater into a modern performance venue.  

Reconstruction Awards | Nov 17, 2015

Smithsonian Institution’s Arts and Industries Building again an exposition and museum space

After removing decades’ worth of unfortunate additions to expose 17 historic interior spaces for the National Historic Landmark, the Building Team zoned in on the client’s key concern.  

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021