When Motorola decided to move its headquarters back to Chicago, it left a 225-acre campus vacant in Schaumburg, Ill. The large plot of land is now being redeveloped into a mixed-use living and entertainment district by UrbanStreet Group and Antunovich Associates.
Dubbed Veridian, the mixed-use development will feature residential space, office space, a hotel, entertainment, dining, and urban-style street retail. The site has been divided into multiple parcels of land, many of which will be sold to individual developers, with the goal being to bring an urban feel to the Chicago suburbs.
Currently, the development is set to feature the already completed Zurich headquarters; two parks, one measuring in at nine acres and one at 13 acres; a retirement village; an assisted living community; the Element at Veridian, a 260-unit luxury apartment building (set for completion in 2020); over 200 townhomes; a Top Golf; an atrium office building; a 220-key hotel; and a retail and entertainment “Town Center.” Motorola Solutions will also maintain a presence as one of Veridian’s corporate anchor tenants.
The retail and entertainment district will be highly walkable and include unique shopping and dining options. Additionally, it will host a variety of entertainment opportunities such as concerts, movies, and ice skating.
See Also: Gensler, Corgan reveal their design concepts for Uber Air Skyports
Antunovich Associates will initially be responsible for the planning and designing of the main Town Center parcel. This parcel will feature approximately 800,000 sf of built area within the retail core, not including the four parking structures that will support it. Construction on a new spine road and infrastructure is slated to begin later this year with phase one completion as soon as Fall of 2020.
Courtesy Veridian.
Related Stories
| Mar 3, 2013
Hines acquires Archstone's interest in $700 million CityCenterDC project
The Washington D.C. office of Hines, the international real estate firm, announced the acquisition of the ownership interest of their partner, Archstone, in the mixed-use CityCenterDC project that is currently under construction in downtown Washington, D.C.
| Feb 17, 2013
Pakistan to get world's tallest tower in $45 billion deal
Newly signed mega deal will fund construction of several massive developments in Karachi, including a mixed-use tower that will dwarf the Burj Khalifa.
| Jul 12, 2012
EE&K and Knutson Construction selected for the Interchange in Minneapolis
Design-build contract for $79.3 million transportation hub will connect transit with culture.
| Jul 2, 2012
Bernards building mixed-use project in Beverly Hills
The project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 23, 2012
Summit Design+Build selected as GC for Chicago restaurant
Little Goat will truly be a multifunctional space. Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.
| Apr 30, 2012
HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project
HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.