flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

New village hall boasts contemporary look, LEED Gold status

Sponsored Content Metals

New village hall boasts contemporary look, LEED Gold status

The building design was inspired by historical elements in the community, and utilizes traditional masonry construction highlighted with a contemporary PAC-CLAD standing seam metal roof.


By Petersen Aluminum | October 19, 2016
Mundelein Village Hall, Mundelein, IL
Architect: Wight & Company
General Contractor: Weston Solutions
Installing contractor: Sullivan Roofing
Profiles: Snap-Clad, Snap-On, PAC-750 Soffit, 7.2 Wall Panels
Color: Zinc

After more than five years of planning within an unusual public-private partnership, a spectacular new village administration building has been completed in Mundelein Village, Ill. The two-story, 32,000 sq. ft. structure, which achieved LEED Gold status, replaces an aging building that served as the town’s headquarters since 1929.

Village officials hired Weston Solutions, a Vernon Hills, Ill. property development company, to oversee construction of the facility on a previously under-utilized industrial site. As part of the deal, Weston Solutions relocated its offices to the new building. The Village will utilize 15,000 sq. ft. on the first floor and Weston Solutions will occupy the second floor.

“The Village would not have moved forward on the project without Weston,” said John Lobaito, village administrator. “Weston’s shared vision made it the ideal partner and achieved our goal of attracting private investment.”

Architectural design was created by Wight & Company in Darien, Ill. The building design was inspired by historical elements in the community, and utilizes traditional masonry construction highlighted with a contemporary PAC-CLAD standing seam metal roof. “The slope of the hillside site made the roof particularly visible,” said Jason Dwyer, project architect. “We chose to use the metal standing seam panels to give the building a nice aesthetic appeal.”

A total of four Petersen products were used on this project. Approximately 14,000 sq. ft. of Petersen standing seam panels in two profiles were installed. Products included 18” wide Snap-Clad panels and 12” wide Snap-On panels, both finished in PAC-CLAD Cool Color Zinc. In addition, 3,300 sq. ft. of Petersen’s 7.2 Panel were used to shield a mechanical pit on top of the building. Finally, 1,000 sq. ft. of PAC-750 soffit panels were used to complete the roof concept.

All Petersen profiles were installed by Sullivan Roofing in Schaumburg, Ill. “This job was a complex mixture of panels and profiles, as well as difficult fabrications,” said Reid Whetham, project manager. “It was a challenging project with straight panels running into a curved valley. Petersen fabricated all of the panels and we custom-made the trim and flashings. We used the Snap-On panels to create the curved areas of the clock tower.” The PAC-CLAD panels were manufactured at Petersen’s plant in Elk Grove Village, Ill.

Sullivan Roofing is a regular user of PAC-CLAD products. “Probably a majority of our business is through Petersen,” Whetham said. “They do a great job with technical support, quality products and competitive pricing.”

The building incorporates numerous sustainable strategies to achieve LEED Gold certification.

Long-recognized as an industry leader in metal standing seam roofing products, Petersen also offers exposed fastener panels, flush panels, composite wall panels and column covers. All provide the well-known Petersen quality and are available in PAC-CLAD® Kynar 500® finish in 38 standard colors on steel and 37 aluminum. Most colors meet LEED, ENERGY STAR and cool roof certification requirements.

For more information on the complete line of Petersen metal products, call 800-PAC-CLAD or visit www.pac-clad.com.

Tags

Related Stories

| Apr 17, 2014

6 details that can throw off your schedule

In 1997, Apple told us to “Think Different.” So we did. We thought about what could happen if the world went mobile, if information was boundless, if we could carry our office in our back pocket. We’ve grown to love different and to expect change. And when it comes to Apple products, that’s not such a bad thing. When it comes to your building order, however, it’s not nearly as appealing.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 8, 2014

Reflecting on job number 61-001

Job number 61-001 changed everything. It was sold in 1961, a year of change for the nation and for Star. By January, John F. Kennedy would be president. By the end of the year, Star would launch a historic shift in our product and our distribution, a shift still active today.

| Mar 31, 2014

Tips for creating a competitive bid using codes and loads

Landing a project feels like winning a prize, sort of like finding that forgotten $20 bill in the pocket of a pair of jeans you haven’t worn in a while. But living on the “chance” of winning a job isn’t a great way to pay your electric bill. So, how do you swing the chances in your favor?

| Mar 26, 2014

A sales and service showcase

High Plains Equipment, a Case IH dealership in Devils Lake, N.D., constructs a larger facility to better serve its customers.

| Mar 19, 2014

Frames: the biggest value engineering tip

In every aspect of a metal building, you can tweak the cost by adjusting the finish, panel thickness, and panel profile. These changes might make a few percentage points difference in the cost. Change the framing and you have the opportunity to affect 10-20 percent savings to the metal building portion of the project.

| Mar 11, 2014

Why you should start with a builder, part three

We had worked together for 30 years. As a long-standing client of mine, he and I had gone through many projects together. And we were approaching another project, one that would forever change how he viewed our working relationship. As my customer and I sat down to talk about the project details, he told me something that would stay with me for weeks. “Kim, I’m going to have to get other bids on this just so I have peace of mind.”

Sponsored | | Mar 10, 2014

A high-performance barn

Bastoni Vineyards replaces a wooden barn with an efficient metal building used for maintenance, storage, and hosting events.

| Mar 4, 2014

CENTRIA Demonstrates Commitment to Contractors

New Brochure Highlights Architectural Metal Panel Manufacturer’s Products, Expertise and Experience

| Feb 27, 2014

Colorado Coalition Plans Welcoming Events for METALCON International Visitors

Visitors to the 24th METALCON International, slated for October 1-3 at the Colorado Convention Center in Denver, will get a royal welcome from local companies involved in the show. Denver-based New Tech Machinery and Colorado Springs-based S-5! Solutions have formed the Colorado Coalition as a way of encouraging visitors to learn about Colorado before they arrive and for Coloradans to experience METALCON.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021