flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

New veterinarian building is Norway’s largest ever development in the university sector

Laboratories

New veterinarian building is Norway’s largest ever development in the university sector

The project is one of the largest and most complex ever undertaken in Norway.


By David Malone, Managing Editor | February 3, 2022
Veterinary Building aerial
Photos: Einar Aslaksen

A new 678,000-sf veterinary building has completed at the Norwegian University of Life Science's (NMBU) Campus Ås. The Henning Larsen-designed project brings together research facilities and teaching space for veterinary medicine in one of the most advanced veterinary buildings in Europe. The project represents the largest overall development in the university and college sector in Norway’s history.

The Veterinary Building at Campus Ås is eight distinct but linked buildings that unites previously disparate resources. The building includes over 2,400 rooms across the approximately 678,000 sf space, rarely rising over four stories. It is subdivided into eight wings that are distributed between the building’s two primary programs: the Norwegian Veterinary Institute and the Norwegian University of Life Science.

Veterinary Building by Henning Larsen

The sensitive and hazardous spaces within the campus, such as the Veterinary Building’s laboratories for infectious disease research and surgical suites, are bound to the center and protected by a permeable barrier of public program that rings the campus’ exterior. The building is also broken into smaller modules that can be individually locked down if needed.

Researchers, faculty, students, and visiting experts can meet and learn from each other in social spaces that are spread throughout the building’s stables, aquariums, animal clinics, hydrotherapy pools, riding halls, BSL 3 laboratories, autopsy rooms, classrooms, offices, libraries, and canteens.

Veterinary Building animal area

The Veterinary Building’s facade is made of over 300,000 hand-cut bricks, each coal fired to give them an individual sheen and texture. The reddish-brown hue of the bricks matches the surrounding campus structures, some of which date back to the campus’ founding in 1859. Native plants surround the bulk of the new building and can also be found atop the building, where sedum roofs support an insect habitat.

The project, which was developed for Statsbygg in cooperation with Multiconsult, Fabel Arkitekter, Link Arkitektur, and Erichsen + Horgen, officially opened on Sept. 1, 2021. It houses approximately 700 students and almost 1,000 employees.

Veterinary Building lab

Veterinary Building circulation space

Veterinary Building Laboratory space

Henning Larsen surgical room

Related Stories

Laboratories | Jun 24, 2020

CDC set to build the most advanced high containment laboratory in the country

Flad Architects, Page Southerland Page, and WSP will plan, program, and design the HCCL.

University Buildings | Jun 3, 2020

Renovation can turn older university buildings into high-performing labs

David Miller of BSALifeStructures offers technical advice on renovation of college and university laboratories and scientific research facilities.

Giants 400 | Aug 13, 2019

2019 Science + Technology Giants Report: Operational flexibility is a must for S+T buildings

The science and technology (S+T) sector is arguably the industry’s most complex because it caters to a diverse clientele with specific priorities and imperatives, according to Building Design+Construction's 2019 Giants 300 Report.

Laboratories | May 21, 2019

Georgia Tech Research Institute adds 350,000 sf of specialized tech facilities

McCarthy Building Companies with Flad Architects acted as the design-build team.

Laboratories | Apr 23, 2019

Translational health science environments: 6 strategies for open innovation and knowledge transfer

Simply putting researchers and clinicians in the same building with hopes that serendipitous collaborations will ensue will often not yield the outcomes organizations seek.

Sustainable Design and Construction | Apr 9, 2019

One of the largest zero-carbon, net-zero buildings is rising in Spokane

Catalyst will be part of an innovation hub, with Eastern Washington University as its main tenant.

Laboratories | Apr 1, 2019

The Karolinska Institute’s new laboratory building

C.F. Møller Architects designed the building.

| Mar 21, 2019

Preserving Edison's "Corporate" R&D Lab in West Orange, N.J.

Report on Thomas Edison's West Orange, N.J., Laboratory.

Mixed-Use | Oct 25, 2018

Philadelphia’s uCity Square kicks off major expansion drive

This innovation center has several office, lab, and residential buildings in the works.

University Buildings | Jul 5, 2018

Brown University’s Engineering Research Center increases the university’s School of Engineering lab space by 30%

KieranTimberlake designed the facility and Shawmut Design and Construction was the general contractor.

boombox1 - default
boombox2 -
native1 -

More In Category


Laboratories

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021