flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Modest recession for education construction

Modest recession for education construction


August 11, 2010
This article first appeared in the 200906 issue of BD+C.

Construction spending for education expanded modestly but steadily through March, while at the same time growth for other institutional construction had stalled earlier in 2009.

Education spending is now at or near the peak for this building cycle. The value of education starts is off 9% year-to-date compared to 2008. April starts fell 14% to the lowest total in more than three years. BD+C projects a 3–4% dip in education construction spending into early 2010, and then a recovery by the end of next year, which will bring spending up to early 2009 peak levels. Public education spending is up 6.4% in the past year but spending in the smaller, private sector dropped 0.4%. Funding for private education projects is very sensitive to current economic conditions, specifically tuition payments from current income and investment earnings.

College construction spending is up 12.2% from a year ago, but K-12 spending is up only 3%. Colleges boosted spending for instructional space 20.6% over the past year. Dormitory spending was up only 5%. These increases are the result of the relatively rapid expansion of community colleges and part-time programs for working adults. The small expansion of K-12 construction spending was entirely for high schools, which is up 7.9% over the last year. Middle school construction spending was steady, while elementary spending fell about 3%. These differences mirror enrollment changes. The peak enrollment is now in the 10th grade, which puts more pressure on high schools.

The reason the education construction recession is relatively modest is largely due to nearly $200 billion in state and local government aid included in the stimulus plan. This money is being paid out quickly because it's not linked to specific projects. These new funds offset the huge negative impact of reduced tax receipts in FY 09–10. Without the stimulus funds, a deep recession in public education construction would occur in 2009–10. Instead, most of the recession will be offset, with the balance deferred to 2011–12.

Related Stories

Performing Arts Centers | Jun 30, 2017

L.A.’s John Anson Ford Amphitheater might finally be ready for its close-up

The performing arts venue, nearly a century old, has undergone an extensive refurbishing.

Building Team | Jun 27, 2017

Bruner Foundation announces 2017 Rudy Bruner Award for Urban Excellence gold and silver medalists

The SteelStacks Arts and Cultural Campus in Bethlehem, Pa., receives the gold medal and $50,000.

Libraries | May 31, 2017

A year after its facelift, Boston’s Public Library is relevant again

Visitors are flocking to its brighter, connected halls, which now include retail and digital components. 

Cultural Facilities | May 25, 2017

The Shed, a multi-arts center on New York’s west side, moves forward in construction and funding

The facility, designed for maximum programming flexibility, includes a massive movable shell. 

Cultural Facilities | May 4, 2017

Obama Foundation reveals first look at the Obama Presidential Center

The design comprises three buildings set in the public space of Jackson Park on Chicago’s South Side.

Performing Arts Centers | Mar 6, 2017

An oval defines the Frank Gehry-designed Pierre Boulez Saal concert hall

The hall hosted its debut concert on Saturday, March 4 with a performance by the Boulez Ensemble.

Cultural Facilities | Mar 2, 2017

The Hanoi Lotus Centre will bloom from the middle of a lake

The building will act as a symbol of growth and prosperity for the city of Hanoi.

Cultural Facilities | Jan 30, 2017

Former windmill factory proposed as new ‘vibrant culture house’

The transformed building would provide space for street sports, street culture, and street art.

Cultural Facilities | Dec 14, 2016

Institutions aggressively targeting private donors to fund construction projects

Capital campaigns abound, even though government financing still plays a vital role.

Cultural Facilities | Oct 27, 2016

Zaha Hadid Architects’ Urban Heritage Administration Centre takes its design from the surrounding desert

The futuristic curves that have become a staple for ZHA-designed buildings are also on full display.

boombox1 - default
boombox2 -
native1 -

More In Category

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021