The Reservation of the Colorado River Indian Tribes (CRIT), a federally recognized sovereign Indian tribe, extends to both the Arizona and California side of the majestic Colorado River. While the primary economic activity on the CRIT Reservation has always been agriculture, recent ventures into diversified businesses and tourism, including a new casino, have bolstered economic growth, thereby creating the need for a new state-of-the-art fire safety substation to serve the community.
Deemed a top priority by the CRIT Tribal Council, the vision for the facility was to meet current and future operational needs for at least the next decade, as well as to be a point of pride for CRIT community members. The resulting fire safety substation is a multifunctional facility that includes a fire station, administration space, community meeting rooms, crew quarters, an emergency operation center, triage and stabilization clinic and six apparatus bays.
The unforgiving desert temperatures, often in excess of 120 degrees Fahrenheit, not to mention year-round high winds and sandstorms (the area of the Western Arizona desert regularly sees wind speeds greater than 25 mph winds with gusts of 75 mph) created a unique challenge for the new construction’s project team, but environmental extremes were just one consideration. Additional factors such as a need to meet energy efficiency guidelines, a requirement for extreme durability and minimal long-term maintenance, as well as tight scheduling, called for a creative solution, one that combined a Star Building Systems custom-engineered steel structure and metal panels with conventional materials.
As Greg St. Clair, president of Tempe-based Arizona Corporate Builders LLC, explained in a Metal Architecture interview, “This project was a great example of the use of the [Star] custom pre-engineered steel structure along with a conventional concrete masonry unit (CMU) and wood structures to create an economical yet aesthetically pleasing architectural look. The architect [Stroh Architecture Inc.] was brilliant in his choice of multiple metal panels. The schedule of this project was definitely a big challenge. The use of the PEMB structure played a big part in providing a structure that was quick to erect. Extra consideration had to be taken to accommodate most the trades having to travel distances to perform on this project to be able to do their work with only one mobilization.”
Half of the building—the auxiliary portion for the fire engines and training areas—was a custom-engineered metal structure and the other half with all the offices and support areas was a conventional frame, all under one roof. Arizona Corporate Builders, which specializes in custom pre-engineered metal buildings, erected the metal structure that housed the apparatus bays, and installed the metal roof on the entire structure. Overall, Arizona Corporate Builders installed approximately 13,300 square feet of 24-gauge BattenLok® HS metal roof panels. Polar White was chosen for the standing seam roof to maximize reduction of solar heat gain. The further appeal of a standing seam roof here is
that it is a long-lasting and low-maintenance roof system for a relatively reasonable amount of money.
Â
Â
As to the benefits of the Star PEMB for this project, St. Clair remarks that economics, sustainability, durability, and flexibility all came into play, as well as aesthetics since Star was able to include the specific panels needed as part of its package. He explains:
“Generally speaking, a pre-engineered metal building is a more economical way to do structures, especially an open structure like this one where we had the need to fit the trucks in there with no columns inside getting in the way.” Although the other section of the building used concrete masonry and wood, Star was able to provide the roof sheeting portion of it so that it would all match. The designers wanted it to visually appear as one system. “It all runs together,” says St. Clair. “The masonry shows for architectural feature, and then there are some metal panels that match or are the same panels that go around the apparatus bay.”
Coordination with the architect was key as to how to attach the panels throughout the structure, especially given that the construction consisted of both a metal building system and other conventional materials. Different mechanisms or fasteners were needed to attach the panels and ensure they all looked cohesive.
From Star’s perspective, the project had a lot going on with it due to different angles, textured surfaces and color contrast. The Star system incorporated wind beam bracing instead of a conventional portal frame or X-bracing due to clearance requirements.
The well-received project, completed in February 2019, was a big success all around—with the result a distinctive and elegant design with reasonable construction costs and low long-term maintenance needs.
Â
Colorado River Indian Tribes’ Fire Safety Substation, Parker, AZ
Completed: February 2019
Size: 13,327 square feet
Owner: Colorado River Indian Tribes of the Colorado River Indian Reservation, Arizona and California
General Contractor: Low Mountain Construction Inc., Phoenix, AZ
Architect: Stroh Architecture, Inc., Prescott, AZ
Erector/Installer: Arizona Corporate Builders LLC., Tempe, AZ
Metal Building System: Star Building Systems, Oklahoma City
Metal Roof Panels: MBCI, Houston
Related Stories
Sponsored | Coatings | Aug 16, 2017
Architectural details offer endless inspiration
Railings, screens, canopies, and shading devices punctuate projects and are important aspects of the built environment.
Sponsored | Roofing | Jun 29, 2017
Metal roofs are soaring in popularity in the residential market
The Metal Roofing Alliance estimates that 750,000 metal roofs were installed on U.S. homes in 2015.
Sponsored | Metals | Jun 15, 2017
Inside-out cheese-making: 12,000-sf metal building features an unusual exoskeleton design
In order to maintain hygienic cleanliness inside the facility, smooth, continuous wall surfaces with a minimum number of joints, indents or protrusions is desirable.
| Jun 13, 2017
Accelerate Live! talk: Driving value through process innovation, Jonathan O'Leary, NCI Building Systems (sponsored)
NCI Building Systems’ Jonathan O'Leary discusses why AEC firms must rely on their partners to simplify the business process and minimize risk.
Sponsored | Roofing | May 24, 2017
Duro-Last Duro-Bond Roofing System installed on New England warehouse
Breault Roofing created a way to make the installation process more efficient by requesting mostly tabless sheets and fastening the membrane with induction welding to the purlins instead of a regular mechanically fastened system onto the pan.
Sponsored | Metals | May 22, 2017
Tapered columns can slim down costs
In many metal building applications, straight columns may have more steel than they need.
Sponsored | Coatings | May 5, 2017
Butler Tech Bioscience Center features hands-on learning in bold new building
Butler Tech students can now study and work in neighboring buildings that feature ALPOLIC metal panels coated in Valspar’s Valflon®.Â
Sponsored | Metals | May 3, 2017
Steel protection methods
There are robust, well-proven ways to protect steel so it can perform up to its potential virtually indefinitely.
Sponsored | Metals | Apr 28, 2017
Colorful corrugated wall panels provide bright new look for community library
Approximately 2,600 sq. ft. of PAC-CLAD 7/8” Corrugated Panels in five different colors was just what the design team was looking for.
Sponsored | Coatings | Apr 27, 2017
Community center makes a statement in West Sacramento
It takes a team to find the perfect color combination, and this time we accomplished it with the help of CENTRIA.