flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

M&A activity down in 2013 among architecture, engineering firms: Report

M&A activity down in 2013 among architecture, engineering firms: Report

Many of the firms that have traditionally been the most active buyers in the industry spent 2013 mostly on the sidelines. 


By Morrissey Goodale | February 5, 2014
In 2013, consultant Morrissey Goodale observed 168 sales of U.S.-based architecture and engineering (“A/E”) firms – down nearly 7% from the record 180 sales of U.S.-based A/E firms in 2012. Similarly, just 107 international A/E firms sold in 2013, a drop of more than 20% from the 135 deals in 2012. Yet 2013 was anticipated by many to be another break-neck, record-setting year for A/E industry M&A. The economy continued to recover, performance at many firms climbed back to pre-recession levels, and things were looking up for a year of rapid deal-making. So what caused industry dealmakers to slow down after living 2012 in the fast lane? 
 
·       Owners rode the (modest) wave. As the economy persisted to creep toward respectability in 2013 and value continued to build in A/E firms, prospective sellers showed an increasing reluctance to jump at offers. Instead, they were inclined to take the longer view of building a track record of solid performance, desiring to sell at the high (or at least higher) water mark that many A/E firm leaders believe is still on the horizon.
 
·       Tax-driven deal spike late in 2012. U.S. sellers seemed to be certain they needed to sell in 2012 to minimize capital gains which were anticipated to climb in 2013. We observed an unusually high flurry of deal activity in late 2012, seemingly driven by a desire to get deals done by year end. With tax rates steady for the foreseeable future, we anticipate the competitive environment, age, ownership and leadership transition, and other factors will drive owners’ desires to sell their firms.
 
·       Large firms took a breather in 2013. Many of the firms that have traditionally been the most active buyers in the industry spent 2013 mostly on the sidelines. Firms like AECOM, SNC-Lavalin, Genivar (now WSP Global), IBI Group, ARCADIS, and URS, among others, slowed or stopped their M&A programs in 2013. This decline may be attributable to the need to integrate the firms they acquired over the last few years, work on internal initiatives, or simply being unable to find and close deals that met their strategic needs at appropriate valuations in 2013.
 

About Morrissey Goodale LLC

Based in Newton, Mass., Morrissey Goodale LLC is a leading management consulting and research firm serving the architecture, engineering, and Construction (AEC) industry. 

Related Stories

Office Buildings | Mar 27, 2024

A new Singapore office campus inaugurates the Jurong Innovation District, a business park located in a tropical rainforest

Surbana Jurong, an urban, infrastructure and managed services consulting firm, recently opened its new headquarters in Singapore. Surbana Jurong Campus inaugurates the Jurong Innovation District, a business park set in a tropical rainforest.

Cultural Facilities | Mar 27, 2024

Kansas City’s new Sobela Ocean Aquarium home to nearly 8,000 animals in 34 habitats

Kansas City’s new Sobela Ocean Aquarium is a world-class facility home to nearly 8,000 animals in 34 habitats ranging from small tanks to a giant 400,000-gallon shark tank. 

Market Data | Mar 26, 2024

Architecture firm billings see modest easing in February

Architecture firm billings continued to decline in February, with an AIA/Deltek Architecture Billings Index (ABI) score of 49.5 for the month. However, February’s score marks the most modest easing in billings since July 2023 and suggests that the recent slowdown may be receding.

Cultural Facilities | Mar 26, 2024

Renovation restores century-old Brooklyn Paramount Theater to its original use

The renovation of the iconic Brooklyn Paramount Theater restored the building to its original purpose as a movie theater and music performance venue. Long Island University had acquired the venue in the 1960s and repurposed it as the school’s basketball court.

Adaptive Reuse | Mar 26, 2024

Adaptive Reuse Scorecard released to help developers assess project viability

Lamar Johnson Collaborative announced the debut of the firm’s Adaptive Reuse Scorecard, a proprietary methodology to quickly analyze the viability of converting buildings to other uses.

Security and Life Safety | Mar 26, 2024

Safeguarding our schools: Strategies to protect students and keep campuses safe

HMC Architects' PreK-12 Principal in Charge, Sherry Sajadpour, shares insights from school security experts and advisors on PreK-12 design strategies.

Green | Mar 25, 2024

Zero-carbon multifamily development designed for transactive energy

Living EmPower House, which is set to be the first zero-carbon, replicable, and equitable multifamily development designed for transactive energy, recently was awarded a $9 million Next EPIC Grant Construction Loan from the State of California. 

Museums | Mar 25, 2024

Chrysler Museum of Art’s newly expanded Perry Glass Studio will display the art of glassmaking

In Norfolk, Va., the Chrysler Museum of Art’s Perry Glass Studio, an educational facility for glassmaking, will open a new addition in May. That will be followed by a renovation of the existing building scheduled for completion in December.

Sustainability | Mar 21, 2024

World’s first TRUE-certified building project completed in California

GENESIS Marina, an expansive laboratory and office campus in Brisbane, Calif., is the world’s first Total Resource Use and Efficiency (TRUE)-certified construction endeavor. The certification recognizes projects that achieve outstanding levels of resource efficiency through waste reduction, reuse, and recycling practices.

boombox1 - default
boombox2 -
native1 -

More In Category


Mass Timber

Bjarke Ingels Group designs a mass timber cube structure for the University of Kansas

Bjarke Ingels Group (BIG) and executive architect BNIM have unveiled their design for a new mass timber cube structure called the Makers’ KUbe for the University of Kansas School of Architecture & Design. A six-story, 50,000-sf building for learning and collaboration, the light-filled KUbe will house studio and teaching space, 3D-printing and robotic labs, and a ground-level cafe, all organized around a central core.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021