A recent large scale renovation and addition to the Loma Linda University Medical School in Murrieta, Calif., culminated in a 273,207-sf facility for the new Loma Linda University Medical Center, adding more than 100 beds to the existing facility. One of the tallest buildings in the Inland Empire region, the building includes a 19-bed emergency room, intensive care unit, labor and delivery center, and a specialty children's hospital.
Designers for the building aimed to create a positive environment for patients and visitors, and wanted to let in as much natural daylight as possible. Various metal products from Centria were selected to create a dramatic and influential aesthetic without sacrificing performance. The Formawall Dimension Series, the only wall system that provides both advanced thermal and moisture protection in a single panelized component, was installed to help create a wall with superior thermal efficiency and moisture control, helping the medical center keep on track with its two-year construction goal.
Also selected were Formavue windows, designed to integrate seamlessly with the Formawall Dimension Series. The windows accommodate a variety of fenestrations and construction types, and feature a standard thermal break for enhanced thermal performance.
The Building Team: Davis Stokes Collaborative (architect), Layton Construction Co. Inc. (contractor), A.C. Dellovade Inc. (Centria dealer/installer). +
Related Stories
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 31, 2012
3 Metal Roofing Case Studies Illustrate Benefits
Metal roofing systems offer values such as longevity, favorable life cycle costs, and heightened aesthetic appeal.
| May 31, 2012
5 military construction trends
Defense spending may be down somewhat, but there’s still plenty of project dollars out there if you know where to look.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 15, 2012
Suffolk selected for Rosenwald Elementary modernization project
The 314-student station elementary school will undergo extensive modernization.
| May 15, 2012
Don’t be insulated from green building
Examining the roles of insulation and manufacturing in sustainability’s growth.
| May 14, 2012
SOM to break ground on supertall structure in China
The 1,740-feet (530-meter) tall tower will house offices, 300 service apartments and a 350-room, 5-star hotel beneath an arched top.
| May 9, 2012
Shepley Bulfinch given IIDA Design award for Woodruff Library?
The design challenges included creating an entry sequence to orient patrons and highlight services; establishing a sense of identity visible from the exterior; and providing a flexible extended-hours access for part of the learning commons.