A recent large scale renovation and addition to the Loma Linda University Medical School in Murrieta, Calif., culminated in a 273,207-sf facility for the new Loma Linda University Medical Center, adding more than 100 beds to the existing facility. One of the tallest buildings in the Inland Empire region, the building includes a 19-bed emergency room, intensive care unit, labor and delivery center, and a specialty children's hospital.
Designers for the building aimed to create a positive environment for patients and visitors, and wanted to let in as much natural daylight as possible. Various metal products from Centria were selected to create a dramatic and influential aesthetic without sacrificing performance. The Formawall Dimension Series, the only wall system that provides both advanced thermal and moisture protection in a single panelized component, was installed to help create a wall with superior thermal efficiency and moisture control, helping the medical center keep on track with its two-year construction goal.
Also selected were Formavue windows, designed to integrate seamlessly with the Formawall Dimension Series. The windows accommodate a variety of fenestrations and construction types, and feature a standard thermal break for enhanced thermal performance.
The Building Team: Davis Stokes Collaborative (architect), Layton Construction Co. Inc. (contractor), A.C. Dellovade Inc. (Centria dealer/installer). +
Related Stories
| Sep 13, 2013
Video: Arup offers tour of world's first algae-powered building
Dubbed BIQ house, the building features a bright green façade consisting of hollow glass panels filled with algae and water.
| Sep 9, 2013
Top 25 continuing education courses on BDCuniversity
An overview of the 25 most popular continuing education courses on BDCuniversity.com.
| Aug 26, 2013
13 must-attend continuing education sessions at BUILDINGChicago
Building Design+Construction's new conference and expo, BUILDINGChicago, kicks off in two weeks. The three-day event will feature more than 65 AIA CES and GBCI accredited sessions, on everything from building information modeling and post-occupancy evaluations to net-zero projects and LEED training. Here are 13 sessions I'm planning to attend.
| Aug 22, 2013
Energy-efficient glazing technology [AIA Course]
This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.
| Aug 21, 2013
First look: Petersen Automotive Museum's dramatic facelift
One of the world's largest automotive museums unveils plans for a stunning, sculptured metal exterior and cutting-edge interior upgrades.
| Aug 6, 2013
Australia’s first net zero office building features distinctive pixelated façade
Australia's first carbon neutral office building, featuring a distinctive pixelated façade, recently opened in Melbourne.
| Jul 30, 2013
Metl-Span launches Envolution website
Metl-Span® has launched a new website for its recently-announced Envolution™ Architectural Products, the company’s branded line of architectural panels, trim items and accessories.
| Jul 23, 2013
Paul Bertram to speak at ACEEE Summer Study on Energy Efficiency
Paul Bertram, FCSI, CDT, LEED AP and director of environment and sustainability for Kingspan Insulated Panels N.A., will present a white paper during the American Council for an Energy Efficient Economy (ACEEE) 2013 Summer Study on Energy Efficiency in Industry.
High-rise Construction | Jul 9, 2013
5 innovations in high-rise building design
KONE's carbon-fiber hoisting technology and the Broad Group's prefab construction process are among the breakthroughs named 2013 Innovation Award winners by the Council on Tall Buildings and Urban Habitat.
| Jun 28, 2013
Calculating the ROI of building enclosure commissioning
A researcher at Lawrence Berkeley National Laboratory calls building enclosure commissioning “the single-most cost-effective strategy for reducing energy, costs, and greenhouse gas emissions in buildings today.”