A recent renovation of the Kingston (Ontario) Frontenac Public Library Central Branch greatly boosted energy and water efficiency while making the facility healthier and safer. Designed by HDR, the project cut the library’s energy use intensity to 55% of the national benchmark for a library building. It scored 24 of 25 points for optimized energy performance to achieve LEED ID+C v4 Gold Certification.
The complete interior renovation added new mechanical, electrical, and life safety systems. The design preserved the historic structure’s stone and brick exterior, while maximizing daylight. The interior now has a more flexible and adaptable layout and was outfitted with locally available finishes that have a low-carbon footprint.
Low book stacks and interior glazed partitions allow all public spaces on the ground level and the second floor to be filled with natural or borrowed light. Upgraded building systems with new technology and the consolidation of core services allow for extended hours for community use and improved sightlines minimize security concerns.
Situated within the Historic Sydenham Conservation District, the library is considered culturally significant. “Being open to the city, engaging and interactive from the street and within was essential for the library to regain its position as a vital part of the civic experience,” said Susan Croswell, HDR Kingston office principal. “The healthy building impacts with additional light in all public spaces are huge improvements. I think in the end, we were very successful in providing a positive impact to the streetscape as well as to library users. The transformation has provided a building that is more visible and open that can positively change lives by transforming information into inspiration.”
“We’re very proud to further the city’s climate action goals with this renovation,” said Laura Carter, chief librarian and CEO, Kingston Frontenac Public Library. “KFPL is thrilled to have a bright, accessible and sustainable space at the heart of our library system.”
On the building team:
Owner and/or developer: City of Kingston / Kingston Frontenac Public Library (KFPL)
Design architect: HDR
Architect of record: HDR
MEP engineer: WSP
Structural engineer: Cleland Jardine Engineering Ltd.
General contractor: Everstrong Construction Ltd.
Related Stories
| Sep 22, 2014
Sound selections: 12 great choices for ceilings and acoustical walls
From metal mesh panels to concealed-suspension ceilings, here's our roundup of the latest acoustical ceiling and wall products.
| Sep 9, 2014
Using Facebook to transform workplace design
As part of our ongoing studies of how building design influences human behavior in today’s social media-driven world, HOK’s workplace strategists had an idea: Leverage the power of social media to collect data about how people feel about their workplaces and the type of spaces they need to succeed.
| Sep 7, 2014
Behind the scenes of integrated project delivery — successful tools and applications
The underlying variables and tools used to manage collaboration between teams is ultimately the driving for success with IPD, writes CBRE Healthcare's Megan Donham.
| Sep 3, 2014
New designation launched to streamline LEED review process
The LEED Proven Provider designation is designed to minimize the need for additional work during the project review process.
| Sep 2, 2014
Ranked: Top green building sector AEC firms [2014 Giants 300 Report]
AECOM, Gensler, and Turner top BD+C's rankings of the nation's largest green design and construction firms.
| Aug 25, 2014
Ranked: Top cultural facility sector AEC firms [2014 Giants 300 Report]
Arup, Gensler, and Turner head BD+C's rankings of design and construction firms with the most revenue from cultural facility projects, as reported in the 2014 Giants 300 Report.
| Jul 28, 2014
Reconstruction market benefits from improving economy, new technology [2014 Giants 300 Report]
Following years of fairly lackluster demand for commercial property remodeling, reconstruction revenue is improving, according to the 2014 Giants 300 report.
| Jul 28, 2014
Reconstruction Sector Construction Firms [2014 Giants 300 Report]
Structure Tone, Turner, and Gilbane top Building Design+Construction's 2014 ranking of the largest reconstruction contractor and construction management firms in the U.S.
| Jul 28, 2014
Reconstruction Sector Engineering Firms [2014 Giants 300 Report]
Jacobs, URS, and Wiss, Janney, Elstner top Building Design+Construction's 2014 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.
| Jul 28, 2014
Reconstruction Sector Architecture Firms [2014 Giants 300 Report]
Stantec, HDR, and HOK top Building Design+Construction's 2014 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.