A recent renovation of the Kingston (Ontario) Frontenac Public Library Central Branch greatly boosted energy and water efficiency while making the facility healthier and safer. Designed by HDR, the project cut the library’s energy use intensity to 55% of the national benchmark for a library building. It scored 24 of 25 points for optimized energy performance to achieve LEED ID+C v4 Gold Certification.
The complete interior renovation added new mechanical, electrical, and life safety systems. The design preserved the historic structure’s stone and brick exterior, while maximizing daylight. The interior now has a more flexible and adaptable layout and was outfitted with locally available finishes that have a low-carbon footprint.
Low book stacks and interior glazed partitions allow all public spaces on the ground level and the second floor to be filled with natural or borrowed light. Upgraded building systems with new technology and the consolidation of core services allow for extended hours for community use and improved sightlines minimize security concerns.
Situated within the Historic Sydenham Conservation District, the library is considered culturally significant. “Being open to the city, engaging and interactive from the street and within was essential for the library to regain its position as a vital part of the civic experience,” said Susan Croswell, HDR Kingston office principal. “The healthy building impacts with additional light in all public spaces are huge improvements. I think in the end, we were very successful in providing a positive impact to the streetscape as well as to library users. The transformation has provided a building that is more visible and open that can positively change lives by transforming information into inspiration.”
“We’re very proud to further the city’s climate action goals with this renovation,” said Laura Carter, chief librarian and CEO, Kingston Frontenac Public Library. “KFPL is thrilled to have a bright, accessible and sustainable space at the heart of our library system.”
On the building team:
Owner and/or developer: City of Kingston / Kingston Frontenac Public Library (KFPL)
Design architect: HDR
Architect of record: HDR
MEP engineer: WSP
Structural engineer: Cleland Jardine Engineering Ltd.
General contractor: Everstrong Construction Ltd.
Related Stories
| May 19, 2014
What can architects learn from nature’s 3.8 billion years of experience?
In a new report, HOK and Biomimicry 3.8 partnered to study how lessons from the temperate broadleaf forest biome, which houses many of the world’s largest population centers, can inform the design of the built environment.
| May 13, 2014
19 industry groups team to promote resilient planning and building materials
The industry associations, with more than 700,000 members generating almost $1 trillion in GDP, have issued a joint statement on resilience, pushing design and building solutions for disaster mitigation.
| May 11, 2014
Final call for entries: 2014 Giants 300 survey
BD+C's 2014 Giants 300 survey forms are due Wednesday, May 21. Survey results will be published in our July 2014 issue. The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue.
| May 10, 2014
How your firm can gain an edge on university projects
Top administrators from five major universities describe how they are optimizing value on capital expenditures, financing, and design trends—and how their AEC partners can better serve them and other academic clients.
| May 9, 2014
New York Public Library scraps drastic renovation plans
The New York Public Library's controversial renovation, involving the removal of stacks from the Schwarzman building and the closing of the mid-Manhattan branch, has been dropped in favor of a less dramatic plan.
| Apr 29, 2014
USGBC launches real-time green building data dashboard
The online data visualization resource highlights green building data for each state and Washington, D.C.
| Apr 16, 2014
Upgrading windows: repair, refurbish, or retrofit [AIA course]
Building Teams must focus on a number of key decisions in order to arrive at the optimal solution: repair the windows in place, remove and refurbish them, or opt for full replacement.
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Mar 31, 2014
Extreme conversion: Soaring Canadian church transformed into contemporary library
Even before the St. Denys-du-Plateau Church was converted into a library, it was an unusual building, with a towering nave designed to mimic a huge tent inflated by the wind.