A recent renovation of the Kingston (Ontario) Frontenac Public Library Central Branch greatly boosted energy and water efficiency while making the facility healthier and safer. Designed by HDR, the project cut the library’s energy use intensity to 55% of the national benchmark for a library building. It scored 24 of 25 points for optimized energy performance to achieve LEED ID+C v4 Gold Certification.
The complete interior renovation added new mechanical, electrical, and life safety systems. The design preserved the historic structure’s stone and brick exterior, while maximizing daylight. The interior now has a more flexible and adaptable layout and was outfitted with locally available finishes that have a low-carbon footprint.
Low book stacks and interior glazed partitions allow all public spaces on the ground level and the second floor to be filled with natural or borrowed light. Upgraded building systems with new technology and the consolidation of core services allow for extended hours for community use and improved sightlines minimize security concerns.
Situated within the Historic Sydenham Conservation District, the library is considered culturally significant. “Being open to the city, engaging and interactive from the street and within was essential for the library to regain its position as a vital part of the civic experience,” said Susan Croswell, HDR Kingston office principal. “The healthy building impacts with additional light in all public spaces are huge improvements. I think in the end, we were very successful in providing a positive impact to the streetscape as well as to library users. The transformation has provided a building that is more visible and open that can positively change lives by transforming information into inspiration.”
“We’re very proud to further the city’s climate action goals with this renovation,” said Laura Carter, chief librarian and CEO, Kingston Frontenac Public Library. “KFPL is thrilled to have a bright, accessible and sustainable space at the heart of our library system.”
On the building team:
Owner and/or developer: City of Kingston / Kingston Frontenac Public Library (KFPL)
Design architect: HDR
Architect of record: HDR
MEP engineer: WSP
Structural engineer: Cleland Jardine Engineering Ltd.
General contractor: Everstrong Construction Ltd.
Related Stories
Libraries | Jan 26, 2016
Snøhetta designs research library at Temple University
The firm emphasized collaborative spaces, but the library will have room for plenty of books as well.
| Jan 14, 2016
How to succeed with EIFS: exterior insulation and finish systems
This AIA CES Discovery course discusses the six elements of an EIFS wall assembly; common EIFS failures and how to prevent them; and EIFS and sustainability.
Libraries | Aug 27, 2015
Barack Obama Foundation begins search for presidential library architect
Both national and foreign firms will compete for chance to design the Chicago-based Presidential Center.
Libraries | Apr 29, 2015
Designs for earthquake-resistant New Central Library in New Zealand unveiled
The Danish firm Schmidt Hammer Lassen Architects won the competition to design the New Central Library in Christchurch, New Zealand, which will replace the old building damaged by devastating earthquakes in 2010 and 2011.
Cultural Facilities | Apr 7, 2015
Mies’ Martin Luther King Jr. Library to get makeover
The architects say the modernization aims to improve “Mies in a contemporary Miesian way.”
Libraries | Apr 2, 2015
6 award-winning libraries showcase next-gen design strategies
The new Cedar Rapids Public Library and the restored Slover Library in Norfolk, Va., are among six breakthrough projects honored with 2015 AIA/ALA Library Building Awards.
Sponsored | Cladding and Facade Systems | Mar 24, 2015
Designers turn a struggling mall into a hub of learning and recreation
Architects help Nashville government transform a struggling mall into a new community space.
Retail Centers | Mar 10, 2015
Retrofit projects give dying malls new purpose
Approximately one-third of the country’s 1,200 enclosed malls are dead or dying. The good news is that a sizable portion of that building stock is being repurposed.
| Jan 2, 2015
Construction put in place enjoyed healthy gains in 2014
Construction consultant FMI foresees—with some caveats—continuing growth in the office, lodging, and manufacturing sectors. But funding uncertainties raise red flags in education and healthcare.
| Dec 29, 2014
Spherical reflectors help spread daylight throughout a college library in Portland, Ore. [BD+C's 2014 Great Solutions Report]
The 40,000-sf library is equipped with four “cones of light,” spherical reflectors made from extruded aluminum that distribute daylight from the library’s third floor to illuminate the second. The innovation was named a 2014 Great Solution by the editors of Building Design+Construction.