flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Kawneer curtain walls create the perfect learning environment

Sponsored Content

Kawneer curtain walls create the perfect learning environment


By Kawneer | May 23, 2022
Versoleil SunShade - Outrigger System - for Curtain Wall

With an ever-growing student body, Fayetteville High School in Arkansas decided to expand its capacity while creating a new, improved environment using Kawneer curtain walls to help students fulfill their potential. Three renowned architectural firms came together to design and build an impressive 530,000-square-foot campus capable of housing 3,000 students. It comprises two massive building blocks with a new arena, performing arts center, auditorium, music and athletic spaces, student commons, food service and administrative offices.
Despite being able to accommodate a large student population, the school was planned around the principle of multiple, independent small learning communities (SLCs) with 700 students. Each community has access to various rooms such as flexible multimedia labs, woodworking shops, robotics labs and bleacher-like grand staircases that transform into mini-auditoriums or leisure areas.
Fayetteville High School benefits from an abundance of daylight and delivers innovative learning areas that compel the next generation to envision solutions for today’s and tomorrow’s challenges.


Design highlights

The new school was built upon the foundations of the original building as a tribute to the institution's heritage and to retain its desirable location. The facility also managed to create a new connection to the local landscape by creating a natural link between the building and the outside area. 


Kawneer provides reliability with versatile features

The school’s interior is illuminated by 28,000-square-feet of curtain wall and 14,000-square-feet of storefront glass, delivering an unobstructed, breezy design that provides a healthy environment for students and teachers.
Kawneer’s 1600 Wall System®1 Curtain Wall was installed with four rows of Versoleil® SunShade and Trifab® VersaGlaze® 451T Stick Framing System. 

Curtain Wall

The main entrance was repositioned to create a more inviting, visible entry into the high school, and the open floor plan allows more daylight to come inside, creating a brighter and more inspirational atmosphere throughout the renovated building. Another prominent design feature is the large southward-facing windows overlooking a landscaped student commons area, which create a collegiate campus feel reflective of the school’s ties to the University of Arkansas. Other sustainable features - including the use of recycled building materials and energy-efficient environmental-control systems - contributed to LEED Gold® certification of the building.

350 Medium and 500 Wild Stile Standard Entrances

The architects strategically installed skylights and vertical windows within the deep floor plates, flooding the windowless internal areas with daylight. 


The challenge

The architects faced many challenges throughout the building’s construction. The whole project took four years to be completed and was done while the school was operating. Additionally, the project involved construction, demolitions and renovations, demanding several building techniques and machinery used in many structures around the campus.


The solution

The modernization was completed in a phased approach to minimize disruptions to the school's routine. Most demolitions were carried out during the summer break to keep teachers and students safe. 
Despite being seamlessly integrated with the surroundings, the new school has a distinctive identity that is welcoming and modern at the same time. 

Find out more at Kawneer.com.

 

PROJECT INFORMATION:
Building
: Fayetteville High School
Location: Arkansas
Architects:
Hight Jackson Associates, Rogers, AR
Marlon Blackwell Architects, Fayetteville, AR
DLR Group, Overland Park, KS
General Contractor: Nabholz Construction Corp., Rogers, AR
Glazing Contractor: ACE Glass Construction, Little Rock, AR


PRODUCTS USED:

  • 1600 Wall System®1 Curtain Wall
  • 350 Medium Stile Standard Entrance
  • Trifab® VersaGlaze® 451T Stick Framing System
  • Trifab® VersaGlaze® 451T SS Framing System
  • 1010 Sliding Mall Front
  • Versoleil® SunShade - Outrigger System - for Curtain Wall 

Related Stories

| Nov 2, 2010

11 Tips for Breathing New Life into Old Office Spaces

A slowdown in new construction has firms focusing on office reconstruction and interior renovations. Three experts from Hixson Architecture Engineering Interiors offer 11 tips for office renovation success. Tip #1: Check the landscaping.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 12, 2010

Holton Career and Resource Center, Durham, N.C.

27th Annual Reconstruction Awards—Special Recognition. Early in the current decade, violence within the community of Northeast Central Durham, N.C., escalated to the point where school safety officers at Holton Junior High School feared for their own safety. The school eventually closed and the property sat vacant for five years.

| Oct 12, 2010

Guardian Building, Detroit, Mich.

27th Annual Reconstruction Awards—Special Recognition. The relocation and consolidation of hundreds of employees from seven departments of Wayne County, Mich., into the historic Guardian Building in downtown Detroit is a refreshing tale of smart government planning and clever financial management that will benefit taxpayers in the economically distressed region for years to come.

| Oct 12, 2010

Owen Hall, Michigan State University, East Lansing, Mich.

27th Annual Reconstruction Awards—Silver Award. Officials at Michigan State University’s East Lansing Campus were concerned that Owen Hall, a mid-20th-century residence facility, was no longer attracting much interest from its target audience, graduate and international students.

| Sep 13, 2010

Second Time Around

A Building Team preserves the historic facade of a Broadway theater en route to creating the first green playhouse on the Great White Way.

| Aug 11, 2010

Using physical mockups to identify curtain wall design flaws

Part two of a five-part series on diagnosing and avoiding cladding, glazing, and roofing failures from building forensics expert IBA Consultants.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021