flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Kawneer curtain walls create the perfect learning environment

Sponsored Content

Kawneer curtain walls create the perfect learning environment


By Kawneer | May 23, 2022
Versoleil SunShade - Outrigger System - for Curtain Wall

With an ever-growing student body, Fayetteville High School in Arkansas decided to expand its capacity while creating a new, improved environment using Kawneer curtain walls to help students fulfill their potential. Three renowned architectural firms came together to design and build an impressive 530,000-square-foot campus capable of housing 3,000 students. It comprises two massive building blocks with a new arena, performing arts center, auditorium, music and athletic spaces, student commons, food service and administrative offices.
Despite being able to accommodate a large student population, the school was planned around the principle of multiple, independent small learning communities (SLCs) with 700 students. Each community has access to various rooms such as flexible multimedia labs, woodworking shops, robotics labs and bleacher-like grand staircases that transform into mini-auditoriums or leisure areas.
Fayetteville High School benefits from an abundance of daylight and delivers innovative learning areas that compel the next generation to envision solutions for today’s and tomorrow’s challenges.


Design highlights

The new school was built upon the foundations of the original building as a tribute to the institution's heritage and to retain its desirable location. The facility also managed to create a new connection to the local landscape by creating a natural link between the building and the outside area. 


Kawneer provides reliability with versatile features

The school’s interior is illuminated by 28,000-square-feet of curtain wall and 14,000-square-feet of storefront glass, delivering an unobstructed, breezy design that provides a healthy environment for students and teachers.
Kawneer’s 1600 Wall System®1 Curtain Wall was installed with four rows of Versoleil® SunShade and Trifab® VersaGlaze® 451T Stick Framing System. 

Curtain Wall

The main entrance was repositioned to create a more inviting, visible entry into the high school, and the open floor plan allows more daylight to come inside, creating a brighter and more inspirational atmosphere throughout the renovated building. Another prominent design feature is the large southward-facing windows overlooking a landscaped student commons area, which create a collegiate campus feel reflective of the school’s ties to the University of Arkansas. Other sustainable features - including the use of recycled building materials and energy-efficient environmental-control systems - contributed to LEED Gold® certification of the building.

350 Medium and 500 Wild Stile Standard Entrances

The architects strategically installed skylights and vertical windows within the deep floor plates, flooding the windowless internal areas with daylight. 


The challenge

The architects faced many challenges throughout the building’s construction. The whole project took four years to be completed and was done while the school was operating. Additionally, the project involved construction, demolitions and renovations, demanding several building techniques and machinery used in many structures around the campus.


The solution

The modernization was completed in a phased approach to minimize disruptions to the school's routine. Most demolitions were carried out during the summer break to keep teachers and students safe. 
Despite being seamlessly integrated with the surroundings, the new school has a distinctive identity that is welcoming and modern at the same time. 

Find out more at Kawneer.com.

 

PROJECT INFORMATION:
Building
: Fayetteville High School
Location: Arkansas
Architects:
Hight Jackson Associates, Rogers, AR
Marlon Blackwell Architects, Fayetteville, AR
DLR Group, Overland Park, KS
General Contractor: Nabholz Construction Corp., Rogers, AR
Glazing Contractor: ACE Glass Construction, Little Rock, AR


PRODUCTS USED:

  • 1600 Wall System®1 Curtain Wall
  • 350 Medium Stile Standard Entrance
  • Trifab® VersaGlaze® 451T Stick Framing System
  • Trifab® VersaGlaze® 451T SS Framing System
  • 1010 Sliding Mall Front
  • Versoleil® SunShade - Outrigger System - for Curtain Wall 

Related Stories

| Jul 13, 2012

July 2012: Products at Work

Panel wall system, folding windows, rubber flooring, wire mesh railings.

| Jun 8, 2012

Allsteel names Kris Yates to head architectural products group

Yates is responsible for the start up, launch and ongoing sales and marketing of Allsteel’s new Beyond movable walls.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 31, 2012

Product Solutions June 2012

Curing agents; commercial faucets; wall-cladding systems.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| Apr 4, 2012

Educational facilities see long-term benefits of fiber cement cladding

Illumination panels made for a trouble-free, quick installation at a cost-effective price.

| Dec 7, 2011

NSF International qualifies first wallcoverings distributor to the New American National Standard for Sustainable Wallcoverings

TRI-KES demonstrates leadership in environmental stewardship as the first distributor to earn qualification.

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021