flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

JetBlue opens Gensler-designed International Concourse at JFK

JetBlue opens Gensler-designed International Concourse at JFK

Gensler designed the terminal with a particular focus on passenger well-being. 


By Gensler | November 14, 2014

This morning, JetBlue welcomed the first international arrivals at its new, Gensler-designed International Concourse extension to Terminal 5 (T5) at John F. Kennedy (JFK) International Airport.

The International Concourse will offer customers a modern environment with an emphasis on well-being that simplifies the travel experience. The addition is a seamless extension of Gensler’s award-winning design for T5 (which opened in 2008), and was built in collaboration with Arup, Turner Construction, and The Port Authority of New York and New Jersey.

The 175,000-sf extension includes the conversion of three existing gates to international swing gates, and the addition of three new international swing gates. Further, the International Concourse will include a new security re-check, an immigration hall designed to process 1,400 passengers per hour with the addition of 40 automated passport control kiosks and two new baggage claims.

“Our new International Arrivals Concourse perfectly mirrors T5’s bright and friendly look and feel. Our home terminal, T5, is JetBlue’s unique way to properly welcome people to New York. Thanks to our partners at Gensler, T5i is designed with sustainable considerations including technologies that will help reduce the building’s environmental impact,” said Dave Barger, CEO, JetBlue.

Gensler designed the terminal with a particular focus on passenger well-being. Passengers will have access to views of the city and natural light in unexpected places, including the Primary Hall and corridor through which they must pass upon arriving in the United States. Alighting from this corridor into the Immigration Hall for customs processing, customers will be surprised by 360-degree views to the outside.

A forthcoming outdoor rooftop park, slated to open in spring 2015, will offer all passengers at T5 the ability to stroll outside while enjoying spectacular views of the Manhattan skyline as well as the historic adjacent TWA Terminal.

“We designed the international concourse to welcome people to the US and specifically to New York, greeting them with natural daylight and a view outside. We think travelers awaiting their departing flights will particularly enjoy the ability to take a walk through a rooftop park with great views of the city,” said Gensler Architect and Senior Associate Ty Osbaugh.

 

 

Guided by JetBlue’s mission to bring humanity back to air travel, Gensler’s design includes many customer-friendly design elements for which T5 is known:

  • Sustainable design focused on well-being and improved indoor air quality features water bottle refilling stations throughout the terminal, low-VOC materials, and abundant natural daylight;

  • The modern, timeless, and clean design features splashes of bold color in keeping with the JetBlue brand;

  • Both lounge-like and traditional seating at gates, with access to ample electrical outlets;

  • Features that travelers love in T5 will continue in the new addition: there is free Wi-Fi throughout, customer service zones are located in every concourse and there will be food ordering capability at the gates.

 

 

 

Related Stories

Airports | Jul 18, 2022

FAA will award nearly $1 billion for airport projects

The Federal Aviation Administration (FAA) will award nearly $1 billion to 85 airports of all sizes across the country to improve terminals.

Airports | Jul 8, 2022

Phoenix Sky Harbor Airport’s new terminal prioritizes passenger experience and sustainability

McCarthy Building Companies recently completed construction of the final concourse in Terminal 4 at Phoenix Sky Harbor International Airport.

Airports | Jul 7, 2022

Love at first flight: The power of first impressions in airports

As architects, how we design a terminal and choreograph the passenger experience can stir up strong feelings.

Airports | Jun 29, 2022

BIG and HOK’s winning design for Zurich airport’s new terminal

Two years ago, Zurich Airport, which opened in the 1950s, launched an international design competition to replace the aging Dock A—the airport’s largest dock.

Airports | Jun 2, 2022

SOM-designed International Arrival Facility at Seattle’s Sea–Tac airport features the world’s largest aerial walkway

The Skidmore, Owings & Merrill (SOM)-designed International Arrivals Facility (IAF) at Seattle-Tacoma International Airport has opened, replacing a 50-year-old arrival facility.   

Sponsored | BD+C University Course | May 3, 2022

For glass openings, how big is too big?

Advances in glazing materials and glass building systems offer a seemingly unlimited horizon for not only glass performance, but also for the size and extent of these light, transparent forms. Both for enclosures and for indoor environments, novel products and assemblies allow for more glass and less opaque structure—often in places that previously limited their use.

Airports | Apr 4, 2022

Dominican Republic airport expansion will add mixed-use features

The recently revealed design concept for the expansion of Santiago International Airport in the Dominican Republic includes a transformation of the current building into a mixed-use space that features an office park, business center, and hotel.

Codes and Standards | Mar 4, 2022

FAA offers $1 billion in grants for airport terminal and tower projects

The Federal Aviation Administration (FAA) is now accepting applications for about $1 billion in grants for airport projects during fiscal year 2022.

Resiliency | Feb 15, 2022

Design strategies for resilient buildings

LEO A DALY's National Director of Engineering Kim Cowman takes a building-level look at resilient design. 

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021