flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

JCJ Architecture designs New York City's first casino

JCJ Architecture designs New York City's first casino

Aqueduct Racetrack complex transformed into modern entertainment destination.


By By BD+C Staff | April 4, 2012
The complex, located within the Aqueduct Racetrack complex, will contribute appr
The complex, located within the Aqueduct Racetrack complex, will contribute approximately $350 million annually to the State of

JCJ Architecture completed the first phase of the 1,086,000-sf Resorts World Casino New York City in Queens, N.Y., the largest entertainment center in New York City's metro area and the city's only casino. Developed and operated by Malaysian-based Genting Group, the project is the first company-owned U.S. venture for the leading global leisure and hospitality corporation.

The complex, located within the Aqueduct Racetrack complex, will contribute approximately $350 million annually to the State of New York to support education while offering locals and tourists alike world-class gaming, dining and entertainment options.

Adding 1,200 new construction jobs with a total construction cost of $510 million, the three-level complex required extensive site redevelopment and improvements on 64 acres, renovation of existing facilities, and new construction totaling approximately 736,000-sf.

JCJ Architecture served as architect and interior design firm for the project. The project team included professionals from across JCJ's network of offices, led by senior executives from JCJ including Bill Dow, Brian Davis, Scott Celella, Alexandra Lopatynsky, Jeff Wynkoop and Peter Fabian.  Tutor Perini served as construction manager. BD+C

Related Stories

| May 7, 2012

2012 BUILDING TEAM AWARDS: Audie L. Murphy VA Hospital

How a Building Team created a high-tech rehabilitation center for wounded veterans of the conflicts in Iraq and Afghanistan.

| May 3, 2012

2012 BUILDING TEAM AWARDS: Rush University Medical Center

This fully integrated Building Team opted for a multi-prime contracting strategy to keep construction going on Chicago’s Rush University Medical Center, despite the economic meltdown.

| May 3, 2012

U of Michigan team looking to create highly efficient building envelope designs

The system combines the use of sensors, novel construction materials, and utility control software in an effort to create technology capable of reducing a building’s carbon footprint.

| May 3, 2012

Best commercial modular buildings and marketing programs recognized

Judges scored entries on architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete.

| May 3, 2012

Zero Energy Research Lab opens at North Texas

The living lab—the only one of its kind in Texas—is designed to test various technologies and systems in order to achieve a net-zero consumption of energy.

| May 3, 2012

NSF publishes ANSI standard evaluating the sustainability of single ply roofing membranes

New NSF Standard provides manufacturers, specifiers and building industry with verifiable, objective criteria to identify sustainable roofing products.

| May 3, 2012

Gilbane to provide CM services for North Reading’s integrated middle/high school

The project scope includes a wastewater treatment plant, demolition of the existing high school and extensive athletic fieldwork.

| May 3, 2012

Howard S. Turner 1911–2012

A founding member of the Turner Construction Co.

| May 3, 2012

Ground broken for $94 million hospital expansion at Scripps Encinitas

New facility to more than double emergency department size, boost inpatient beds by 43%.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021