flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Ground broken on first LEED Platinum designed school house built by volunteers

Ground broken on first LEED Platinum designed school house built by volunteers

Phoenix public school receives the generous gift of a state-of-the-art building for student and community use.


By By BD+C Staff | December 1, 2011
The 6,000-sf project in Phoenix will be the launching pad of state-of-the-art green schoolhouses across the country on Title 1,
This article first appeared in the December 2011 issue of BD+C.

Bringing together the community, school districts, corporations and volunteers, The Green Schoolhouse Series, in collaboration with Cause and Effect Evolutions and Washington Elementary School District break ground on the world’s first LEED Platinum designed schoolhouse built by volunteers, on the campus of Roadrunner Elementary School in Phoenix, Ariz.

The 6,000-sf project in Phoenix will be the launching pad of state-of-the-art green schoolhouses across the country on Title 1, low income, public school campuses.

The schoolhouse at Roadrunner, named Safari, will be a teaching tool, educating the students and community members on the importance of sustainable living and building practices. Safari’s sustainable features include a solar rooftop system, STEM-devoted (Science, Technology, Engineering and Math) classroom, rainwater harvesting capabilities, interactive white boards, an outdoor classroom and native gardens.

The award-winning state-of-the-art building is designed by the acclaimed Phoenix architecture firm Stantec, with construction being done by Hensel Phelps and engineering services provided by Heideman Associates, a Zak Co.

Features of the schoolhouse include:

  • Rainwater harvesting system, provided by Brae
  • Solar roof system, provided by Empire Renewable Energy
  • Native green garden, provided by Blue Cross Blue Shield of Arizona
  • Eco-friendly windows, provided by Pella Corp.
  • STEM classroom, made possible by DeVry University
  • Schoolhouse kitchen, made possible by Kraft Foods and IGA
  • Energy efficient fans, provided by Rite-Hite Fans
  • State-of-the-art water bottle refilling stations provided by Elkay
  • No VOC paint, provided by Glidden. BD+C

Related Stories

| Aug 11, 2010

Burt Hill, HOK top BD+C's ranking of the nation's 100 largest university design firms

A ranking of the Top 100 University Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

PBK, DLR Group among nation's largest K-12 school design firms, according to BD+C's Giants 300 report

A ranking of the Top 75 K-12 School Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Turner Building Cost Index dips nearly 4% in second quarter 2009

Turner Construction Company announced that the second quarter 2009 Turner Building Cost Index, which measures nonresidential building construction costs in the U.S., has decreased 3.35% from the first quarter 2009 and is 8.92% lower than its peak in the second quarter of 2008. The Turner Building Cost Index number for second quarter 2009 is 837.

| Aug 11, 2010

AGC unveils comprehensive plan to revive the construction industry

The Associated General Contractors of America unveiled a new plan today designed to revive the nation’s construction industry. The plan, “Build Now for the Future: A Blueprint for Economic Growth,” is designed to reverse predictions that construction activity will continue to shrink through 2010, crippling broader economic growth.

| Aug 11, 2010

New AIA report on embassies: integrate security and design excellence

The American Institute of Architects (AIA) released a new report to help the State Department design and build 21st Century embassies.

| Aug 11, 2010

Section Eight Design wins 2009 Open Architecture Challenge for classroom design

Victor, Idaho-based Section Eight Design beat out seven other finalists to win the 2009 Open Architecture Challenge: Classroom, spearheaded by the Open Architecture Network. Section Eight partnered with Teton Valley Community School (TVCS) in Victor to design the classroom of the future. Currently based out of a remodeled house, students at Teton Valley Community School are now one step closer to getting a real classroom.

boombox1 - default
boombox2 -
native1 -

More In Category

Mass Timber

Charlotte's new multifamily mid-rise will feature exposed mass timber

Construction recently kicked off for Oxbow, a multifamily community in Charlotte’s The Mill District. The $97.8 million project, consisting of 389 rental units and 14,300 sf of commercial space, sits on 4.3 acres that formerly housed four commercial buildings. The street-level retail is designed for boutiques, coffee shops, and other neighborhood services.


Construction Costs

New download: BD+C's May 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021