flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Frank Gehry’s Grand Avenue Project in Los Angeles may finally be ready to break ground

Mixed-Use

Frank Gehry’s Grand Avenue Project in Los Angeles may finally be ready to break ground

The oft-delayed project was set to begin in 2007 but was halted due to the recession.


By David Malone, Associate Editor | January 18, 2017

Rendering courtesy of Related Companies

Thanks to a cash infusion of $290 million from Chinese Communications Construction Group (CCCG), the Frank Gehry-designed Grand Avenue Project may finally have a start date in sight.

The project, which has been more than a decade in the making, will be built on a parking lot just east of the Walt Disney Concert Hall, Curbed Los Angeles reports. Included in the Grand Avenue Project will be a 305-room four-star Equinox hotel, 215,000 sf of retail space, and a 39-story residential tower with 429 units. Underneath the development will be six levels of parking with room for 1,500 cars.

The retail space will comprise restaurants, shopping, and a movie theater complex spread across a series of landscaped open terraces. The 429 residential units will consist of 128 condominiums and 301 apartments. 86 of these apartments will be deemed affordable for qualified low-income residents. According to Curbed LA, the Los Angeles County Board of Supervisors says people earning between $24,320 and $43,400 per year will qualify for the affordable units.

The Grand Avenue Project, after the $290 million from CCCG, has now raised $400 million of the estimated $1 billion price tag for the development. Considering real estate developers typically borrow 70% or more of the funds they need to start building, the $400 million already raised bodes well for the project, the Los Angeles Times reports.

The project, which is being developed by Related Companies, is set to finally begin construction in 2018. When completed, it is estimated the development will employ about 3,300 people.

Tags

Related Stories

Mixed-Use | Mar 13, 2015

Dubai announces mega waterfront development Aladdin City

Planned on 4,000 acres in the Dubai Creek area, the towers will be covered in gold lattice and connected via air-conditioned bridges.

High-rise Construction | Mar 11, 2015

Must see: Firm proposes skyscraper with a ‘twist’ in downtown Tulsa

Tulsa, Okla.-based architecture practice Kinslow, Keith & Todd released renderings of a skyscraper concept that takes the shape of a tornado.

Modular Building | Mar 10, 2015

Must see: 57-story modular skyscraper was completed in 19 days

After erecting the mega prefab tower in Changsha, China, modular builder BSB stated, “three floors in a day is China’s new normal.”

Transit Facilities | Mar 4, 2015

5+design looks to mountains for Chinese transport hub design

The complex, Diamond Hill, will feature sloping rooflines and a mountain-like silhouette inspired by traditional Chinese landscape paintings.

Sponsored | | Mar 3, 2015

New York’s Fulton Center relies on TGP for light-flooded, underground transit hub

Fire-rated curtain wall systems filled this subterranean hub with natural light.

Sponsored | Shopping Centers | Feb 26, 2015

A color-changing gateway for Altara Center

Valspar works with developers to complete a multicolored shopping center façade in Honduras.

Industrial Facilities | Feb 24, 2015

Starchitecture meets agriculture: OMA unveils design for Kentucky community farming facility

The $460 million Food Port project will define a new model for the relationship between consumer and producer.

Office Buildings | Feb 18, 2015

Commercial real estate developers optimistic, but concerned about taxes, jobs outlook

The outlook for the commercial real estate industry remains strong despite growing concerns over sluggish job creation and higher taxes, according to a new survey of commercial real estate professionals by NAIOP.

Mixed-Use | Feb 13, 2015

First Look: Sacramento Planning Commission approves mixed-use tower by the new Kings arena

The project, named Downtown Plaza Tower, will have 16 stories and will include a public lobby, retail and office space, 250 hotel rooms, and residences at the top of the tower. 

Mixed-Use | Feb 11, 2015

Developer plans to turn Eero Saarinen's Bell Labs HQ into New Urbanist town center

Designed by Eero Saarinen in the late 1950s, the two-million-sf, steel-and-glass building was one of the best-funded and successful corporate research laboratories in the world.

boombox1 - default
boombox2 -
native1 -

More In Category


MFPRO+ Special Reports

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021