flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Five finalists revealed for NY Port Authority Bus Terminal redesign project

Transit Facilities

Five finalists revealed for NY Port Authority Bus Terminal redesign project

The public will now judge the five proposals by providing comments and feedback.


By David Malone, Associate Editor | September 30, 2016

Rendering courtesy Pelli Clarke Pelli Architects

The 66-year-old Port Authority Bus Terminal is deteriorating and in desperate need of an update. And, thanks to an international design and deliverability contest from the Port Authority, there are now five designs that may one day stand as the new terminal.

Arcadis of New York, Inc., Archilier Architecture Consortium, Hudson Terminal Center Collaborative, Pelli Clarke Pelli Architects, and Perkins Eastman are the five firms battling for the design opportunity. The projects are all very unique from one another, but have one trait in common: the price tag.

The least expensive proposal is $3.7 billion (Pelli Clarke Pelli Architects), while the most expensive is a whopping $15.3 billion (Hudson Terminal Center Collaborative). The competition website makes sure to note that these are Rough Order of Magnitude Cost Estimates that do not reflect total project costs and do not include insurance, financing, legal fees, regulatory approvals, administrative fees, finance costs, land acquisition, comprehensive engineering costs, or professional fees.

While the public is urged to leave comments and feedback about the projects on the design competition website, a jury of industry professionals is also involved. The comments provided by the public will be made available to the competition jury and the agency’s Board of Commissioners.

The video proposals from each of these firms can be viewed below.

 

Arcadis of New York, Inc. - $4.2 billion

 

Archilier Architecture Consortium - $7 billion

 

Hudson Terminal Center Collaborative - $15.3 billion

 

Pellie Clarke Pelli Architects - $3.7 billion

 

Perkins Eastman - $5.4 billion

 

To view more information on each project or on the contest as a whole, click here.

 

Related Stories

Giants 400 | Jan 29, 2016

TRANSIT SECTOR GIANTS: Perkins+Will, Skanska among top transit/TOD facility AEC firms

BD+C's rankings of the nation's largest transit/TOD sector design and construction firms, as reported in the 2015 Giants 300 Report 

Transit Facilities | Jan 18, 2016

Pennsylvania Station set to transform into a world-class transportation hub

Governor Andrew Cuomo presented plans to turn Pennsylvania Station and the neighboring James A. Farley Post Office into a free flowing 21st century work of art.

| Jan 14, 2016

How to succeed with EIFS: exterior insulation and finish systems

This AIA CES Discovery course discusses the six elements of an EIFS wall assembly; common EIFS failures and how to prevent them; and EIFS and sustainability.

Transit Facilities | Sep 15, 2015

Grimshaw and Arup unveil proposal for London high-speed train station

Renderings that have been released show a glazed façade and a new entrance that will create a “light and airy destination with shops, restaurants, and cafes.”

Transit Facilities | Sep 10, 2015

New London Underground plan from NBBJ consists of moving walkway

For once, walking can be faster than taking a train.

Transit Facilities | Jul 30, 2015

Snøhetta designs ring-shaped cable car station in Italian Alps

In Snøhetta’s design, two cylindrical rings embedded into the existing topography, each at different elevations, will be connected by a cable car. During the minute-long cable car journey, passengers can enjoy views of the city and of the Italian Alps.

Sponsored | Transit Facilities | Jun 15, 2015

Success through teamwork for landmark California project

The Anaheim Regional Transportation Intermodal Center (ARTIC) is the Grand Central Station of the future

Transit Facilities | Jun 9, 2015

BIG releases golden-roof plan for transport hub in Swedish city

“Like a continuous thin sheet, the roof is gently lifted at its four corners, wrapping the city's vehicular infrastructure in multiple layers of public program and urban spaces,” said Ingels.

Glass and Glazing | Jun 4, 2015

Construction of record breaking glass-bottom bridge nearly complete in China

Designed by Israeli architect Haim Dotan, the white bridge is meant to look as if it is “disappearing into the clouds.”

Fire and Life Safety | May 27, 2015

7 bold applications and innovations for fire and life safety

BD+C’s roundup features colorful sprinklers for offices, hotels, museums; a fire-rated curtain wall at a transit hub in Manhattan; a combination CO/smoke detector; and more.

boombox1 - default
boombox2 -
native1 -

More In Category

Transit Facilities

Top 25 Transit Facility Construction Firms for 2023

The Walsh Group, Clark Group, Hensel Phelps, Skanska USA, and Hill International top BD+C's ranking of the nation's largest transit facility general contractors and construction management (CM) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes construction revenue for work related to bus terminals, rail terminals, and transit stations.


Transit Facilities

Top 40 Transit Facility Engineering Firms for 2023

AECOM, Jacobs, EXP, WSP, and Arup head BD+C's ranking of the nation's largest transit facility engineering and engineering/architecture (EA) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes design revenue for work related to bus terminals, rail terminals, and transit stations.


Transit Facilities

Top 40 Transit Facility Architecture Firms for 2023

Perkins&Will, HDR, Gensler, Skidmore, Owings & Merrill, and HNTB top BD+C's ranking of the nation's largest transit facility architecture and architecture engineering (AE) firms for 2023, as reported in the 2023 Giants 400 Report. Note: This ranking includes design revenue for work related to bus terminals, rail terminals, and transit stations.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021