flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Fan of the High Line? Check out NYC's next public park plan (hint: it floats)

Fan of the High Line? Check out NYC's next public park plan (hint: it floats)

Backed by billionaire Barry Diller, the $170 million "floating park" is planned for the Hudson River, and will contain wooded areas and three performance venues.


By BD+C Staff | November 18, 2014

When people are looking for public space in New York City, they often look to the waterways. Of the many ideas in this vein, a new one is more ambitious than usual: an offshore park proposed for the Hudson River off of 14th Street.

Initial pricing puts the project, called Pier 55, at $170 million, and the proposal states that it would be located 186 feet from land and contain wooded areas and three performance venues, 6sqft reports.

Barry Diller, the billionaire Chairman of IAC, is sponsoring the plan. In fact, he initiated the design competition that produced this proposal. Thomas Heatherwick of Heatherwick Studio is responsible for the current plan for proposed park. 

Diller has promised $130 million from the Diller-von Furstenberg Family Foundation, in addition to taking managerial responsibilities for the outdoor space and operating costs for the first 20 years. A veteran supporter of public projects, Diller was also the single largest donor to the High Line. The rest of the necessary funds, about $39.5 million, are to come from the city, state, and the Hudson River Park Trust.

Before the plan can go forward, the board of the Hudson River Park Trust, the Army Corps of Engineers, and the New York Department of Environmental Conservation must approve Pier 55.

Heatherwick's winning proposal for the park is based on 300 mushroom-shaped concrete columns, forming a parallelogram shape when combined. These columns would vary in height, making the park closer to the water in some places. This design allows sunlight to enter beneath the park, which is vital for the marine sanctuary in this area of the river. 

The largest of the three proposed performance spaces would hold 1,000 people in the seats and 2,500 more on the lawn. The other two spaces would be an 800-seat amphitheater and a small stage with 250 seats.

Renderings courtesy Heatherwick Studios.

 

Related Stories

Cultural Facilities | Dec 4, 2019

Snøhetta wins competition to design maritime center in Esbjerg, Denmark

The project’s design was developed with WERK Arkitekter.

Cultural Facilities | Dec 1, 2019

Small-venue theaters play starring cultural and economic roles in New York City’s economy

A new study identifies the challenges these theaters face, and offers possible solutions that include more city support.

Cultural Facilities | Nov 11, 2019

‘The Whale’ will be an arctic attraction 185 miles north of the Arctic Circle

Dorte Mandrup won an international competition to design the project.

Cultural Facilities | Oct 29, 2019

A watchtower in Harlem, once a firefighter’s lookout, is restored as a landmark

The nearly $8 million project required major structural interventions.

Giants 400 | Oct 3, 2019

Top 65 Cultural Sector Construction Firms for 2019

Whiting-Turner, Turner, PCL, Clark Group, and Gilbane top the rankings of the nation's largest cultural facility sector contractors and construction management firms, as reported in Building Design+Construction's 2019 Giants 300 Report.

Giants 400 | Oct 3, 2019

Top 70 Cultural Sector Engineering Firms for 2019

Jacobs, Arup, EXP, BRPH, and Thornton Tomasetti head the rankings of the nation's largest cultural facility sector engineering and engineering architecture (EA) firms, as reported in Building Design+Construction's 2019 Giants 300 Report.

Giants 400 | Oct 3, 2019

Top 110 Cultural Sector Architecture Firms for 2019

Gensler, Populous, DLR Group, Stantec, and Perkins and Will top the rankings of the nation's largest cultural facility sector architecture and architecture engineering (AE) firms, as reported in Building Design+Construction's 2019 Giants 300 Report.

Giants 400 | Oct 3, 2019

2019 Cultural Facility Giants Report: New libraries are all about community

The future of libraries is less about being quiet and more about hands-on learning and face-to-face interactions. This and more cultural sector trends from BD+C's 2019 Giants 300 Report.

Cultural Facilities | Sep 11, 2019

The Kennedy Center expands for the first time since its 1971 debut

The REACH, with three pavilions on a generous lawn, adds openness and light to this performance space.

boombox1 - default
boombox2 -
native1 -

More In Category

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021