flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Top 106 multifamily housing kitchen and bath amenities – get the full report (FREE!)

Multifamily Housing

Top 106 multifamily housing kitchen and bath amenities – get the full report (FREE!)

Exclusive research study spells out the 106 K+B products, features, and styles multifamily housing developers and AEC teams have used in recent projects or intend to use in the future.


By Robert Cassidy, Editor, Multifamily Design+Construction | December 13, 2022
Top 106 multifamily housing kitchen and bath amenities research
The exclusive report (FREE with short registration) covers more than 100 K+B products, styles, and features that multifamily teams have used recently or intend to use in the future, and K+B products they've installed for the first time.

Our inaugural “Multifamily Kitchen+Bath Amenities Survey” of multifamily developers, architects, contractors, and other professionals provides exclusive data – 111 charts and tables – on the state of K+B amenity usage in multifamily housing. 

CLICK HERE FOR FREE REPORT (SHORT REGISTRATION REQUIRED)

Among the key findings:

Some products stand out as evergreens, based on their high response rates: dishwashers (used by 97% of respondents, including 89% “extensively”); Energy Star appliances (95% usage, including 83% “extensively”); and installed microwave ovens (used by 94%, including 84% “extensively”).

• Project teams had favorite K+B amenities that they use consistently in their work – but they were open to trying many new products, such as induction cooktops, for the first time as well.

• All 106 K+B products or specifications were employed by at least some respondents, although the adoption rate for some of these products or specification types was sometimes in the low single digits.

• Supply chain problems, notably for appliances and cabinets, had impacted project delivery.

• Some project teams installed specific K+B products for the first time; others said they intend to use various K+B products, like air filtration systems, that they had never used before in future projects.

Here's an example of one of the 106 K+B amenities featured in the report:

K+B countertops used by respondents

Participants in the survey included architects (45%), developers/property owners/property managers (25%), contractors (16%), interior designers (9%), product manufacturers (3%), and engineers (2%). They developed, designed, and constructed apartments (91%), senior living (54%), townhomes (51%), condominiums (39%), and student housing (33%).

REFRIGERATORS, CABINETS IN SHORT SUPPLY

 

K+B difficult-to-source products
Appliances came up more often than any other product. “We’ve been purchasing them early and storing [them] in our own warehouses or changing our spec to purchase models that are in stock,” said a respondent.

One respondent described the supply chain mess this way: “As developers are attempting to nail down pricing early in the Design Phase … combined with logistic nightmares, getting the design team ahead of the curve and in line with the general contractor and pricing exercises is crucial.”

Appliances came up more often than any other product category. “We’ve been purchasing them early and storing [them] in our own warehouses or changing our spec to purchase models that are in stock/available,” said one respondent.

“It’s been difficult getting appliance packages with the same manufacturer,” said another respondent. “We’re needing to mix manufacturers and appliances.”

Refrigerators were the main culprit cited by respondents. “We’re finding whatever spec is available,” said one. “Need to order well in advance and be flexible,” advised another.

Cabinets were also headache cited by several respondents. “Unfortunately, [we’re] playing the waiting game,” moaned a cabinetless respondent. Another firm said it was using pantry cabinets in bathrooms instead of medicine cabinets.

One pleaded, “[We’re] trying to get locally sourced cabinets, made in the USA.”

The last word on “solving” the K+B amenity shortage problem: “Order way in advance,” advised a respondent.

MULTIFAMILY HOUSING TEAMS 'INTEND TO USE' NEW PRODUCTS

Project teams showed interest in trying new K+B products, styles, or features in the future, even with the usual caution about "experimenting" with anything new.

K+B intend to use new product
Repondents expressed interest in trying new K+B products in future multifamily housing projects, notably water leak detection and notification systems.

FIRST-TIME USERS TRIED A WIDE VARIETY OF K+B AMENITIES

Some brave souls had actually used one or more new K+B products, styles, or features for the first time:

K+B products used first time
Multifamily housing teams took the plunge on more than 30 K+B product types, including specific brands.

 

CLICK HERE FOR FREE REPORT (SHORT REGISTRATION REQUIRED)

Related Stories

| Aug 11, 2010

10% of world's skyscraper construction on hold

Emporis, the largest provider of global building data worldwide, reported that 8.7% of all skyscrapers listed as "under construction" in its database had been put on hold. Most of these projects have been halted in the second half of 2008. According to Emporis statistics, the United States had been hit the worst: at the beginning of 2008, "Met 3" in Miami was the only U.S. skyscraper listed as being "on hold". In the second half of the year, 19 projects followed suit.

| Aug 11, 2010

Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report

A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Skanska completes $74 million Harbor Towers project six months ahead of schedule

Skanska USA Building Inc. announced the completion of a $74 million rehabilitation project at Harbor Towers, a 40-story luxury condominium complex comprising two towers located on Boston’s waterfront. Skanska served as Program Manager and oversaw the repair and replacement work that dramatically enhanced the reliability, cost-effectiveness, and energy efficiency of the buildings’ MEP systems.

| Aug 11, 2010

Best AEC Firms of 2011/12

Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +

| Aug 11, 2010

Manitoba Hydro Place, Tornado Tower among world's 'best tall buildings,' according to the Council on Tall Buildings and Urban Habitat

The Council on Tall Buildings and Urban Habitat last week announced the winners of its annual “Best Tall Building” awards for 2009, recognizing one outstanding tall building from each of four geographical regions: Americas, Asia & Australia, Europe, and Middle East & Africa. This year’s winners are: Manitoba Hydro Place, Winnipeg, Canada; Linked Hybrid, Beijing, China; The Broadgate Tower, London, UK; Tornado Tower, Doha, Qatar.

| Aug 11, 2010

Call for entries: Building enclosure design awards

The Boston Society of Architects and the Boston chapter of the Building Enclosure Council (BEC-Boston) have announced a High Performance Building award that will assess building enclosure innovation through the demonstrated design, construction, and operation of the building enclosure.

| Aug 11, 2010

CampusBrands Inc., NYLO Hotels team to launch student housing franchise brand

Which would you choose: the cramped quarters, thin mattresses, and crowded communal bathrooms of dormitory life or a new type of student housing with comfortable couches, a game room, fitness center, Wi-Fi in every room, flat-screen televisions and maybe even a theater?

| Aug 11, 2010

Portland Cement Association offers blast resistant design guide for reinforced concrete structures

Developed for designers and engineers, "Blast Resistant Design Guide for Reinforced Concrete Structures" provides a practical treatment of the design of cast-in-place reinforced concrete structures to resist the effects of blast loads.  It explains the principles of blast-resistant design, and how to determine the kind and degree of resistance a structure needs as well as how to specify the required materials and details.

boombox1 - default
boombox2 -
native1 -

More In Category

Mass Timber

Charlotte's new multifamily mid-rise will feature exposed mass timber

Construction recently kicked off for Oxbow, a multifamily community in Charlotte’s The Mill District. The $97.8 million project, consisting of 389 rental units and 14,300 sf of commercial space, sits on 4.3 acres that formerly housed four commercial buildings. The street-level retail is designed for boutiques, coffee shops, and other neighborhood services.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021