flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

EskewDumezRipple and Wolf Ackerman unveil the Center for Developing Entrepreneurs

Mixed-Use

EskewDumezRipple and Wolf Ackerman unveil the Center for Developing Entrepreneurs

The Charlottesville, Va. project is slated for completion later this year.


By David Malone, Associate Editor | April 20, 2021
CODE exterior aerial in Charlottesville

All renderings courtesy EskewDumezRipple

The Center for Developing Entrepreneurs (CODE), located in Charlottesville, Va., will provide 215,000-sf of multi-use space for entrepreneurs, designers, and developers, as well as ground floor retail. The project will act as a connective ligature between the institutional, commercial, and the historic avenues of the city.

CODE will feature an open-air, pedestrian gallery that will promote public circulation from the Mall to Water Street. At the center of the site there will be an exterior courtyard with a sunken water feature and amphitheater for public and private outdoor events. A series of planted rooftop terraces will be visible as the building steps up from the Mall to Water Street. These outdoor terraces will serve as work and gathering spaces for tenants on each floor.

 

CODE coworking commons

 

A variety of retail spaces will be included on the ground floor along with the main lobby entry on the Downtown Mall. A secondary entrance to the lobby will be provided on Water Street. The Water Street side lobby space will be able to double as a coworking studio when not being used as a 200-plus seat auditorium that serves both tenant specific and local community events.

One level of subgrade parking is included and will feature electric vehicle charging stations. Parking spaces have the ability to be converted to alternate uses in anticipation of evolving transportation trends.

 

CODE exterior during the day

 

The design employs systems and technologies that will increase the fresh air exchange and provide fine-tuned environmental controls allowing for natural ventilation and daylighting. Additionally, the building will harvest and reuse rainwater for green roof irrigation.

CODE is targeting LEED Gold certification and is slated for completion later this year.

 

CODE center courtyard space

 

The build team includes:

Design Architect: EskewDumezRipple

Architect of Record: Wolf Ackerman

Contractor: Hourigan Group

Civil Engineer: Timmons Group, Inc. 

Structural Engineer: Fox and Associates, Inc. 

Mechanical Engineer: 2RW Consulting Engineers

Electrical Engineer: 2RW Consulting Engineers

Landscape: Gregg Bleam Landscape Architect

 

CODE library space

 

CODE reception area

Tags

Related Stories

| Aug 11, 2010

Construction employment declined in 333 of 352 metro areas in June

Construction employment declined in all but 19 communities nationwide this June as compared to June-2008, according to a new analysis of metropolitan-area employment data released today by the Associated General Contractors of America.  The analysis shows that few places in America have been spared the widespread downturn in construction employment over the past year.

| Aug 11, 2010

Casino Queen breaks ground on $2.15 million entertainment venue

The Casino Queen in East St. Louis, Ill., is raising the stakes in its bid to capture a larger share of the local gaming market with the start of construction on a new $2.15 million sports bar and entertainment venue that will enhance the overall experience for guests.

| Aug 11, 2010

Outdated office tower becomes Nashville’s newest boutique hotel

A 1960s office tower in Nashville, Tenn., has been converted into a 248-room, four-star boutique hotel. Designed by Earl Swensson Associates, with PowerStrip Studio as interior designer, the newly converted Hutton Hotel features 54 suites, two penthouse apartments, 13,600 sf of meeting space, and seven “cardio” rooms.

| Aug 11, 2010

Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms

A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

10% of world's skyscraper construction on hold

Emporis, the largest provider of global building data worldwide, reported that 8.7% of all skyscrapers listed as "under construction" in its database had been put on hold. Most of these projects have been halted in the second half of 2008. According to Emporis statistics, the United States had been hit the worst: at the beginning of 2008, "Met 3" in Miami was the only U.S. skyscraper listed as being "on hold". In the second half of the year, 19 projects followed suit.

| Aug 11, 2010

Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report

A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Portland Cement Association offers blast resistant design guide for reinforced concrete structures

Developed for designers and engineers, "Blast Resistant Design Guide for Reinforced Concrete Structures" provides a practical treatment of the design of cast-in-place reinforced concrete structures to resist the effects of blast loads.  It explains the principles of blast-resistant design, and how to determine the kind and degree of resistance a structure needs as well as how to specify the required materials and details.

boombox1 - default
boombox2 -
native1 -

More In Category


MFPRO+ Special Reports

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021