flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Dallas Cowboys owner Jerry Jones breaks ground on $1 billion mixed-use development

Shopping Centers

Dallas Cowboys owner Jerry Jones breaks ground on $1 billion mixed-use development

The plan calls for retail space, including a Walmart, along with offices, apartments, and homes. 


By Mike Chamernik, Associate Editor | November 12, 2015
Construction begins on $1 billion Texas shopping center

Jerry Jones' $1 billion development is being built in Prosper, Texas. Photo: Colby Nate/Creative Commons

Construction has started on the first phase of Dallas Cowboys owner Jerry Jones' Gates of Prosper mixed-use development in Prosper, Texas.

According to the Dallas Morning News, Jones’ Blue Star Land paired with developer Lincoln Property to build the $1 billion development on 500 acres. The first project, a 300,000-sf shopping center on 93 acres, is under way. 

Jones bought the 500 acres of land nearly 20 years ago, but issues, incluing the recession of 2008, delayed building. The plan calls for retail space, including a Walmart, along with offices, apartments, and homes. 

Lincoln Property and Jones are also tied together for the Cowboys’ new team headquarters and event center in Frisco, which will open in 2016.

 

Site plan courtesy Lincoln Properties

Related Stories

| Mar 14, 2013

25 cities with the most Energy Star certified buildings

Los Angeles, Washington, D.C., and Chicago top EPA's list of the U.S. cities with the greatest number of Energy Star certified buildings in 2012.

| Feb 17, 2013

Pakistan to get world's tallest tower in $45 billion deal

Newly signed mega deal will fund construction of several massive developments in Karachi, including a mixed-use tower that will dwarf the Burj Khalifa.

| Oct 2, 2012

Mirvish and Gehry unveil conceptual design to transform Toronto’s entertainment district

Reimagining of King Street Entertainment District supports Toronto’s cultural corridor.

| Sep 20, 2012

Mid-box retail study shows lack of available sites in Chicago

Existing supply is tight everywhere and almost non-existent in the most attractive zones.

| Jul 20, 2012

2012 Giants 300 Special Report

Ranking the leading firms in Architecture, Engineering, and Construction.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 31, 2012

2011 Reconstruction Awards Profile: Ka Makani Community Center

An abandoned historic structure gains a new life as the focal point of a legendary military district in Hawaii.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1 - default
boombox2 -
native1 -

More In Category


Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.


Retail Centers

Retail design trends: Consumers are looking for wellness in where they shop

Consumers are making lifestyle choices with wellness in mind, which ignites in them a feeling of purpose and a sense of motivation. That’s the conclusion that the architecture and design firm MG2 draws from a survey of 1,182 U.S. adult consumers the firm conducted last December about retail design and what consumers want in healthier shopping experiences.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021