flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Crime fighter: San Diego County's new forensic facility helps battle crime in three ways

Building Team Awards

Crime fighter: San Diego County's new forensic facility helps battle crime in three ways

Silver Award: The 158,000-sf addition collocates three crime-fighting functions.


By Robert Cassidy, Executive Editor | June 19, 2019

San Diego County’s new crime lab is expected to earn LEED Gold honors. The project team used native plants and high-efficiency irrigation to slash potable water use for landscaping by 50%; installed low-flow fixtures to trim water use for indoor plumbing by 40%; and cut energy consumption by 21%. Solar arrays provide 20% of the building’s energy. More than 75% of construction waste was diverted from landfill. Photos: Matt Lindquist, Lindquist Photography.

The new San Diego County Sheriff's Crime Lab, Major Crimes, and Property & Evidence Unit Building is the latest addition to the County Operations Center in Kearney Mesa. It replaces a facility that was located in a converted hospital.

The 158,000-sf addition collocates three crime-fighting functions: the regional crime lab, which performs forensic examinations for more than 30 county, state, and federal law enforcement agencies; the major crimes division, which investigates the most serious crimes committed in the county; and the property and evidence unit, which previously was spread across two buildings.

SmithGroup designed a high-performance envelope appropriate to San Diego’s mild climate; as a result the team was able to reduce the size of the HVAC system. Degenkolb Engineers and vibration consultant Colin Gordon Associates designed the structural steel framework to just over 11 psf, well under the expected steel tonnage for a lab building.

 

 

LEED Gold certification is anticipated.

To safeguard the property and evidence unit, which is located in the basement, from moisture damage, DPR Construction waterproofed the 25-foot-high basement walls to the highest level of quality control and installed a permanent dewatering system—all work that had to be done through a record rain season.

The project team engaged in intensive planning and programming using parametric analysis to create a fully informed program. The resulting plan located the forensic activities on the west side of the building and the administrative space on the east. The laboratory itself is highly modular to allow for future adaptation.+


Building Team — Submitting firm SmithGroup (architect, MEP engineer), Owner County of San Diego, Department of General Services, Project manager PMA, SE Degenkolb Engineers, GC DPR Construction, CM Lowe Enterprises

General information — Size 158,000 sf, Construction cost $60 million, Construction time July 2016 to June 2018, Delivery method Design-build

 

Return to the Building Team Awards landing page

Related Stories

Building Team Awards | Jun 14, 2017

3D-printed office: Office of the Future

Dubai kicks off 3D-printing tech initiative with a novel office project.

Building Team Awards | Jun 14, 2017

A space for all: Lighthouse for the Blind and Visually Impaired

Nonprofit HQ fitout improves functionality, accessibility for blind and low-vision individuals.

Building Team Awards | Jun 13, 2017

Government campus reimagined: Intelligence Community Campus

Building Team converts 1940s campus into a sleek, modern home for U.S. intelligence agencies.

Building Team Awards | Jun 13, 2017

Secluded sanctuary: Alnoba leadership training center

Leadership training center becomes New England’s first Passive House building.

Building Team Awards | Jun 12, 2017

Circles and squares: Faena Arts Center

Silver Award: The Faena Arts Center’s forum is divided into two volumes, one a cylinder, the other a cube.

Building Team Awards | Jun 12, 2017

The right prescription: University of North Dakota School of Medicine & Health Sciences

Silver Award: North Dakota builds a new medical/health sciences school to train and retain more physicians.

Building Team Awards | Jun 12, 2017

Texas technopark: TechnipFMC John T. Gremp Campus

Silver Award: TechnipFMC’s new campus marks the start of a massive planned community in north Houston.

Building Team Awards | Jun 8, 2017

Quick turnaround: Partners HealthCare

Silver Award: A 2½-year project brings Partners HealthCare’s sprawling administrative functions under one roof.

Building Team Awards | Jun 8, 2017

Raising the bar: Zurich North American Headquarters

Silver Award: Forgoing a typical center-core design, the Zurich North America Headquarters rises 11 stories across three stacked bars.

Building Team Awards | Jun 8, 2017

Team win: Clemson University Allen N. Reeves Football Operations Complex

Silver Award: Clemson gets a new football operations palace, thanks to its building partners’ ability to improvise.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021