flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Crime fighter: San Diego County's new forensic facility helps battle crime in three ways

Building Team Awards

Crime fighter: San Diego County's new forensic facility helps battle crime in three ways

Silver Award: The 158,000-sf addition collocates three crime-fighting functions.


By Robert Cassidy, Executive Editor | June 19, 2019

San Diego County’s new crime lab is expected to earn LEED Gold honors. The project team used native plants and high-efficiency irrigation to slash potable water use for landscaping by 50%; installed low-flow fixtures to trim water use for indoor plumbing by 40%; and cut energy consumption by 21%. Solar arrays provide 20% of the building’s energy. More than 75% of construction waste was diverted from landfill. Photos: Matt Lindquist, Lindquist Photography.

The new San Diego County Sheriff's Crime Lab, Major Crimes, and Property & Evidence Unit Building is the latest addition to the County Operations Center in Kearney Mesa. It replaces a facility that was located in a converted hospital.

The 158,000-sf addition collocates three crime-fighting functions: the regional crime lab, which performs forensic examinations for more than 30 county, state, and federal law enforcement agencies; the major crimes division, which investigates the most serious crimes committed in the county; and the property and evidence unit, which previously was spread across two buildings.

SmithGroup designed a high-performance envelope appropriate to San Diego’s mild climate; as a result the team was able to reduce the size of the HVAC system. Degenkolb Engineers and vibration consultant Colin Gordon Associates designed the structural steel framework to just over 11 psf, well under the expected steel tonnage for a lab building.

 

 

LEED Gold certification is anticipated.

To safeguard the property and evidence unit, which is located in the basement, from moisture damage, DPR Construction waterproofed the 25-foot-high basement walls to the highest level of quality control and installed a permanent dewatering system—all work that had to be done through a record rain season.

The project team engaged in intensive planning and programming using parametric analysis to create a fully informed program. The resulting plan located the forensic activities on the west side of the building and the administrative space on the east. The laboratory itself is highly modular to allow for future adaptation.+


Building Team — Submitting firm SmithGroup (architect, MEP engineer), Owner County of San Diego, Department of General Services, Project manager PMA, SE Degenkolb Engineers, GC DPR Construction, CM Lowe Enterprises

General information — Size 158,000 sf, Construction cost $60 million, Construction time July 2016 to June 2018, Delivery method Design-build

 

Return to the Building Team Awards landing page

Related Stories

Building Team Awards | Jun 24, 2019

14 projects earn BD+C's 2019 Building Team Awards

The McDonald's Headquarters, the Rancho Los Amigos National Rehabilitation Center, and Pacific Visions at the Aquarium of the Pacific are three of the projects awarded with BD+C's 2019 Building Team Awards.

Building Team Awards | Jun 21, 2019

Up, up and away: Dutch hospitality chain completes the world's tallest modular hotel

Honorable mention: At 21 stories (15 of them modular), it is the world’s tallest modular hotel.

Building Team Awards | Jun 20, 2019

PPP gets the job done: Three-party deal saves time and money for client

Bronze Award: Weitz, acting as developer and design-builder, leased the land and borrowed the money for the project.

Building Team Awards | Jun 20, 2019

Making waves: The façade of Pacific Visions suggests the movement of water, day and night

Bronze Award: The new wing holds an exhibition space, a state-of-the-art 300-seat theater with a 32-foot-tall, 180-degree arc, 130-foot-long projection wall.

Building Team Awards | Jun 19, 2019

Unsung heroes: Two hurricanes couldn't stop this project team

Bronze Award: St. Lucie County’s population exploded to the point where the hospital needed lots more space.

Building Team Awards | Jun 18, 2019

Eyesore no more: People come together to expand a much-needed daycare center

Silver Award: Two problems quickly emerged: high concentrations of arsenic in the soil, and stormwater runoff into nearby wetlands and neighboring properties.

Building Team Awards | Jun 17, 2019

Campus renewal: Community effort saves a crucial healthcare resource

Silver Award: Taylor Design (architect) and SmithGroup (AOR) led an integrated design-build team anchored by McCarthy Building Companies (GC).

Building Team Awards | Jun 13, 2019

In the spotlight: Kinder High School for the Performing and Visual Arts shines a new beacon on Houston’s downtown

Gold Award: Kinder High School, which can accommodate 750 9th through 12th graders, is one of only three public schools in the U.S. that offer programs for both visual and performing arts.

Building Team Awards | Jun 12, 2019

Delectable design: A traditional French pastry was the concept behind the Krause Gateway Center

Gold Award: Krause Gateway Center’s striking design takes its cue from the traditional French dessert mille feuille.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021