flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

‘Cool’ pavement creates ice rink aesthetic outside NHL practice facility

Concrete

‘Cool’ pavement creates ice rink aesthetic outside NHL practice facility

The concrete contains unique colors, aggregates, and textures.


By David Malone, Associate Editor | April 7, 2017

Created from custom-designed mixes of decorative concrete, the hardscape outside of the Boston Bruins new Warrior Ice Arena and Practice Facility is both aesthetically pleasing and sustainable. The concrete contains unique colors, aggregates, and textures, as well as treatments to reduce the urban heat island effect, to achieve the desired look, while also meeting the project’s LEED certification goals. 

The project team worked with Aggregate Industries to develop the special mix using the company’s Artevia Color and Artevia Exposed decorative concrete products in white and gray, with a highly reflective coloring admixture from L.M. Scofield. 

The Artevia Color concrete, with onyx black and custom gray alternating strips, was placed at street level. The Artevia Exposed concrete, with colored stones and glass, was used for the elevated courtyard. 

The most unusual aspect of the hardscape is a 68-foot-high hockey stick surrounded by concrete pucks and large, sweeping patterns in the concrete to resemble skate marks on ice, at the arena’s main entrance.

Related Stories

Sports and Recreational Facilities | May 19, 2016

Audacy brings wireless lighting controls to Wrigley Field’s new clubhouse

The Audacy system uses a combination of motion sensors, luminaire controllers, light sensors, and switches that are all connected and coordinated by Gateways.

Sports and Recreational Facilities | May 6, 2016

NBA’s Atlanta Hawks to build new practice center with attached medical facilities

The team will have easy access to an MRI machine, 3D motion capture equipment, and in-ground hydrotherapy. 

BIM and Information Technology | May 2, 2016

How HDR used computational design tools to create Omaha's UNO Baxter Arena

Three years after writing a white paper about designing an arena for the University of Nebraska Omaha, HDR's Matt Goldsberry says it's time to cherry-pick the best problem-solving workflows.

Mixed-Use | May 1, 2016

A man-made lagoon with a Bellagio-like fountain will be the highlight of a mixed-use project outside Dallas

Construction will soon begin on housing, retail, and office spaces.

Sports and Recreational Facilities | Apr 17, 2016

An expanded and renovated complex brings together U. of Colorado’s sports programs

This two-year project enhances the experiences of athletes and fans alike.

Sports and Recreational Facilities | Apr 13, 2016

Cubs take a measured approach when planning HD video boards

Along with the mammoth and super-sharp video boards, Wrigley Field's 1060 Project includes renovated bleachers, upgraded player amenities, and more concourses, decks, and concessions.

Sports and Recreational Facilities | Apr 13, 2016

More than a game: 4 ways sports teams are adapting to changing fan preferences

As the cost of tickets, parking, and concessions skyrockets, while home theater technology becomes more affordable, fans wonder: Why even bother going to the game? Here’s how progressive sports owners and Building Teams are packing stadium seats.

Sports and Recreational Facilities | Apr 11, 2016

Chicago Cubs continue Wrigley Field renovations with new clubhouse

The team found 30,000 sf of space underneath an old parking lot, nearly tripling the size of the old clubhouse. 

Sports and Recreational Facilities | Apr 6, 2016

Las Vegas debuts another new arena, with a number of ‘firsts’

The gambling mecca has its eyes on attracting a pro sports team. 

Sports and Recreational Facilities | Apr 5, 2016

The importance of true cost-modeling for sports facilities

Many factors prevent sports facilities from immediate profitability. Rider Levett Bucknall’s Peter Knowles and Steve Kelly write that cost modeling, the process of estimating construction expenses by analyzing fixed and variable expenses, can push facility development to financial success.

boombox1 - default
boombox2 -
native1 -

More In Category


Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.


Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021