Committed to green-building practices and efficient radiant installations

Sponsored Content Plumbing

Committed to green-building practices and efficient radiant installations

It took five months for three dedicated crew members plus one runner to install 138,000 feet of PEX tubing with the Radiant Rollout Mats.


By Uponor | July 16, 2018
The Delta Electronics (America’s) 170,000-square-foot headquarters

The Delta Electronics (America’s) 170,000-square-foot headquarters is a LEED Platinum, net-zero energy building in Fremont, Calif.

When Delta Electronics (Americas) expanded its headquarters in Fremont, Calif., they leaned on the company’s mission “to provide innovative, clean and energy-efficient solutions for a better tomorrow.” The headquarters is a shining example of creative thinking paired with a desire to protect the environment to develop their 12th green building worldwide.

To help meet the LEED® Platinum and net-zero energy building standards, the company chose to go with a radiant heating and cooling system from Uponor. Originally specified for a conventional radiant tubing installation, the mechanical contractor, ACCO Engineered Systems, suggested changing the specification to Uponor’s Radiant Rollout™ Mats for a faster, more efficient and consistent installation. ACCO had recently completed several large commercial projects using the mats, including the Pier 15 Exploratorium in San Francisco and the SMUD (Sacramento Municipal Utility District) building.

ACCO, in conjunction with Sean Timmons of ALFATECH-Timmons, and Osborne Company, an Uponor rep firm, designed the radiant heating and cooling system using the mats for the 170,000-square-foot campus. The radiant slabs are the primary cooling and heating systems in the campus buildings so it was crucial for the design to ensure comfort as well as the desired energy efficiencies.

Due to their previous experience with the Radiant Rollout Mats, ACCO spent a considerable amount of time up front designing the slab construction, the sequence of the slab construction and how the mats would be fabricated to align with the installation thought process. “We eliminated a lot of potential problems up front – lessons that we learned on other projects,” said Jonathan Bell, ACCO project manager.

 

The headquarters includes a radiant heating and cooling system The headquarters includes a radiant heating and cooling system featuring 138,000 feet of PEX tubing installed via Radiant Rollout™ Mats from Uponor.

 

It took five months for three dedicated crew members plus one runner to install 138,000 feet of PEX tubing with the Radiant Rollout Mats. It would have taken much more time – and labor – to install the tubing using conventional PEX rails or tie-down methods.

The installers needed a bit of onsite training to get up to speed, and the first couple of circuits went in a little slower while Osborne Company helped demonstrate efficiencies and effective ways to speed up the installation. “But it didn’t take long for the crew to have a full understanding of the processes, and they quickly picked up the pace for the rest of the installation,” Bell said.

As with any project, there are challenges to overcome in buildings of this magnitude. “Having to accommodate physical building changes that occurred after we had procured the material was one of the challenges we had to work with,” Bell said. “And construction delays threated to leave the tubing exposed to the sun for longer periods of time than we had anticipated. We had to do some quick thinking to make sure the tubing was protected from possible prolonged sun damage.”

Osborne, the Uponor rep firm, became an instrumental strategic partner in helping overcome and solve these unique challenges, and Bell is pleased with the process, the solutions and how quickly the crew installed the Radiant Rollout Mats.

“For large, open circuits, the installation of the Radiant Rollout Mats is much quicker than laying down regular tubing,” he said. “And the prefabricated and labelled mats allows for more efficient material handling onsite, which is very important in these large installations.”

 

Uponor

800.321.4739

uponorpro.com

Tags

Related Stories

Sponsored | Plumbing | Aug 4, 2017

Shower threshold height – a better shower from the ground up!

Getting the right threshold height for your code-compliant shower installation is critical. In this blog post, we will consider how shower and shower-pan threshold heights work and why they are important for successfully meeting accessibility code requirements.

Sponsored | Plumbing | Aug 2, 2017

The new commercial restroom relies on durability and style

Architects and designers should look for well-designed products that can stand up to the daily demands of such frequented spaces.

Sponsored | HVAC | Apr 6, 2017

Viega ProPress shines in SolarCity construction

Buffalo will be the first city to produce the first-ever true solar roof – a roofing product with solar panels built in.

Architects | Apr 4, 2017

Architect Howard Elkus dies at 78

Cofounder of Elkus Manfredi Architects, his career spanned five decades, and included a spectrum of major design projects. 

Sponsored | Plumbing | Feb 22, 2017

Press pipe-joining provides valuable savings on potable water installation at Mercy Health – West Hospital

Nelson Stark selected Viega ProPress for the plumbing installation because the system is flameless and can be installed simultaneously with other utilities since there’s no need for welding or grooving equipment.

boombox1 - default
boombox2 -
native1 -

More In Category


Plumbing

EPA to revise criteria for WaterSense faucets and faucet accessories

The U.S. Environmental Protection Agency (EPA) plans to revise its criteria for faucets and faucet accessories to earn the WaterSense label. The specification launched in 2007; since then, most faucets now sold in the U.S. meet or exceed the current WaterSense maximum flow rate of 1.5 gallons per minute (gpm). 



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021