Committed to green-building practices and efficient radiant installations

Sponsored Content Plumbing

Committed to green-building practices and efficient radiant installations

It took five months for three dedicated crew members plus one runner to install 138,000 feet of PEX tubing with the Radiant Rollout Mats.


By Uponor | July 16, 2018
The Delta Electronics (America’s) 170,000-square-foot headquarters

The Delta Electronics (America’s) 170,000-square-foot headquarters is a LEED Platinum, net-zero energy building in Fremont, Calif.

When Delta Electronics (Americas) expanded its headquarters in Fremont, Calif., they leaned on the company’s mission “to provide innovative, clean and energy-efficient solutions for a better tomorrow.” The headquarters is a shining example of creative thinking paired with a desire to protect the environment to develop their 12th green building worldwide.

To help meet the LEED® Platinum and net-zero energy building standards, the company chose to go with a radiant heating and cooling system from Uponor. Originally specified for a conventional radiant tubing installation, the mechanical contractor, ACCO Engineered Systems, suggested changing the specification to Uponor’s Radiant Rollout™ Mats for a faster, more efficient and consistent installation. ACCO had recently completed several large commercial projects using the mats, including the Pier 15 Exploratorium in San Francisco and the SMUD (Sacramento Municipal Utility District) building.

ACCO, in conjunction with Sean Timmons of ALFATECH-Timmons, and Osborne Company, an Uponor rep firm, designed the radiant heating and cooling system using the mats for the 170,000-square-foot campus. The radiant slabs are the primary cooling and heating systems in the campus buildings so it was crucial for the design to ensure comfort as well as the desired energy efficiencies.

Due to their previous experience with the Radiant Rollout Mats, ACCO spent a considerable amount of time up front designing the slab construction, the sequence of the slab construction and how the mats would be fabricated to align with the installation thought process. “We eliminated a lot of potential problems up front – lessons that we learned on other projects,” said Jonathan Bell, ACCO project manager.

 

The headquarters includes a radiant heating and cooling system The headquarters includes a radiant heating and cooling system featuring 138,000 feet of PEX tubing installed via Radiant Rollout™ Mats from Uponor.

 

It took five months for three dedicated crew members plus one runner to install 138,000 feet of PEX tubing with the Radiant Rollout Mats. It would have taken much more time – and labor – to install the tubing using conventional PEX rails or tie-down methods.

The installers needed a bit of onsite training to get up to speed, and the first couple of circuits went in a little slower while Osborne Company helped demonstrate efficiencies and effective ways to speed up the installation. “But it didn’t take long for the crew to have a full understanding of the processes, and they quickly picked up the pace for the rest of the installation,” Bell said.

As with any project, there are challenges to overcome in buildings of this magnitude. “Having to accommodate physical building changes that occurred after we had procured the material was one of the challenges we had to work with,” Bell said. “And construction delays threated to leave the tubing exposed to the sun for longer periods of time than we had anticipated. We had to do some quick thinking to make sure the tubing was protected from possible prolonged sun damage.”

Osborne, the Uponor rep firm, became an instrumental strategic partner in helping overcome and solve these unique challenges, and Bell is pleased with the process, the solutions and how quickly the crew installed the Radiant Rollout Mats.

“For large, open circuits, the installation of the Radiant Rollout Mats is much quicker than laying down regular tubing,” he said. “And the prefabricated and labelled mats allows for more efficient material handling onsite, which is very important in these large installations.”

 

Uponor

800.321.4739

uponorpro.com

Tags

Related Stories

Sponsored | Plumbing | Nov 13, 2015

Getting the Most Value When You Value Engineer DWV Systems

There are lots of places in a DWV system where value can be captured, but there are applications where what looks like value can mask risks that you might not want to take.

Sponsored | Plumbing | Oct 9, 2015

Porsche luxury meets Viega innovations

Occupants of the Porsche Design Tower on the shoreline of Florida’s Sunny Isles Beach will experience the best view in the city

Sponsored | Plumbing | Aug 18, 2015

​Make sure the money you save in VE isn't destroyed in a lawsuit

​Getting the PVC vs. Cast Iron choice right

Sponsored | Plumbing | Mar 13, 2015

Viega ProPress for stainless looks good at UNH

One of the oldest buildings on the University of New Hampshire (UNH) campus, Huddleston Hall is a multipurpose facility, which includes dormitories, classrooms and an event center.

Building Materials | Feb 19, 2015

Prices for construction materials fall in January, following plummet of oil prices

The decline in oil and petroleum prices finally showed up in the produce price index data, according to ABC Chief Economist Anirban Basu.

| Dec 8, 2014

The global sanitation crisis leads to 2.5 million deaths every year

When we see the incredible technology being produced by global plumbing manufacturers, it’s hard to conceive why no viable technical solution to the global sanitation issue has come forth, writes BD+C's Robert Cassidy.

boombox1 - default
boombox2 -
native1 -

More In Category


Plumbing

EPA to revise criteria for WaterSense faucets and faucet accessories

The U.S. Environmental Protection Agency (EPA) plans to revise its criteria for faucets and faucet accessories to earn the WaterSense label. The specification launched in 2007; since then, most faucets now sold in the U.S. meet or exceed the current WaterSense maximum flow rate of 1.5 gallons per minute (gpm). 



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021