In early December, Liu Zhangning was tending her cabbage patch when she saw a tall yellow construction crane in the distance. At night, the work lights made it seem like day.
Fifteen days later, a 30-story hotel towered over her village on the outskirts of the city like a glass and steel obelisk.
"I couldn't really believe it," Liu said. "They built that thing in under a month."
A time-lapse video of the project in Changsha, which shows the prefabricated building being assembled on site, has racked up more than 5 million views on YouTube and left Western architects speechless.
"I've never seen a project go up this fast," said Ryan Smith, an expert on prefabricated architecture at the University of Utah.
In other countries, the most advanced prefab construction methods can reduce building times by a third to half, Smith said. The builders of the Changsha hotel did better, knocking one-half to two-thirds off the normal schedule.
"It's unfathomable," Smith said.
The warp-speed construction is a startling illustration of the building boom in China, where an exodus from the countryside to the cities has swelled the urban population by almost 400 million since 1990.
Click here to read more and to view a time lapse video of the construction. BD+C
Related Stories
| May 11, 2012
AIA launches education and training portal
New portal to host Contract Documents training, education resources in one convenient place.
| May 10, 2012
Chapter 7 When Modern Becomes Historic: Preserving the Modernist Building Envelope
This AIA CES Discovery course explores the special reconstruction questions posed by Modern-era buildings.
| May 10, 2012
Chapter 6 Energy Codes + Reconstructed Buildings: 2012 and Beyond
Our experts analyze the next generation of energy and green building codes and how they impact reconstruction.
| May 10, 2012
Chapter 5 LEED-EB and Green Globes CIEB: Rating Sustainable Reconstruction
Certification for existing buildings under these two rating programs has overtaken that for new construction.
| May 10, 2012
Chapter 4 Business Case for High-Performance Reconstructed Buildings
Five reconstruction projects in one city make a bottom-line case for reconstruction across the country.
| May 10, 2012
Chapter 3 How Building Technologies Contribute to Reconstruction Advances
Building Teams are employing a wide variety of components and systems in their reconstruction projects.
| May 10, 2012
Chapter 2 Exemplary High-Performance Reconstruction Projects
Several case studies show how to successfully renovate existing structures into high-performance buildings.
| May 9, 2012
Chapter 1 Reconstruction: ‘The 99% Solution’ for Energy Savings in Buildings
As a share of total construction activity reconstruction has been on the rise in the U.S. and Canada in the last few years, which creates a golden opportunity for extensive energy savings.
| May 9, 2012
International green building speaker to keynote Australia’s largest building systems trade show
Green building, sustainability consultant, green building book author Jerry Yudelson will be the keynote speaker at the Air-Conditioning, Refrigeration and Building Systems (ARBS) conference in Melbourne, Australia.
| May 9, 2012
Tishman delivers Revel six weeks early
Revel stands more than 730 feet tall, consists of over 6.3 milliont--sf of space, and is enclosed by 836,762-sf of glass.