flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Building Team Awards Tip Sheet

Building Team Awards

Building Team Awards Tip Sheet


By BD+C Staff | March 12, 2021

Keep this tip sheet handy when preparing your Building Team Awards entry, as these are some items on which your project will be judged. Note: Your project may not touch on all these items. This is meant to be a checklist to guide your submittal.

 

Design, Engineering and Construction Considerations (50%)
 

  • Land use planning, zoning, codes, regulations, etc.
  • Overall quality of the design
  • M/E/P innovations, fresh approaches
  • Energy/environment breakthroughs
  • Sustainable design, green building design, LEED
  • Structural engineering issues and solutions
  • Innovative construction methods, solutions
  • Construction safety (extraordinary factors)
  • Construction & demolition waste recycling efforts
  • Unusual scheduling or timing demands (and solutions)
  • Inventive use of materials; use of unusual or new materials
  • Craftsmanship, detailing, elegance of execution
  • Use of innovative technology, methods, tools
  • Patents or inventions resulting from project
  • Cost/budget issues – and evidence of resolution
  • Evidence of performance-based design
  • Security issues, unusual approaches, results
  • Wayfinding; ADA considerations
  • Commissioning results
  • Post-occupancy evaluation; evidence of owner/user satisfaction
  • Overall project quality and functionality
  • Social or cultural relevance of project
  • Other measures of success (job creation, neighborhood renewal, ADA, etc.)
  • Project complexity: Was it especially challenging? In what way?
  • Unusual owner/client requirements
  • Site planning, parking, landscaping, user access

SUMMARY: How did the project push the envelope?

 

Building Team Collaboration + Involvement of Community, End Users & Stakeholders (50%)
 

  • Evidence of extraordinary efforts to meet owner needs
  • Involvement of surrounding community, neighbors, affected stakeholders
  • Involvement of public officials, public agencies
  • Charettes, planning sessions with community, end users, other relevant stakeholders
  • Attention to surrounding environment, historic areas, community sensitivities
  • Attention to environmental issues: wetlands, open space, recreation areas, etc.
  • Extensive surveying, polling, or other techniques to gauge public opinion or gather ideas
  • Unusual “gaming” or innovative tools to assess client or end-user needs
  • Evidence of involvement of ‘less-empowered end-users’ (students in school project, nurses in hospital, minorities, disabled, etc.)
  • Overcoming unanticipated changes in the program
  • Overcoming natural disaster (flood, hurricane), man-made disaster (loss of power supply), materials shortages
  • Unusual team-based solutions to budget restrictions, value engineering
  • Unusual team-based solutions to keep project schedule on time
  • Extraordinary effort in hiring women- or minority-owned firms
  • Special social or cultural relevance of the project
  • Additional measures of community-related success (jobs, neighborhood renewal, etc.)
  • Special aspects related to user-occupant-tenant needs

SUMMARY: Did the project perform a public good? How?

Related Stories

Architects | Jan 18, 2016

EHDD’s Monterey Bay Aquarium wins AIA Twenty-five Year Award

The aquarium set new technical standards for the building type, which still influence today, such as the flow-through seawater-based heat pump system, naturalistic exhibitions, and corrosion protection.

Building Team Awards | Apr 10, 2015

14 projects that push AEC teaming to the limits

From Lean construction to tri-party IPD to advanced BIM/VDC coordination, these 14 Building Teams demonstrate the power of collaboration in delivering award-winning buildings. These are the 2015 Building Team Award winners.

Building Team Awards | Apr 10, 2015

Prefab saves the day for Denver hospital

Mortenson Construction and its partners completed the 831,000-sf, $623 million Saint Joseph Hospital well before the January 1, 2015, deadline, thanks largely to their extensive use of offsite prefabrication.

Building Team Awards | Apr 10, 2015

Anaheim’s soaring intermodal hub

Anaheim's Regional Transportations Intermodal Center is the largest ETFE project in North America.

Building Team Awards | Apr 10, 2015

Virtual collaboration helps complete a hospital in 24 months

PinnacleHealth needed a new hospital STAT! This team delivered it in two years, start to finish.

Building Team Awards | Apr 10, 2015

New arts venue reinvigorates Virginia Tech's campus

The STV-led Building Team creates a world-class performance and arts venue with learning and entrepreneurial dimensions.

Building Team Awards | Apr 9, 2015

Multifaced fitness center becomes campus landmark

A sloped running track and open-concept design put this Building Team to the test. 

Building Team Awards | Apr 9, 2015

Nation's first LEED-certified bus depot

A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.

Building Team Awards | Apr 9, 2015

Setting the bar for port-of-entry design

Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.

Building Team Awards | Apr 9, 2015

Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C

Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021